    Big Power Plant Projects   
    GE Gas Turbine Power Plant Project   
      3x42mw gas turbine plant proposal   
    200mw Coal Fired Plant   
    600mw ultra super critical power plant   
    1500mw GE gas turbine plant   
    3x750mw Gas Turbine Combined Cycle Power Plant   
    360000 M3/D Sea Water Desalination   
    geothermal power plant   
      Work Scope   
      Design Data   
      Steam Turbine   
      Cooling System   
      Water System   
      Ventilation   
      Instrumentation Auto.   
      Electrification   
    Diesel power Plant   
    waste heat recovery power plant   
      4.5MW Waste heat recovery 2500t/d Cement Line   
      7.5MW Waste heat recovery 2x2500t/d Cement Line   
      9MW Waste heat recovery 5000t/d Cement Line   
      18MW Waste heat recovery 2x5000t/d Cement Line   
      Technical Proposal of 9MW Recovery Plant   
      Power Plant Connection and Main Equipments   
      Main Equipment Recovery Plant   
      Power Plant Construction Schedule   
      China Reference List waste heat Plants   
      Preliminary Proposal for Cement Plant   
    Thermal Power proposal   
    Questionnaire for Gas/HFO/Liquid Fuel Power Plant   
    Check-List-for-quotation-on-power-plant   
    Power project reference   
      Thermal plant List   
      Foreign Small plant   
      Reference of Sinomach   
      Diesel generator plant list    
      waste heat recovery power plant list   
      Gas Turbine Power plant Reference   
    Indicative quotation of 2x50MW coal fired plant   
    Estimated Quotation for Plant   
    Biomass-Gasification-Power-Generation-System   
    Gas Engine Generator power plant   
    Solar-Panel-Power-Plant-Quotation   
    Power Plant Auxiliary   

Diesel Generator Proposal

Power Plant Proposal

 

Home > Power Generation > Gas Engine Generator power plant - Container Gas Engine Generator Power Plant Part 3


 

Container Gas Engine Generator Power Plant Part 3

Electric Performance data: When Generator set should operate, please keep its frequency and voltage within the Limit values described in table 3 .  
表三  电压和频率的运行极限�?/DIV>
Table 3   Limit Value of Voltage and Frequency
�?/B> �?/B>
Item
�?/B>  �?/B>
Description
�?/B>  �?/B>
Symbol
运行极限�?/B>
Limit Value
1
频率降,%
Frequency Drop
δfst
�?
2
负载减少时(对额定频率的)瞬态频率偏差,%
Transient freq. deviation
δf
�?12
3
负载增加后的频率恢复时间�?0%额定负荷),s
Freq. recovery time as load increases (AT 30% rated load.
tf,in
�?
4
稳�频率带,%
Transient freq. range
βf
�?.5
5
稳�电压偏差�?
Transient voltage deviation
δUst
≤�?.5
6
负载减少时的瞬�电压偏差�?
Transient voltage deviation while load decreases.
δU
�?25
7
负载增加后的电压恢复时间,s
Voltage recovery time while load increases
tU,in
�?
8
相对的电压整定范围,%
Relative voltage setting scope
δUs
≥�?
机组在下列条件下应能输出额定功率�?/DIV>
The generator set shall output at rated power under the following conditions:
    海拔不超�?00m�?/DIV>
Sea level is below 300m;
环境温度�?5�?/DIV>
Environment temperature: 25�?/DIV>
空气相对湿度�?0%�?/DIV>
Relative air humidity: 30%
燃气低热值不低于35MJ/Nm3�?/DIV>
Low heat value of gas : �?5MJ/Nm3
燃气压力不低�?50kPa�?/DIV>
Gas pressure is below 150kPa�?/DIV>
机组在下列条件下应能可靠地工作:
The generator set can operates reliably under the following conditions:
海拔不超�?000m�?前面有一�?00米数据?)
Sea level below 2000m
环境温度�?40�?0℃;
Environmental temperature: -40�?0�?/DIV>
燃气压力不低�?00kPa�?/DIV>
Gas pressure above 100kPa
空气相对湿度不大�?0%�?5℃时);
Relative air humidity:  �?0%(at35�?�?/DIV>
周围空气中不应有酸碱腐蚀性气体�
    No acid or alkaline corrosive gases in the air surrounding the unit.
2        热电联供机组的组�?/DIV>
Basis Structure of Combined Heat and Power (CHP) Generator Set
整个热电联供电站由天然气发电机组、静音房、余热利用部分�低压控制房等组成�?/DIV>
天然气发电机组包括:天然气发动机、发电机、监控部分�电力部分等�
天然气发动机包括:燃气进气部分�冷却部分、润滑部分�启动部分、排气部分等�?/DIV>
The complete CHP power plant is consisted of natural gas generator set, soundproof room, waste heat utilization system and low voltage controlling room.
The natural gas generator set includes natural gas engine, alternator, monitoring and controlling system and electric device.
The natural gas engine includes: gas intake system, cooling system, lubrication system, starting system, and exhaust system.
2.1      燃气进气部分
Gas intake system
燃气与空气预混合,达到所需��燃比后进入气缸,由点火部件点燃�一��包括减压阀�停机电磁阀�混合器等。其中混合器、点火线圈�高压线�磁电机均为世界知名品牌产品�
After gas mixtures with air till it is at the required A/F ratio, it shall flow into the cylinder and then is ignited by ignition system. The gas intake system is consisted of pressure regulator, magnetic valve for stopping engine, carburetor and others. Of that, carburetor, igniting coil, high voltage wire and magneto for the generator set are of the renowned brands in the world.
3.1.1 气源要求
    Requirements for Gas Resource
1)燃气不含游离水或其它游离杂质,如果有,气体应经过干燥脱水和过滤�?/DIV>
 There is no free- water or other free-impurity in gas fuel. If not, it should be dried, dehydrated and filtered before applied.
2)若温度过高,还应经过冷却器,并保证燃气中无液�成分�?/DIV>
 If temperature is extremely high, gas should be cooled by cooler to be sure that there is any liquid content.
3)粉尘颗粒小�?微米,粉尘�含量不大�?0毫克/立方米;
 Impurity size is smaller than 5 micron (μm), and impurity content below 30mg/m3 .
4)硫化氢含量小于30毫克/立方米;
Hydrogen sulfide content in the gas is below 30 mg/m3
5)发电机组正常运行时,需要机组调压阀前气源压力不低于100kPa�?/DIV>
While the generator set operates correctly, it is necessary to keep the gas resource pressure before the pressure regulator above 100kPa
3.1.2 燃气进气配置
   Configuration of Gas intake system
从气源来的燃气�管线在发电机组房外分为支管线,分别为2台机组供气,气源总管线管径不小于DN80,机组支管线为DN50�?/DIV>
The common gas pipe from the gas resource shall be branched outside the engine room of generator set and shall deliver gas to two generator sets. The diameter of the common gas pipe should be not below DN80 and the gas manifold not below DN50.
3.1.3 用户气源要求
     Requirements for customer on gas resource
用户在订购前请提供天然气成分表�温度、压力�流量等情况,以便我们核查机组的配置是否合适,以保证机组的长期连续稳定运行�?/DIV>
Before ordering, customers should offer us the natural gas composition, temperature, pressure, flow and others so that we can check the generator set configuration for correctness to ensure it operating continuously and reliably.
2.2      冷却部分
Cooling System
冷却系统主要由高温水泵�低温水泵、多风扇散热器�机油冷却器�中冷器及冷却管系等组成,采用强制水冷、高低温独立的循环冷却方式,对气缸套、气缸盖、增压后空气、机油等进行冷却,满足机组运行需要�
The cooing system is consisted of high-temp. and low-temp. water pump, multi-radiators, oil cooler, intercooler and cooling water pipes. The engine covering cylinder line, cylinder head, turbocharged air and lub-oil are cooled by the cooling method with forced cooling water in independent high and low –temp. recycling cooling system, which makes sure that the generator set is in operation correctly.  
燃气发电机组冷却系统循环水可采用软化水或防冻液�
注意:如果用户所在地区最低气温≤5℃时,必须使用防冻液,否则会造成机组重大损坏�?Soften water or antifreeze is adapted for recycling cooling water in the engine.
Note: If the generator set shall operate in the area where the lowest temperature is �?�? anti-freezer should be used to prevent the generator set from a serious damage.
发动机循环冷却水的要求如下:
Recycling cooling water for the engine should conform to the requirements as follows.
冷却水应选用略呈碘�的清洁软化水,不得含有腐蚀�的化合物,如氯化物�硫酸盐和酸等,不得直接用海水、井水�泉水及工业废水�含盐、含碱的水作为冷却水�?/DIV>
Clean soften water should be chosen for the engine without any corrosive and component such as chloride, sulfate or acid and should be slightly alkaline. Never fill water directly from sea, well, fountain, industrial waste or salt and alkaline water into the engine.
冷却水主要技术要求如下:
硬度�?nbsp; Water hardness value    0.7�?.3    ME/L
氯离子含量Chlorine content    �?50       mg/L
PH�?PH value              6�?.5�?/DIV>
 冷却水质量的好坏,不仅直接影响发动机的冷却效果,而且对使用寿命也有较大影响�不合格的冷却水容易产生水垢,甚至堵塞流道,对零部件产生严重腐蚀��用,破坏密封元件(如水封)的密封性等。因此,在使用中应严格控制冷却水的质量�为减少或避免冷却系统中机件的腐蚀和水垢覆积,冷却水中应加入�量的防锈乳化液�
Cooling water quality may have a direct effect on cooling and service life of the generator set. The unqualified cooling water shall create water scale easily, which can block water passage and corrode the parts seriously and damage the sealing parts (for example: water sealer). Quality of cooing water must be controlled strictly. A suitable amount of antiseptic oil should be filled into cooling water to reduce corrosion or scale settlement.
常用防冻液有甘油—水和乙二醇—水两类,其配制方法见下表四�?/DIV>
Generally, there are two kinds of anti-freezers, one is glycerol-water and the other one is glycol –water, which are made according to table 4.
表四  常用防冻液配置方�?nbsp;  
 Make-up OF Anti-freezer
冰点�?/DIV>
Freezing Point
�?nbsp; �?nbsp; �?nbsp; �?/DIV>
Glycerol-water
�?nbsp; �?nbsp; �?nbsp; �?nbsp; �?/DIV>
Glycol -Water
甘油重量%
Glycerol quality
比重
Density
乙二醇重�? Glycerol quality
比重
Density
-5
21
1.0495
—�
—�
-10
32
1.0780
284
1.0430
-15
43
1.1074
328
1.0426
-20
51
1.1290
385
1.0506
-25
58
1.1483
453
1.0586
-30
64
1.1647
478
1.0671
-35
69
1.1785
509
1.0671
-40
73
1.1894
547
1.0713
-45
76.5
1.1980
570
1.0746
注意:使用防冻液时,选用冰点要比使用地区最��温度�?℃,先按冰点较高的组成比例配制,逐步添加乙二醇或甘油�?/DIV>
Note:  Freezing point of anti-freezer is at least 5�?lower than the extreme lowest temperature on site. Initial make –up of anti-freezer shall be made on the highest freezing point and then add glycerol or glycol gradually.
多风扇水箱上装有膨胀水箱,用于补给水和多风扇水箱加水用�多风扇水箱有多个风扇,并不是同时打开,�是根据机组冷却水温的变化由监控系统自动控制其打开或关闭,从�有效控制机组冷却水温度在要求范围内�
On the multi-radiators is equipped with an expanding water tank to supplement water or fill water for the radiators. The multi-radiators are made up of several fans, which shall open and close automatically controlled by a monitoring system according to the temperature of gen-set cooling water, but not open at the same time, so temperature of gen-set cooling water is controlled within the required range.
3.3 润滑部分
润滑部分主要由机油泵、机油滤清器、离心滤清器、各种调节阀及润滑管系等组成。主油道压力是机组运行中监测的一重要指标,其压力过低会�成润滑效果不好,一��主油道压力控制在0.4-0.8MPa范围�?低于0.3MPa监控系统就会报警�?/DIV>
Lubricating system is consisted of oil pump, oil filter, centrifugal filter, different regulators and lubricating pipes. Oil pressure in the main oil gallery is a critical index which is measured while the engine operating. For low oil pressure shall have a bad influence on lubrication, oil pressure in main oil gallery shall be controlled at the range of 0.4 to 0.8MPa. If it is below 0.3MPa, the monitoring system shall alarm at once.
关于机油消�率指标请见表一�
Please refer the table 1 for oil consumption.
道依茨燃气机组用润滑油要求:
API-Class CD或CE或CF-4;
CCMC-Class D4或D5或GB1112中�增压柴油机用机油CD级�
API-Class CD or CE或CF-4
CCMC-Class D4  or D5 or GB11123中�增压柴油机用机油CD级�
Requirement for Lub –oil by Deutz generator set
API-Class CD or CE or CF-4;
CCMC-Class D4 or D5 or CD grade oil for turbocharged diesel engine of GB1112
CCMC-Class D4  or D5 or CD grade oil for turbocharged diesel engine of GB11123
190系列燃气机组用润滑油要求�?/DIV>
应符合关于机油的指标要求,规定可使用15W40CD�?5W40CC发动机机油,或以更高级别的柴油机油代替�
若用户地区无规定牌号的机油,可按表五所��的质量指标�择润滑油�?/DIV>
Requirement for Lube –oil by SD Brand generator set
Lube–oil index should conform with requirements of SD on engine lube- oil. It is recommended that 15W40CD or15W40CC shall be applied in the engine. It can be replaced with the Lube-oil with higher grade of oil for diesel engine.
If there is no required oil available, it is recommended to choose the oil according to the quality index described in Table 5
 