Main technical parameter of unit for project of extension hydroelectric power station of Argentina(4×7.1MW)
|
1. installation capacity |
28.4 MW |
|
2. single set capacity |
4×7.1 MW |
|
3. Turbine |
|
H |
16 m |
|
Type |
GZ605-WP-275 |
|
Diameter of Runner |
2.75 m |
|
Rated Output |
7.357 MW |
|
Rated Discharge |
50.0 m3/s |
|
Rated Speed |
230.8 r/min |
|
Runaway Speed |
715 r/min |
|
Rated Efficiency |
93.8 % |
|
Max. Efficiency |
95.1 % |
|
Suction Head |
-3.3 m |
|
4. Generator |
|
Generator Type |
SFWG7100-26/3260 |
|
RatedCapacity |
7.89/7.1 MVA/MW |
|
Rated Voltage |
6.3 kV |
|
Rated Current |
417.5 A |
|
Rated Power Factor |
0.9 cosÆ |
|
Rated Speed |
230.8 r/min |
|
Insulation Class |
F |
|
Flywheel Effect |
390 kN.m2 |
|
Max. Lift Weight |
18 t |
|
5. Governor Type |
WST-80-4.0 |
|
6. Oil Pressure Unit Type |
HYZ-2.5-4.0 |
|
7.Excitation Mode |
Static Silicon-controlled
|
For more about Hydro power plant, please click. |