Main technical parameter of unit for project of extension hydroelectric power station of Argentina(4×7.1MW)
1. installation capacity |
28.4 MW |
2. single set capacity |
4×7.1 MW |
3. Turbine |
H |
16 m |
Type |
GZ605-WP-275 |
Diameter of Runner |
2.75 m |
Rated Output |
7.357 MW |
Rated Discharge |
50.0 m3/s |
Rated Speed |
230.8 r/min |
Runaway Speed |
715 r/min |
Rated Efficiency |
93.8 % |
Max. Efficiency |
95.1 % |
Suction Head |
-3.3 m |
4. Generator |
Generator Type |
SFWG7100-26/3260 |
RatedCapacity |
7.89/7.1 MVA/MW |
Rated Voltage |
6.3 kV |
Rated Current |
417.5 A |
Rated Power Factor |
0.9 cosÆ |
Rated Speed |
230.8 r/min |
Insulation Class |
F |
Flywheel Effect |
390 kN.m2 |
Max. Lift Weight |
18 t |
5. Governor Type |
WST-80-4.0 |
6. Oil Pressure Unit Type |
HYZ-2.5-4.0 |
7.Excitation Mode |
Static Silicon-controlled
|