BBS  Email&MSN: [email protected]
  
Homepage   |   Power Generation   |   Project Financing    |   Equipments   |   Transmission   |   News   |   Contact    |   services   |   download   |   sitemaps   |   Business Opportunity   |   BBS-Blog   |   Purchasing-agent   |   Exchange Link  

Mail List

E-mail:

Power Generation
    Big Power Plant Projects   
    GE Gas Turbine Power Plant Project   
      3x42mw gas turbine plant proposal   
    200mw Coal Fired Plant   
    600mw ultra super critical power plant   
    1500mw GE gas turbine plant   
    3x750mw Gas Turbine Combined Cycle Power Plant   
    360000 M3/D Sea Water Desalination   
    geothermal power plant   
      Work Scope   
      Design Data   
      Steam Turbine   
      Cooling System   
      Water System   
      Ventilation   
      Instrumentation Auto.   
      Electrification   
    Diesel power Plant   
    waste heat recovery power plant   
      4.5MW Waste heat recovery 2500t/d Cement Line   
      7.5MW Waste heat recovery 2x2500t/d Cement Line   
      9MW Waste heat recovery 5000t/d Cement Line   
      18MW Waste heat recovery 2x5000t/d Cement Line   
      Technical Proposal of 9MW Recovery Plant   
      Power Plant Connection and Main Equipments   
      Main Equipment Recovery Plant   
      Power Plant Construction Schedule   
      China Reference List waste heat Plants   
      Preliminary Proposal for Cement Plant   
    Thermal Power proposal   
    Questionnaire for Gas/HFO/Liquid Fuel Power Plant   
    Check-List-for-quotation-on-power-plant   
    Power project reference   
      Thermal plant List   
      Foreign Small plant   
      Reference of Sinomach   
      Diesel generator plant list    
      waste heat recovery power plant list   
      Gas Turbine Power plant Reference   
    Indicative quotation of 2x50MW coal fired plant   
    Estimated Quotation for Plant   
    Biomass-Gasification-Power-Generation-System   
    Gas Engine Generator power plant   
    Solar-Panel-Power-Plant-Quotation   
    Power Plant Auxiliary   

Diesel Generator Proposal

Power Plant Proposal

 

Home > Power Generation > Gas Engine Generator power plant - 1000GF-TK2 Natural Gas Generator Unit Quotation


 

1000GF-TK2 Natural Gas Generator Unit Quotation

 
 
1. 1000GF-TK2 Natural Gas Generator Unit Quotation
 
2.  Supply Scope
No.
Description
EXW
Unit Price
(USD)
Unit
1
 
Natural gas Gensets type(1000GF-TK2) including
Gas engine, Alternator, Common base, Control Panel, Exhaust silencer, heat exchanger, synchronous model, Special parts, Special tools ,Charger, Battery, Wood packing
(if need fan and radiator instead of cooling tower, should add USD13,400  )
252,263.00
1
2
Cooling Tower (optional part)
7,480.00
1
3
Tailor Made Trunk (optional part)
26,757.50
1
 
Total
 
 
 
 
286,500.50
 
    
3.      Packing: Export standard wooden Packing
 
4.      Terms of Payment:
Advance payment by T/T--30% of total contract value as advanced payment, other 70% payment before delivery.
 
5.      Insurance: -------to be offered by the buyer.
6、Delivery time
3 month after seller received irrevocable L/C at sight in favor of the seller or T/T.
 
7. Installation and commission:
Our company will send two technicians for installation and commission,all the fee including the air ticket, traffic ,living condition and insurance in abroad will be provided by the customer and also provide to the technicians 150 dollars each day.
 
8. Quality/Quantity Discrepancy and Claim:
In case the quality and /or quantity are found by the buyers to be not in conformity with the contract after arrival of the goods at the port of destination, the buyers may lodge claim with the sellers supported by survey report issued by China inspection organization agreed upon by both parties, with the exception, however, of those claims for which the insurance company are to be held responsible. Claim for quality discrepancy should be filed by the buyers within 30 days and claim for quantity within 15 days after arrival of the goods at the port of destination. The sellers shall, within 30 days after receipt of the notification of the claim, send reply to the buyers.
 
9. Force majeure :
In case of the Force majeure , the sellers should not be held responsible for late delivery of non-delivery of the goods but shall notify the buyers by cable. The sellers shall deliver to the buyers by registered mail, if so requested by the buyers, a certificate issued by the China Council for the Promotion of International Trade or and competent authorities.
 
10. Arbitration:
All dispute in connection with this Contract or the execution thereof shall be settled by negotiation between two partied. If no settlement can be reached, the case in dispute shall then be submitted for arbitration in the country of defendant in accordance with the arbitration regulations of the arbitration organization of the defendant country. The decision made by the arbitration organization shall be taken as final and binding upon both parties. The arbitration expenses shall be the losing party unless otherwise awarded by the arbitration organization.
                                                   
Attachment
1\ Main technical data of gas engine
Model of engine
 
AD12V190ZLT2
Rated power
1100kw
Rated speed
1500 r/min
Compression ratio
10:1
Gas pressure
7�?Kpa
Number and layout of cylinders:
12-cylinder, V-type, 60° included angle
Type:
Turbo-charged and after cooled, closed cycle electrical control
Fuel
Natural gas
Bore:
190 mm
Stoke:
215 mm
Heat efficiency
10000kJ/kWh
Oil consumption
£ 1.0 g/kWh
Lubricating method
Pressure and splash lubrication
Lowest speed
700 rpm
Exhaust temperature
£ 650 °C
Starting method
Electronic motor
Overall dimension L×B×H
2979×2312×2471mm
Net mass
9300kg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
2\Main technical data of alternator (SIMENSE)
Voltage
Frequency
Stabilized regulation
Instantaneous regulation
Recovery time
Fluctuation
Stabilized regulation
Instantaneous regulation
Recovery time
Fluctuation
±2.5%
+20% -15%
1.5 S
0.5%
0-5% adjustable
±10%
< 10S
1.0%
 
3\Control panel
Automatic load sharing and synchronous model (import from Czech�?/DIV>
 
4\ Import parts list of governor
Item
Company
Electronic control module
WOODWARD(USA)
Speed governor control module
WOODWARD(USA)
Speed control actuator
WOODWARD(USA)
Speed sensor pick up
WOODWARD(USA)
Explosion relief valves
HOERBIGER(Germany)
Gas mixer
WOODWARD(USA)
 
5\ Natural gas intake system
Import parts list
Item
Company
Gas filter
KROM(Germany)
Primary pressure regulator valve
KROM(Germany)
Intake valves
WOODWARD(USA)
 
6\ignition system
Item
Company
High voltage coil
ALTRONIC(USA)
Sparking plug
STITT(USA)
High-low voltage wire
ALTRONIC(USA)

For China gas engine generator sets or power plants, please click.

 




Copyright©2006-2010 Leda Greenpoweer Beijing
   Fax:0086-10-84568952  E-mail:
[email protected]