BBS  Email&MSN: [email protected]
  
Homepage   |   Power Generation   |   Project Financing    |   Equipments   |   Transmission   |   News   |   Contact    |   services   |   download   |   sitemaps   |   Business Opportunity   |   BBS-Blog   |   Purchasing-agent   |   Exchange Link  

Mail List

E-mail:

Equipments
    Gas turbine & spare parts   
      GE 9FA 255mw Gas Turbine Generator   
      GE Licensed MS9001E Series Gas Turbine plant   
      42MW GE Gas Turbine Generator   
      PG6581B Gas Turbine Series Generator Plants   
      PG6581B Gas Turbine Set Supply Scope   
      Gas Turbine Spare Parts   
      Gas Turbine Generator Site Inspection   
      2MW Gas Turbine Generator   
      7mw-Siemens-SGT200-Gas-Turbine-Cogeneration-unit   
      10MW Gas Turbine Generator   
      Used Gas Turbine Generator Plant   
      Technical-Specification-PG6581B-Gas-Turbine   
      Supply-Scope-of-PG6581B-Gas-Turbine   
      Budgetary Cost for 108MW Gas Turbine Plant   
      Siemens Gas Turbine Generator   
    Steam Turbine   
      Extraction Condensing Turbine   
      Condensing Steam Turbine   
      Recovery Turbine   
      Extraction Turbine   
      Required Data for Quotation   
      Alstom-Licensed-330MW-Steam-Turbine   
      Quotation-50MW-condensing-steam-turbine   
      Quotation-30MW-Condesing-Steam-Turbine   
    Boiler   
    Power Plant Generator   
      Air Cooled Power Generator   
    Diesel generator   
      8x8735kw MAN 18V32/40 HFO Diesel power Proposal   
      8x 4.1mw MAN 9L32/40 hfo power plant proposal   
      6 units 5.5mw MAN 12V32/40 hfo diesel plant   
      3x3.5mw MAN 8L 32/40 hfo diesel generator plant   
      1MW diesel generator    
      1.5MW Diesel Generator Set   
      2M Diesel Generator Plant   
      Sample Diesel Power Plant Proposal 9x2mw   
      Diesel power Plant List   
      Used Diesel Generator   
      Diesel Generator Pictures   
      Bio diesel generator power plant MW   
      Sample Pack List for 10x2MW HFO diesel power Plant   
      10kw-4000kw-Cummins-MTU-diesel-generator-set   
    Hydro Turbine   
    Engineering Machinery   
      Truck Mounted Crane Crawler   
      Trailer Concrete Pump   
      China Bulldozer   
      China Crane   
      Benz Truck and Lorry from China   
    Cable&Wire   
    Electric Motor   
    Transformer in MVA   
      Germany Certificates   
      Required Data for Quotation   
      Transformer Reference   
      Sample Inquiry   
    Wind Turbine Generator   

Diesel Generator Proposal

Power Plant Proposal

 

Home > Equipments > Diesel generator - Sample Questionnaire for HFO genset Quotation


 

Sample Questionnaire for HFO genset Quotation

QUESTIONNAIRE FOR GAS / HFO / LIQUID FUEL BASED POWER PLANT
 
INFORMATION REQUIRED FOR SELECTION / SIZING / DESIGN OF POWER PLANT
 
A     SITE CONDITIONS
 
      1)   Altitude (450 m above Sea Level)
 
      2)   Maximum Ambient Temp. (48 ° C) 
 
      3)   Relative Humidity at Maximum Ambient (30 %)
 
      4)   Wet Bulb Temperature of the Area (??° C)
 
      5)   Environment  (Dusty / Clean)
 
      6)   Presence of any Hazardous or Chemically Active Gases In Surrounding Air NO
 
      7)   Soil Condition at site (normal, marshy, black cotton etc.) Stony Sand/Clay
 
      8)   Soil bearing capacity (< 15 tons/m2 or > 15 tons/m2)
 
      9)   Water table at site -45m
 
 
B    POWER REQUIREMENT (As discussed personally present conditions given )
 
      1)   Maximum Demand (46.000 kVA)
 
      2)   Minimum continuous process loads (38.000kVA / kW)
 
      3)   Grid Voltage and Frequency 33.000 Volt
            Variation Percentage unknown
 
      4)   Whether Independent Auxiliary Power Supply (415 V) available yes   
 
      5)   Proposed Power Plant capacity (46 MW)
 
 
C    STEAM REQUIREMENT (IF ANY) NONE
 
      1)   For process Steam (Quantity T/hr, pressure)
 
      2)   For air-conditioning / chillers etc (quantity T/hr., pressure)
 
      3)   For fuel heating only
 
      4)   Existing Boiler(s) details
 
D    FUEL
 
      1)   Type of fuel to be used HPS / LSHS / FO / LDO / HSD / NG / BIOGAS
            (Please provide specifications of fuel, in case of Gas Annexure IV shall be filled also)
Specification of HFO provided by the Purchaser

Nr.
Parameter
Standard
Unit
Value
1
Water Content
DIN 51 777
Vol.-%
0,418
2
Caloric Value
DIN 51 900
kJ/kg
40,974
3
Carbon
DIN 51 732
Vol.-%
84,6
4
Hydrogen
DIN 51 732
Vol.-%
11,4
5
Nitrogen
DIN 51 732
Vol.-%
0,21
6
Sulfur
DIN 51 724
Vol.-%
1,14
7
Density at 15 degrees Celsius
DIN 51 757
g/cm³
0,946
8
Viscosity at 40 degrees Celsius
DIN 51 562
mm²/s
175,3
9
Oxide ashes
DIN EN ISO 6245
Vol.-%
5,81
10
Ignition Point
DIN EN 22719
Degrees Celsius
77
11
Arsenic
DIN 11885
mg/kg
< 1,5
12
Lead
DIN 11885
mg/kg
12,4
13
Cadmium
DIN 11885
mg/kg
< 1,0
14
Chrome
DIN 11885
mg/kg
<1,0
15
Tin
DIN 11885
mg/kg
<1,5
16
Cobalt
DIN 11885
mg/kg
<1,0
17
Nickel
DIN 11885
mg/kg
26,7
18
Mercury
DIN 1483
mg/kg
<0,1
19
Zinc
DIN 11885
mg/kg
2,4
20
Vanadium
DIN 11885
mg/kg
60,9

 
 
      2)   Approximate price of fuel at site
 
      3)   Design Viscosity of Fuel handling System (180 or 380 cSt at 50°C) see specs above
 
      4)   Fuel Handling and Storage Facility at site (If any for existing Generating Sets)
Tanks for 15.000 m³ for HFO are available; Pipeline for refilling is in place, all other tanks for heating and handling of fuel to be provided by supplier.
 
INFORMATION REQUIRED TO DETERMINE OPERATING PHILOSOPHY
 
A    POWER PLANT OPERATION (Continuous / Base Load / Standby / Emergency / Peaking)
 
B    PARALLEL OPERATION
     
1)       With grid ( Yes / No )
(this will be separate option, offer to be done as stand alone solution and just connected to the existing transformer station at the cement plant 6.600 V 50 Hz)
 
      2)   Between proposed DG Sets  (Yes / No )     
 
      3)   With existing DG / TG Sets (Yes / No)
 
            Details of existing DG /TG sets (if parallel operations req.)
            i) Supplier / Model    / Name plate details
            ii) Rating (kVA / kW)
            iii) Make / Model / Type of Governor
            iv) Type of Excitation / AVR
            v) Synchronization Facility
 
 
C    SPECIAL REQUIREMENTS
 
1)       Motor Starting Duty  (If any) NO
(If yes, please provide details wherever possible)
     
2)       Furnace application
(If yes, please provide details wherever possible)
 
      3)   Non-linear Thyristor Loads, if any
 
      4)   Any other non-standard loads, if any
 
      5)   Voltage requirement (3.3 / 6.6 / 11 kV)
 
      6)   Water Availability 120 m³ per hour
(but use of more than 50m³ will not be accepted, please provide large Heat Exchangers with low flow rate)                            (Sufficient- Cooling Towers, Scarce - Radiators)
 
INFORMATION ABOUT THE CLIENT (PURCHASER / OWNER COMPANY)
 
 
      1)   Annual Turnover of the Company �?700.000.000.-
 
      2)   Main Product and installed capacity Construction materials
 
      3)   Location of the Site
 
      4)   Availability for proposed Power plant at site immediately
 
      5)   Contact Person at Site
            Address / Telephone / Fax # undersigned
 
      6)   Whether power requirement is for existing plant to be revamped /expansion project / new project
 
      7)   Duty structure (EPCG / EOU / Project Import / IPP) Design, Delivery, erection and responsible commissioning and Supervisors to be dispatched by supplier, Labor force given for free by purchaser, all construction, concrete works and hall done by purchaser.
 
      8)   Project Implementation Schedule
            (Power Out - month / year) 10 MW after 8 month + 20 MW after 11 month + 16 MW after 13 month.
 
      9)   Mode of Financing the Project cash/TT for 30% down payment + L/C at sight, all against down payment and performance guarantees by supplier.
 
      10)  Type of Offer Required (Feasibility Study / Indicative / Budget / Firm)
 
      11)  Cost of existing Power
     
            (a) From Grid including Max.Demand Charges
 
            (b) Generated from other source (DG / TG etc.)
 
 
Additional Information
1.       what is the current project stage? Please specify the expected schedule.
Contract will be signed within 10 days from now with the one offering the best technical financial and quality and services offered
2.       is the fund for the project ready? If yes, where from?
Cash on bank
3.       what is the process for awarding EPC contractor? Negotiation or public tendering?
4.       why need Chinese equipments and EPC services?
5.       what is your role for this project? Developer/owner/sponsor/investor/EPC contractor/agent/consultant?
6.       what type of set you need? Brand new or used?
 
For more information on China HFO or Heavy Fuel Oil Diesel Generator Power Plant, please click.