    Big Power Plant Projects   
    GE Gas Turbine Power Plant Project   
      3x42mw gas turbine plant proposal   
    200mw Coal Fired Plant   
    600mw ultra super critical power plant   
    1500mw GE gas turbine plant   
    3x750mw Gas Turbine Combined Cycle Power Plant   
    360000 M3/D Sea Water Desalination   
    geothermal power plant   
      Work Scope   
      Design Data   
      Steam Turbine   
      Cooling System   
      Water System   
      Ventilation   
      Instrumentation Auto.   
      Electrification   
    Diesel power Plant   
    waste heat recovery power plant   
      4.5MW Waste heat recovery 2500t/d Cement Line   
      7.5MW Waste heat recovery 2x2500t/d Cement Line   
      9MW Waste heat recovery 5000t/d Cement Line   
      18MW Waste heat recovery 2x5000t/d Cement Line   
      Technical Proposal of 9MW Recovery Plant   
      Power Plant Connection and Main Equipments   
      Main Equipment Recovery Plant   
      Power Plant Construction Schedule   
      China Reference List waste heat Plants   
      Preliminary Proposal for Cement Plant   
    Thermal Power proposal   
    Questionnaire for Gas/HFO/Liquid Fuel Power Plant   
    Check-List-for-quotation-on-power-plant   
    Power project reference   
      Thermal plant List   
      Foreign Small plant   
      Reference of Sinomach   
      Diesel generator plant list    
      waste heat recovery power plant list   
      Gas Turbine Power plant Reference   
    Indicative quotation of 2x50MW coal fired plant   
    Estimated Quotation for Plant   
    Biomass-Gasification-Power-Generation-System   
    Gas Engine Generator power plant   
    Solar-Panel-Power-Plant-Quotation   
    Power Plant Auxiliary   

Diesel Generator Proposal

Power Plant Proposal

 

Home > Power Generation > Gas Engine Generator power plant - Appendix A_10 x J616 scope listing_a


 

Appendix A_10 x J616 scope listing_a

 

Appendix " A "
Scope listing Ge Jenbacher Power Generating Facility
The grouping consists of 10 x Ge Jenbacher J616 Series generating sets and associated equipment
including two prefabricated buildings that have been in a heated storage facility since 2001 as a
result of a failed power project.


The generator sets and all associated equipment are well preserved and in very good condition.
These units and associated equipment as listed below were originally sold for approx $13,000,000 .
Current pricing is very competitive.


EQUIPMENT DESCRIPTION:


10x Jenbacher Sixteen Cylinder Vee J 616 GS N.L. 1500 rpm natural gas engines with a continuous
full load shaft output of 2000 kW, based on a LHV gas of 8,8 KW per Nm³ . The generator set is
designed to serve 50 as well as 60Hz. Between each engine and generator there is an Eichoff ANO-
090 1:1.2 gear speed increaser driving for 60Hz application. If only 50Hz is required the gear will be
removed to optimize the electrical efficiency. The electrical efficiency at 50Hz and full load will reach
41,1%
10x Stamford generators designed for 50 and 60 Hz, type rated for 3.375 kVA 400/480Volts,
directly connected to a step-up transformer. Generator voltage output can be adapted to customers
requirements.
Engine and generator base frames are included together with:


  Engine Jacket water system module
  Electric Jacket Water Preheating
  Automatic Lube oil replenishing system
  Pre lubrication and after cooling oil pump
  Main Fuel natural gas train.
  Pre chamber natural gas train.
  Piping interface flexible connections for water, gas, and lube oil.
  Ge Jenbacher - Dianne Engine Management system with monitoring and safety shut down
for auto or manual operation, Leanox misfiring detection, performance and trend tracking etc
  Ge Jenbacher - Hermes remote monitoring system enables distance control and monitoring
by telephone line and modem.
  Interface panel module
  Master control panel for 10 engines for auto start /stop of individual modules.
  2x Siemens motor control panels for operation of auxiliaries NEMA (each control 5 units)
  10x Thompson Technology Inc utility grade generator control panels for synchronizing
with the mains using plc technology and with re synchronizing automatic
built into module
  generator switchgear (Low voltage) NEMA
  Grid monitoring device
  10x Alstom step-up transformers included for 400-480 / 10.000-12.000 volt with tap
changing device for voltage adaption
  10 x GGEA Dual circuit air cooled radiators for High and Low temperature circuits �?BR>based on 40 degrees C ambient temp.
  10 x Silex critical grade Exhaust Silencers, with mounting bands, connectors and
insulation  10 x start batteries and charging rectifiers
  Engine commissioning spare parts and standard tools
 

These generating sets could easily be used as 50 Hz or 60Hz units as the Stamford generator is
switchable between 50/60Hz. The gas engine runs always at 1500rpm, for 60Hz application a
gearbox is mounted between generator and gas engine. This makes these units additionally useful
for overseas projects.


As the units are immediately available and new engine factory production generally has a minimum
of 6-month delivery capability, a client using these new - factory shipped condition - units would
have a considerable advantage for projects requiring an accelerated commissioning period.

 