1.1.1 Project Name 200 tons of waste gasification power generation project 1.1.2 Project Overview The raw materials used every day is 200 tons of garbage. 1.1.3 the goal of building Selection of advanced gasification technology, the stable operation of process equipment, the most mature and reliable power generation equipment, to ensure the long-term stable operation. 1.1.4 The construction content and scale 200 tons of refuse daily handling the project using refuse as raw materials, refuse heat vent into the main process, gas electricity use for the purpose of the technical program to gasification occur. The project will construct a set of waste transport and pretreatment system; transport slag system set; pyrolysis of two sets of dry distillation gasification system; a set of control systems and ancillary equipment; 10 units of 500kW containerized generator sets. 1.2 The design information 1.2.1 The waste disposal amount. Other data: The raw materials used every day is 200 tons of garbage. 1.2.2 The basic design parameters 1.2.2.3 Gas production: Design parameters per ton can be gasified waste every day, 1500m ³ gasification gas, the basis of waste gasification of garbage 80% of gas production in the gasifier day of 1500 × 200 × 80% = 240 000 m³. The annual output volume: 87.6 million m³ 1.2.3 The installed capacity and gas generating capacity calculation This project daily gas 240000m3, in LHV 5MJ to the take the gas / m3. daily gas heating value of 240 000 x 5 = 1.2 million MJ / d, and if used for power generation, configuration wins move the straw gas generator set, heat consumption rate of 10.5 MJ / kW • h, the daily generation capacity 1200000/10.5 =114285kW • h / d, the average daily run 24 hours, you can configure the generator set is 142 857/24 =4761.87kW, it is recommended that configuration 10 the 500kW winning move generator group.
The total price of this item: 6832217.6USD, excluding civil work, international transportation, and custom clearance.
Quotation code: 6253020120507
Yangchunlin
|