China National Electric Wire&Cable Imp./Exp. Corp  BBS  Email&MSN: [email protected]
  
Homepage   |   Equipments   |   Power Generation   |   Transmission   |   Project Financing    |   News   |   Contact    |   services   |   download   |   sitemaps   |   Business Opportunity   |   BBS-Blog   |   Purchasing-agent  

Mail List

E-mail:

Equipments
    Boiler   
    Diesel generator   
      1MW diesel generator    
      1.5MW Diesel Generator Set   
      2M Diesel Generator Plant   
      Sample Diesel Power Plant Proposal 9x2mw   
      Diesel power Plant List   
      Used Diesel Generator   
      Diesel Generator Pictures   
      Bio diesel generator power plant MW   
      Sample Pack List for 10x2MW HFO diesel power Plant   
      10kw-4000kw-Cummins-MTU-diesel-generator-set   
    Gas turbine   
      2MW Gas Turbine Generator   
      7mw-Siemens-SGT200-Gas-Turbine-Cogeneration-unit   
      10MW Gas Turbine Generator   
      42MW GE Gas Turbine Generator   
      Used Gas Turbine Generator Plant   
      PG6581B Gas Turbine Series Generator Plants   
      PG6581B Gas Turbine Set Supply Scope   
      Technical-Specification-PG6581B-Gas-Turbine   
      Supply-Scope-of-PG6581B-Gas-Turbine   
      GE Licensed MS9001E Series Gas Turbine plant   
      Budgetary Cost for 108MW Gas Turbine Plant   
    Hydro Turbine   
    Engineering Machinery   
      Truck Mounted Crane Crawler   
      Trailer Concrete Pump   
      China Bulldozer   
      China Crane   
      Benz Truck and Lorry from China   
    Transformer in MVA   
      Germany Certificates   
      Required Data for Quotation   
      Transformer Reference   
      Sample Inquiry   
    Steam Turbine   
      Extraction Condensing Turbine   
      Condensing Steam Turbine   
      Recovery Turbine   
      Extraction Turbine   
      Required Data for Quotation   
      Alstom-Licensed-330MW-Steam-Turbine   
      Quotation-50MW-condensing-steam-turbine   
      Quotation-30MW-Condesing-Steam-Turbine   
    Cable&Wire   
    Electric Motor   
    Power Plant Generator   
      Air Cooled Power Generator   
    Wind Turbine Generator   

Diesel Generator Proposal

Power Plant Proposal

 

Home > Equipments > Gas turbine - GE gas turbine generator frame 6 spare part: STAGE BUCKET COMPELTE WITH HADWARE KIT


 

GE gas turbine generator frame 6 spare part: STAGE BUCKET COMPELTE WITH HADWARE KIT

 

NO QTY  /TD> DESCRIPTION Required PART NO Offered P/N Unit Price FOB HK USD Total FOB HK in USD
1 1 SET 1st STAGE BUCKET COMPELTE WITH HADWARE KIT 314B7162G11 314B7162G022 473000 473000
2 1 SET 2nd STAGE BUCKET COMPELTE WITH HADWARE KIT E2877P1H1 314B7163G021 352000 352000
3 1 SET 3rd STAGE BUCKET COMPELTE WITH HADWARE KIT MFE5580P1HU5 314B7164G023 330000 330000
 /TD>  /TD>  /TD> This part for Frame: 6-B  /TD>  /TD> Total 1155000
 /TD>  /TD>  /TD>  /TD>  /TD>  /TD>  /TD>  /TD>
1. Quotation is based on FOB HK in USD
2. Delivery will be decided before placing order by checking GE online stock database
3. payment: 30% by T/T, balance be paid by T/T within 10 days after notice by email of fax stating parts arriving at HK and buyer can inspect in HK if required.

IN-738 Cutter Teeth Stage 3 Bucket
for Frames 6A and 6B

Part# 314B7164G023
Designed for frame 6A through 6B turbines, the IN-738 stage 3
bucket incorporates design enhancements that allow operation
at firing temperatures up to 2084°F. Constructed from IN-738
super alloy, rather than the previous U-500 material, the redesigned
bucket maintains its design life expectancy of 72,000 hours at
higher firing temperatures.
Features
IN-738 Material
IN-738 is one of a very small class of modern super alloys that
offers an outstanding combination of elevated temperature
strength and hot corrosion resistance. This super alloy was
the first cast bucket material used by GE in our heavy-duty gas
turbine.
Cutter Teeth
The new stage 3 bucket design includes “cutter teeth�?on the
bucket tip shroud rails. The design cuts a slot in the honeycomb
seal material on the stage 3 shroud block with no metal transfer
to the bucket. This allows new shroud blocks with honeycomb
seals to be installed.

   Previous Stage 3 Bucket    IN-738 Stage 3 Bucket  
 Material    U-500    IN-738  
 Cutter Teeth*    Not present    Present  
 Firing Temp    Up to 2020°F    Up to 2084°F  

 

Benefits
• Improved material provides better hot corrosion resistance
• Capable of operation at higher firing temperature—up to
2084°F
• Design life expectancy of three hot gas path inspections
(72,000 hours for gas only, dry, base loaded operation)
at higher firing temperatures
Applicability
This offering is intended for use with frame 6A and 6B
gas turbines.





Copyright©2006 China National Electric Wire & Cable Import & Export Corporation
Tel:0086-10-85805511   Fax:0086-10-84568952  E-mail:
[email protected]