BBS  Email&MSN: [email protected]
  
Homepage   |   Power Generation   |   Project Financing    |   Equipments   |   Transmission   |   News   |   Contact    |   services   |   download   |   sitemaps   |   Business Opportunity   |   BBS-Blog   |   Purchasing-agent   |   Exchange Link  

Mail List

E-mail:

Equipments
    Gas turbine & spare parts   
      GE 9FA 255mw Gas Turbine Generator   
      GE Licensed MS9001E Series Gas Turbine plant   
      42MW GE Gas Turbine Generator   
      PG6581B Gas Turbine Series Generator Plants   
      PG6581B Gas Turbine Set Supply Scope   
      Gas Turbine Spare Parts   
      Gas Turbine Generator Site Inspection   
      2MW Gas Turbine Generator   
      7mw-Siemens-SGT200-Gas-Turbine-Cogeneration-unit   
      10MW Gas Turbine Generator   
      Used Gas Turbine Generator Plant   
      Technical-Specification-PG6581B-Gas-Turbine   
      Supply-Scope-of-PG6581B-Gas-Turbine   
      Budgetary Cost for 108MW Gas Turbine Plant   
      Siemens Gas Turbine Generator   
    Steam Turbine   
      Extraction Condensing Turbine   
      Condensing Steam Turbine   
      Recovery Turbine   
      Extraction Turbine   
      Required Data for Quotation   
      Alstom-Licensed-330MW-Steam-Turbine   
      Quotation-50MW-condensing-steam-turbine   
      Quotation-30MW-Condesing-Steam-Turbine   
    Boiler   
    Power Plant Generator   
      Air Cooled Power Generator   
    Diesel generator   
      8x8735kw MAN 18V32/40 HFO Diesel power Proposal   
      8x 4.1mw MAN 9L32/40 hfo power plant proposal   
      6 units 5.5mw MAN 12V32/40 hfo diesel plant   
      3x3.5mw MAN 8L 32/40 hfo diesel generator plant   
      1MW diesel generator    
      1.5MW Diesel Generator Set   
      2M Diesel Generator Plant   
      Sample Diesel Power Plant Proposal 9x2mw   
      Diesel power Plant List   
      Used Diesel Generator   
      Diesel Generator Pictures   
      Bio diesel generator power plant MW   
      Sample Pack List for 10x2MW HFO diesel power Plant   
      10kw-4000kw-Cummins-MTU-diesel-generator-set   
    Hydro Turbine   
    Engineering Machinery   
      Truck Mounted Crane Crawler   
      Trailer Concrete Pump   
      China Bulldozer   
      China Crane   
      Benz Truck and Lorry from China   
    Cable&Wire   
    Electric Motor   
    Transformer in MVA   
      Germany Certificates   
      Required Data for Quotation   
      Transformer Reference   
      Sample Inquiry   
    Wind Turbine Generator   

Diesel Generator Proposal

Power Plant Proposal

 

Home > Equipments > Steam Turbine - Commercial terms for steam turbine


 

Commercial terms for steam turbine

COMMERCIAL TERMS & CONDITIONS
  1. Price:  CIF to employer’s site
  1. Origin : China
  1. Time of Delivery : The delivery time of the steam turbine shall be 10, 12 and 14 months FOB China by three shipment after the contract become effective.
  1. Payment Terms;  �?/B>
                                                               i.      10% of the total contract price shall be paid as down payment by customer by means of telegraphic transfer, within 15 days after signing the contract against 10% Back Guarantee.
                                                             ii.      30% of the total contract price shall be paid by the customer by means of telegraphic transfer, within 15 days after receiving the relative drawings.
                                                            iii.      The payment of the rest 60% of total contract price shall be made by an acceptable irrevocable confirmed and unconditional Letter of Credit at sight opened by an acceptable, Customer’s Bank and in favor of the Seller within 200 days after signed the contract.
  1. Performance Bank Guarantee �?Within 30days before shipment, the Seller shall issue a Performance Bank Guarantee through Seller’s Bank in favor of the Customer. The guaranteed amount shall be 5% of the total contract price.
  1. Custom duty & clearing charge: To your account.
  1. Port to site transportation charge �?To your account.
  1. Warranty: Seller warranty for the normal operation of turbine & generator will be in 12 months from trial operation or 18 month from shipment whichever is earlier.  Seller will be responsible for the repair and parts replacement on his cost.
  1. Erection & Commissioning: Seller will be sending five technical specialists to the working site for supervision of erection and commissioning of the unit and training for customer’s personnel. Moreover Seller will send two Chinese personnel deployment for three month post commissioning period during operation.
  1. Total Completion Period; 20 months from the date of receipt of commercially cleared PO and the down payment.

 

COMMERCIAL SCOPE

 

 

Sl. no

SCOPE

REMARKS

USD

 

 1.

 

 

Two nos of AFBC boiler with 135 TPH steam at 89 Ata

  

  12.0

Million

USD

 

 

 2.

 

 Two nos of steam Turbine Generator (STG)  with Air cooled condenses

8.5 million

USD

 

 3.

 

Complete steam & water cycle equipment    

 

 

 4.

 

  Mechanical Auxiliary system, cooling water system, Fire fighting  system 

 

 

 5.

 

 

One (1) common flue RCC chimney

             

 

 

 6.

 

Coal & Ash Handling System 

 

 

 7.

 

 

 

 Electrical Auxiliary system including

Auxiliary Transformers, rating of

transformer, HT & LT switch gear,

UPS, Battery & charger, Illumination

& Cable

 

 

 8.

 

Complete civil work & engineering

Design

 

 

 9.

 

Statutory approval for IBR ,

Inspector of factories, Electrical

inspectorate etc.

 

 

 10

 

Electrical item & costing with EPC     

 

 

11.

Miscellaneous  

 

 

 

TOTAL

 

 

 