Quotation of electric equipment for Turkey 2x12MW Hydro Power Plant |
No. |
Item |
Type |
Unit |
Qty. |
Unit Fob Price |
Total |
Unit Weight |
USD |
USD |
Ton |
2.00 |
Electrical & Ancillary Equipment |
a |
Control Panel |
- |
Low voltage panel 380 Volt, c/w control, protection& metering |
- |
Dynamo control, protection& metering panel(发电机保护测控屏) |
含发电机差动、后备�测控、接地�失磁保护单元模块 |
Nr |
2.00 |
10.00 |
39,682.54 |
/FONT> |
- |
DC charge panel(110V,400Ah) |
含高频开关电源�充电模块、交流进线�直流出线 |
Nr |
1.00 |
15.00 |
29,761.90 |
/FONT> |
- |
Battery panel |
含蓄电池组及检��装置 |
Nr |
1.00 |
25.00 |
49,603.17 |
/FONT> |
- |
Panel synchronizing 380 Volt |
/FONT> |
/FONT> |
/FONT> |
/FONT> |
-- |
Automatization(机组自动化屏) |
�?/FONT>PLC、同期装置�转�信号装置、温度巡检��置�出口继电�?/FONT> |
Nr |
2.00 |
10.00 |
39,682.54 |
/FONT> |
b |
Transformer |
/FONT> |
/FONT> |
/FONT> |
/FONT> |
0.00 |
/FONT> |
/FONT> |
transformer |
SF10-13600kVA 6.3kV/ 35 kV |
nr |
2.00 |
150.00 |
595,238.10 |
/FONT> |
/FONT> |
Auxiliary transformer 10 kV / 400 Volt Capacity 100 kva |
SC-250 KVA 35/ 0.4kV |
/FONT> |
1.00 |
50.00 |
99,206.35 |
/FONT> |
/FONT> |
DIESEL |
250 KVA |
Nr |
1.00 |
30.00 |
59,523.81 |
/FONT> |
c |
Medium Voltage Switchgear |
/FONT> |
/FONT> |
/FONT> |
/FONT> |
/FONT> |
/FONT> |
/FONT> |
/FONT> |
KYN1- 10 (vacuum breaker, Arrester) |
/FONT> |
10.00 |
20.00 |
396,825.40 |
/FONT> |
/FONT> |
/FONT> |
KYN10- 40.5 (vacuum breaker, Arrester) |
/FONT> |
4.00 |
30.00 |
238,095.24 |
/FONT> |
/FONT> |
/FONT> |
/FONT> |
/FONT> |
/FONT> |
/FONT> |
/FONT> |
/FONT> |
/FONT> |
Transformer protection unit |
DMP-329B |
set |
2.00 |
1.00 |
3,968.25 |
/FONT> |
/FONT> |
Transformer differential protection unit |
DMP-323B |
set |
2.00 |
1.00 |
3,968.25 |
/FONT> |
/FONT> |
Aux. Transformer protection unit |
DMP-323B |
set |
1.00 |
1.00 |
1,984.13 |
/FONT> |
d |
LV Switchgear |
/FONT> |
/FONT> |
/FONT> |
/FONT> |
/FONT> |
/FONT> |
/FONT> |
LV Switchgear |
GCS |
set |
5.00 |
10.00 |
99,206.35 |
/FONT> |
e |
Grounding & lightning arrester |
/FONT> |
/FONT> |
/FONT> |
/FONT> |
/FONT> |
/FONT> |
-- |
Neutral grounding panel c/w |
steel-40*4 |
t |
3.00 |
/FONT> |
0.00 |
/FONT> |
steel-25*4 |
t |
2.00 |
/FONT> |
0.00 |
/FONT> |
/FONT> |
Cable pipe |
/FONT> |
t |
5.00 |
/FONT> |
0.00 |
/FONT> |
-- |
Arrester |
/FONT> |
set |
1.00 |
1.00 |
1,984.13 |
/FONT> |
f |
Cable pipe |
/FONT> |
/FONT> |
/FONT> |
/FONT> |
/FONT> |
/FONT> |
/FONT> |
LV Cable, NYY |
ZR-VV22-3×95�?/FONT>1×50mm2 |
km |
0.10 |
30.00 |
5,952.38 |
/FONT> |
-- |
MV Cable XLPE |
YJV22-3×185 mm2�?/FONT>10KV |
km |
0.60 |
40.00 |
47,619.05 |
/FONT> |
-- |
Control cable |
KVV-4×2.5 |
km |
1.00 |
1.00 |
1,984.13 |
/FONT> |
/FONT> |
/FONT> |
KVV-10×1.5 |
km |
2.00 |
3.00 |
11,904.76 |
/FONT> |
/FONT> |
/FONT> |
HPVV-2×2×0.5 |
km |
0.50 |
1.10 |
1,091.27 |
/FONT> |
/FONT> |
Bus bars GFM�?/FONT>10Kv,2000A�?/FONT> |
/TD>
| km |
0.20 |
400.00 |
158,730.16 |
/FONT> |
g |
Lighting |
/FONT> |
/FONT> |
/FONT> |
/FONT> |
/FONT> |
/FONT> |
/FONT> |
Lighting |
/TD>
| set |
1.00 |
30.00 |
59,523.81 |
/FONT> |
h |
CONTROL |
/TD>
| /FONT> |
/FONT> |
/FONT> |
/FONT> |
/FONT> |
/FONT> |
CONTROL |
/TD>
| set |
1.00 |
200.00 |
396,825.40 |
/FONT> |
/FONT> |
Total |
/FONT> |
/FONT> |
/FONT> |
/FONT> |
2,342,361.11 |
/FONT> |
Main technical parameter of Hydro power plant unit
1 Impulse turbine
Type:CJA475-L-146/4×13.2
Output of Turbine N turbine= 12370 kW
H= 333.09 m
Q= 4.21 m3 /second
Efficiency= 90%
Speed= 500 r/min
2 Generator
Type:SF12-12/2860
Output of Generator N generator = 12000 kW
V= 10.5 kV
Efficiency = 97%
n= 500 r/min
3 Main Valve
Type of rotary valve:JZQ-00/Ф1000×4
Diameter:1.0 m
Oil pressure: 4.0 MPa
4 Oil pressure unit for main valve
Type:HYZ-1-4
Volume of pressure tank:1 m3
Oil pressure: 4.0 MPa
5 Governor
Type of governor of computer control: CJWT-4/4
Oil pressure: 4.0 MPa
Quantity. of nozzle mouth:4
6 Excitation unit
Type of static excitation unit:KLSF-2
1. quotation is on China Port Fob
2. Quotation is based on ratio of USD: Chinese Currency of 6.7, if changed, quotation to be adjusted accordingly.
3. some of the items quotation is not provided at this time due to be procured from others, if contracted, we will quote too.
4. step up transformer is designed to 110kv, and other 110kv equipments are not quoted.
5. quotation validity: 20 days
|