BBS  Email&MSN: [email protected]
  
Homepage   |   Power Generation   |   Project Financing    |   Equipments   |   Transmission   |   News   |   Contact    |   services   |   download   |   sitemaps   |   Business Opportunity   |   BBS-Blog   |   Purchasing-agent   |   Exchange Link  

Mail List

E-mail:

Power Generation
    Big Power Plant Projects   
    GE Gas Turbine Power Plant Project   
      3x42mw gas turbine plant proposal   
    200mw Coal Fired Plant   
    600mw ultra super critical power plant   
    1500mw GE gas turbine plant   
    3x750mw Gas Turbine Combined Cycle Power Plant   
    360000 M3/D Sea Water Desalination   
    geothermal power plant   
      Work Scope   
      Design Data   
      Steam Turbine   
      Cooling System   
      Water System   
      Ventilation   
      Instrumentation Auto.   
      Electrification   
    Diesel power Plant   
    waste heat recovery power plant   
      4.5MW Waste heat recovery 2500t/d Cement Line   
      7.5MW Waste heat recovery 2x2500t/d Cement Line   
      9MW Waste heat recovery 5000t/d Cement Line   
      18MW Waste heat recovery 2x5000t/d Cement Line   
      Technical Proposal of 9MW Recovery Plant   
      Power Plant Connection and Main Equipments   
      Main Equipment Recovery Plant   
      Power Plant Construction Schedule   
      China Reference List waste heat Plants   
      Preliminary Proposal for Cement Plant   
    Thermal Power proposal   
    Questionnaire for Gas/HFO/Liquid Fuel Power Plant   
    Check-List-for-quotation-on-power-plant   
    Power project reference   
      Thermal plant List   
      Foreign Small plant   
      Reference of Sinomach   
      Diesel generator plant list    
      waste heat recovery power plant list   
      Gas Turbine Power plant Reference   
    Indicative quotation of 2x50MW coal fired plant   
    Estimated Quotation for Plant   
    Biomass-Gasification-Power-Generation-System   
    Gas Engine Generator power plant   
    Solar-Panel-Power-Plant-Quotation   
    Power Plant Auxiliary   

Diesel Generator Proposal

Power Plant Proposal

 

Home > Power Generation > Gas Engine Generator power plant - Container Gas Engine Generator Power Plant Part 7


 

Container Gas Engine Generator Power Plant Part 7

4  电站安全方面
Power plant safety
4.1 接地
站内设联合接地网,发电机与低压系统接地采用TN-C-S系统,接地装置采用角钢L50×5×2500作为垂直接地体,采用扁钢-40×40作为水平接地体,为保证站内微机及自动化系统的可靠运行,接地电阻不大于4Ω�?/DIV>
Grounding
Joint grounding net shall be set up inside power plant. TN-C-S system is applied for Grounding system in the generator set and low voltage system. Grounding device is made by angle iron L50×5×2500 as vertical grounding unit and flat iron -40×40 as horizontal grounding unit. Grounding resistance shall be less 4Ωin order to make reliable operation of computer and automatic system in power plant.
4.2 消防
 Fire protection
4.2.1 消防对象
主要消防对象为燃气发电机组�燃气管线泄漏、低压控制房等�
Object of Fire protection
The fire protection is focused on these objects such as gas generator set, leakage of gas pipeline, low voltage control room, etc.
4.2.2 消防方式
Fire protection method
发电机组静音房内消防以移动式灭火器为主,如有条件可引一��消防水管线在附近设置消火栓进行安全保护�
Locomotive fire extinguisher is the main fire protection equipment inside soundproof engine room . It is recommended to install a water pipe line for fire fighting and set up a hydrant nearby to ensure safety.
4.2.3 消防内容
Item of fire protection
   a.燃气发电机组周围设置推车式磷酸铵盐灭火器和手提式磷酸铵盐灭火器;
Go-cart and portable phosphatic fire extinguisher should be mounted around gas generator set
   b.低压控制房设置推车式CO2灭火器和手提式CO2灭火器�
Go-cart and portable CO2 fire extinguisher should be mounted inside low voltage control room.
4.3 燃气报警及��?/DIV>
Gas alarming and ventilation
发电机组的静音机房内安装有轴流风机,对机房内的空气进行强制�风�同时静音机房内设置燃气泄漏传感器,当燃气泄漏达到报警值时,低压控制房内的燃气报警控制器发出报警信号,提醒操作人员进行燃气泄漏查找并排除泄漏点。当燃气泄漏达到危险值时,燃气报警控制器发出报警信号的同时输出一开��信号给监控屏,监控屏控制电磁阀��断气源停机�
Axial flow blower shall be installed inside soundproof engine room to make compulsive air ventilation. Gas leaking sensor shall be equipped inside soundproof engine house, gas alarming controller inside low voltage control room shall send out an alarming signal when gas leakage is at the alarming value. It shall remind operators to check and eliminate gas leakage. Gas alarming controller makes a signal and output an on/off signal to monitoring panel when gas leaks up to the dangerous value. The monitoring panel control the electromagnetic valve to cut off gas supply, and then generator set stops.
4.4 危险防护
Protection to Danger
a、机组所有旋转部件装有防护罩,避免意外人身伤害;
All rotary parts in generator set shall equipped with shield so as to avoid injure to people.
b、高温部位设有隔热保温措施;
 Measures for heat insulation & preservation should be taken for the high temperature parts.
c、所有电气部分均可靠接地,并有明显的警示标致。电气设备布置满足节电设备的安全防护距离要求,设有必要的隔离措施和防止误操作的措施�
All electrical devices shall be grounded reliably with obvious caution sign. Electrical equipments shall be arranged according to requirement of safety distance of energy saving equipments. Necessary preventive measures for insulation and wrong operation shall be taken inside power plant.
4.5 环境保护
Environmental protection
4.5.1 排放
Emission
主要污染源来自燃气发电机组烟道排气�
The main pollution is from the exhaust gas of the gas generator set.
由于使用的燃料本身为洁净的天然气,所以几乎没有烟尘的排放�?/DIV>
Few dust is discharged from the generator set due to the clean natural gas fuel.
4.5.2 噪声防治
Noise prevention
对噪声源较强的设备加装有消声器,同时整套机组配套静音房,这样从声源上控制噪声大小,最��限度的降低噪音�
Silencer is mounted on the parts with heavy noise and the noise-prevention engine room is equipped for the generator set so to control and reduce the noise effectively.
5.我们的供货范�?/DIV>
5.1 设备情况
我们的供货范围包括天然气发电机组电站的设计�制�、供货�包装及运输�现场的安装调试指导�操作人员的培训�
The scope of product supply by SD includes the following items: design, manufacture, packing, transportation; guidance for on-site installation and training to operators or customers .
每个电站包括以下设备�?/DIV>
Every power plant includes the following equipments:
1�?台集装箱式天然气发电机组(底盘�发动机�发电机�静音机房�?/DIV>
   2 sets of container-type natural gas generator sets  (including frame, engine, alternator, soundproof engine room )
2�?台硅整流启动�?/DIV>
One Silicon rectifier starting cabinet  
4)每台机组一套机组监控系统屏(采集与继电控制屏�监控屏�断路器屏�?/DIV>
One monitoring panel for each generator set ( Collecting and relay control panel, monitoring panel, breaker panel )
5)一台进线柜
   One Wire inlet box
6) 低压控制�?/DIV>
Low voltage control room
7)每台机组一套烟气换热器
One Heat exchanger (gas-gas) for each generator set
8)随机技术资�?/DIV>
    Special technical documentation
9)随机备�?/DIV>
   Special spare parts
10)随机附�?/DIV>
Special components
11)控制电缆(机组房至低压控制房的电缆,甲方在机组发运�?5天提供控制线长度�?/DIV>
Control cable (cable from engine room to control room. Party A should inform Party B the cable length at least 15 days before delivery. )
注意:用户应提供电站的整套设备的平面布局情况,以便我们为您参考一些设备的布局是否合理�?/B>
Attention: Customer should provide us the layout drawing of all equipments of the power plant, so that we can make sure if the arrangement of these equipments is reasonable.
5.2  根据贵用户的一��说明,我们提供的方案图有�?/DIV>
According to some explanation provided by customer, we provide the following plan drawing to you.
1�?90系列热电联供机组的外形及安装尺寸见附图一�?/DIV>
Overall dimension & installation drawing of Series 190 natural gas generator set
 (please see Fig 1)
   2�?190系列天然气发电机组基础��见附图二
    Foundation Diagram of Series 190 natural gas generator set
 (please see Fig 2)
3)低压控制房外型及安装尺寸图见图三�
Overall dimension & installation drawing of Low Voltage Control panel
(please see fig 3 )
4)电气方�?见图四�
Electronic Plan 1  (please see Fig 4)
11)电气方�?见图五�
Electronic Plan 2  (please see Fig 4)
5.3 产品质保�?/DIV>
Guarantee period of products:
质保期:按使用要求操作,质保期自出厂之日�?2个月或累计运�?500小时(以先到为准)�
Guarantee period: The customer should operate the generator sets according to the requirements of the operation manual. The guarantee period is within 12 months from delivery date or total operation hours up to 1500hs, whichever comes first takes effect.
5.参考报�?/DIV>
  Price for reference
(to be provide later)
 