China National Electric Wire&Cable Imp./Exp. Corp  BBS  Email&MSN: [email protected]
  
Homepage   |   Equipments   |   Power Generation   |   Transmission   |   Preferential Fund   |   News   |   Contact    |   services   |   download   |   sitemaps   |   Business Opportunity   |   BBS-Blog   |   Purchasing-agent  

Mail List

E-mail:

Equipments
    Boiler   
    Diesel generator   
      1MW diesel generator    
      1.5MW Diesel Generator Set   
      2M Diesel Generator Plant   
      Sample Diesel Power Plant Proposal 9x2mw   
      Diesel power Plant List   
      Used Diesel Generator   
      Diesel Generator Pictures   
      Bio diesel generator power plant MW   
      Sample Pack List for 10x2MW HFO diesel power Plant   
      10kw-4000kw-Cummins-MTU-diesel-generator-set   
    Gas turbine   
      2MW Gas Turbine Generator   
      7mw-Siemens-SGT200-Gas-Turbine-Cogeneration-unit   
      10MW Gas Turbine Generator   
      42MW GE Gas Turbine Generator   
      Used Gas Turbine Generator Plant   
      PG6581B Gas Turbine Series Generator Plants   
      PG6581B Gas Turbine Set Supply Scope   
      Technical-Specification-PG6581B-Gas-Turbine   
      Supply-Scope-of-PG6581B-Gas-Turbine   
      GE Licensed MS9001E Series Gas Turbine plant   
      Budgetary Cost for 108MW Gas Turbine Plant   
    Hydro Turbine   
    Engineering Machinery   
      Truck Mounted Crane Crawler   
      Trailer Concrete Pump   
      China Bulldozer   
      China Crane   
      Benz Truck and Lorry from China   
    Transformer in MVA   
      Germany Certificates   
      Required Data for Quotation   
      Transformer Reference   
      Sample Inquiry   
    Steam Turbine   
      Extraction Condensing Turbine   
      Condensing Steam Turbine   
      Recovery Turbine   
      Extraction Turbine   
      Required Data for Quotation   
      Alstom-Licensed-330MW-Steam-Turbine   
      Quotation-50MW-condensing-steam-turbine   
      Quotation-30MW-Condesing-Steam-Turbine   
    Cable&Wire   
    Electric Motor   
    Power Plant Generator   
      Air Cooled Power Generator   
    Wind Turbine Generator   

Diesel Generator Proposal

Power Plant Proposal

 

Home > Equipments > Gas turbine - used GE PG6541B PG6561B gas turbine set


 

used GE PG6541B PG6561B gas turbine set

The Introduction to Used GE 6B Gas Turbine Generator Unit
Introduction to Gas Turbine
Gas turbine has the following features: fast start and stop, Load faster and few pollution emissions etc. 1# gas turbine genset can not only burn single light oil or single gas as fuel, but also use mixed fuel of oil with gas. In the course of operation, it is easy to make change from one fuel mode to another fuel mode.
 
1# Gas Turbine
1.  technical specification of 1# gas turbine:
Manufacturer: China Nanjing Turbine and electrical machinery Co.
Model: PG6541B
     Under the condition of ISO(Air Temperature 15�? Atmospheric Pressure  1.013×105Pa), under basic load, technical performance indicators of the units are as follows:
5100T/M GT Rotational speed, Intake pressure loss 996Pa, Exhaust pressure loss 622Pa.
 When units use fuel to standard of GEI-41047, units parameters in single cycle operation are as follows:
     Operation Mode 
Basic Load
    Fuel
Light Oil
Heavy Oil
Output Power        kW
36475
35200
Heat Rate   KJ/KW.h
11786
12099
Heat Consumption    106KJ/h
429.8
425.8
Turbine Inlet Temperature        �?/DIV>
1104
1088
Exhaust Temperature        �?/DIV>
539
529
Air Flow  103Kg/h
491
491
Oil Consuming Rate   g/KW.h
276
289
* Calculate light oil low calorific value based on 42000KJ/Kg
 
2.  Generator technical specifications of 1# GT are as follows:
Manufacturer
Nanjing Turbine and Electric Machinery Co.
Model
QFR-36-2
Product Standard
QJ/3201  NQ003-89
Rated Power
36MW
Rated Voltage
10.5KV
Rated Current
2474A
Power Factor
0.8
Frequency
50HZ
Rotational Speed
3000 rpm
Excitation voltage 
160V
Excitation Current
829A
�?Stator insulation 
B
Rotor insulation
F( Examination on B Grade)
 
3. GT Operation
!#GT was first put in operation in Oct. 1996, until now it started 1,430 times, among them ignition it 1,113times. In total, it operates 12,716 hours, among them, operation burning fuel (light oil) is 12,292 hours, gas fuel (gas) 424 hours, 16 interruptions. At present, 1#GT can’t operate with full load, due to vibration with generator, other aspects are all normal.
 
4. Introduction to Inspection and Repair
1. in April in 1999, after operating 3,920 hours, GT was done with combustion inspection. We replaced the flame tubes 1#, 3# and 10#.
2. in March in 2003, operating 6,452 hours, GT went into half-way repair. We replaced flame tube 9# and positive flame connecting tubes 1-2 and 2-3; 10 transition portions were sent to Shenyang for repair, replacing inside and outside floating seal and spraying coating again.
3. in March in 2004, after operating 8,500 hours, generator went into large-scale repair, replacing Bearing 4#, repairing Bearing 3#; The generator guard ring shifts, generator were sent to Nanjing Turbine and Electric Machinery Co. to reassemble.
4. in March of 2005, after operating 11,722 hours, GT went into overhauling.
Overhaul appendix gear box: replace Bearing 2# and Tile 3#, Bearing 3A# and Tile 5#, Bearing 3B# and Tile #, Bearing 4# and 4 tiles inside and outside.
Generator Overhaul: sent generator rotor back to Nanjing company to replace its guard ring.
Loading gear box Overhaul: replacing the tiles of low-speed shaft and GT ending shaft, at the same time, finding radial runout of high-speed shaft to reach 1.31, but not handled it.
Overhaul GT body: replacing the first level sprayer, 10 transition portions and tiles of Bearings 1# and 2#.
 
1.1.3 technical specification of AC main Exciter without brush
Manufacturer
Nanjing Turbine and Electric Machinery Co.
Model
JWL130-3000
Product Standard
QJ/NQ004-89
Phase Count
3
Excitation Method
Separate excitation
Rotational Speed
3000 rpm
DC Power 
130KW
DC Voltage
157V
DC Electric Current
829A
Excitation Voltage
46.1V
Excitation Electric Current
6.2A
Rectification Way
Three-phase bridge
Insulation Class
B
 
1.1.4 Vice-exciter technical specifications:
Manufacturer
Nanjing Turbine and Electric Machinery Co.
Model
TFY2.85-3000C
Product Standard
QJ/NQ005-89
 
Phase Counts
1
Excitation Method
Permanent Excitation
Rotational Speed
3000 rpm
 Frequency
400HZ
Power Factor
0.9
Capacity
2.85KVA
 Voltage
190V
 
Electric Current
15A
Insulation Class
F
 
2# Gas Turbine
1. Technical specifications:
Manufacturer: China Nanjing Turbine and Electric Machinery Co.
Model: PG6561B
Under the condition of ISO (Air temperature 15�? Atmospheric Pressure  1.013×105Pa, Relative Humidity 60% ), under the basic load, units technical specifications are as follows:
GT Rotational speed 5,133RPM, intake pressure loss 996Pa, exhaust pressure loss 622Pa. When units uses liquid fuel GEI-41047 and gas fuel GEI�?1040E, units parameters in single cycle operation are as follows:
     Operation Model
Basic Load
   
Fuel
Light Oil
Gas
Output Power     kW
38000
38700
Heat Rate KJ/KW.h
11514
11430
Heat Consumption 106KJ/h
439
443
Turbine inlet temperature        �?/DIV>
1104
1104
Exhaust temperature       �?/DIV>
532
532
Air Flow   103Kg/h
499
499
 
2. Generator technical specifications
Manufacturer
Nanjing Turbine and Electric Machinery Co.
Model
QFR-38-2
Phase Number
3
Pole Number
2
Power
38MW
Voltage
10.5KV
Electric Current
2611�?A
Power Factor
0.8
Frequency
50HZ
Rotational Speed
3000 rpm
Excitation Voltage
162V
Excitation Current
860A
Insulation Class
F
Stator Connection 
Y
 
3. GT Operation
      3#GT started operation from July in 2003, until now started 534 times, among them ignition 497 times. In total, it operates for 6,201 hours, among which operation burning liquid fuel (light oil) for 5,582 hours, burning gas fuel (gas) for 619 hours, 21 interruptions. At present, the operation of 3# GT is basically in very good condition.
 
4.  Introduction to Inspection and Repair
1. in Nov of 2004, after operating 4,004 hours, GT went into combustion inspection(not to dismantle transition), replacing flame connecting tubes in 7#-8#(including 7#) and 3#-2#(including 2#), and flame tube like 10#.
2. in April of 2004, after operating 5,470 hours, GT went into combustion inspection. We replace flame connecting tubes in 7#-8#(including 7#) and 9#-8#(including 9#). We sent 5 transition portions to Liming to repair: among them, the attrition of left side tail frame nearby negative camber is so severe as to be sent to repair.
 
1.1.3 Technical Specifications of AC main Exciter without Brush
Manufacturer
Nanjing Turbine and Electric Machinery Co.
Model
JWL130-3000
Product Standard
QJ/NQ004-89
Phase Number
3
Excitation Method
Separate excitation
Rotational Speed
3000 rpm
DC Power 
130KW
DC Voltage
157V
DC Current
829A
Excitation Voltage
46.1V
Excitation Current
6.2A
Rectification Way
Three-Phase Bridge
Insulation Class
B
 
1.1.4 Auxiliary Exciter Technical Specifications
Manufacturer
Nanjing Turbine and Electric Machinery Co.
Model
TFY2.85-3000C
Product Standard
QJ/NQ005-89
Phase Number
1
Excitation Method
Permanent Excitation
Rotational Speed
3000 rpm
Frequency
400HZ
Power Factor
0.9
Capacity
2.85KVA
 Voltage
190V
Electric Current
15A
Insulation Class
F
 
2006 early, to meet adjustment in national energy policy and requirements in enterprises energy reduction, our company carries out the transformation from oil to gas in GT units fuel. The transformation of #### power plant makes full use of 2.5Mpa gas Pipeline Network in the gas project of ####power plant Gas turbine combined cycle power generator units. According to actual situations to 1# units of ###power plant, just transforming gas turbine units, we mainly focus transformation on the parts of units like chasiss pipeline, gas fuel sprayer, gas fuel controlling and protecting system device, ventilation protection system and hazardous gas detection protection etc. The above work is finished at the original address, electrical access system, unit equipment structure and unit capacity haven’t been changed. The whole units transformation concluded in July of 2006. After transformation, units operate up to now.In 2006, it totally uses 2,967,000 standard cubic gas and totally produces 13,890,000 KWH electricity; in 2007, it totally uses 7,073,520 standard cubic gas and totally produces 36,700,000 KW.H electricity. Gas consumption rate in gas generating power is 0.276 cubic/kwh, compared with using diesel to generate power, unit combined cycle efficiency increases from 48% to 50%, and power generation cost decreases from 0.70yuan/kwh to 0.46yuan/kwh. Due to use clean and environment protective gas as unit fuel, unit ignition and operating stability improve remarkably, the maintenance cycle to some device of unit being extended, at the same time, combustion pollution emissions obviously decrease after gas power generation. The specific boiler is 2*65-ton HRSG produced by Hangzhou Boiler Factory, steam turbine adopting 2*18MW generator unit produced by Nanjing Turbine and Electric Machinery Co. Other situation can be provided after some customer comes to inspect it on the spot.




Links to Site

Copyright©2006 China National Electric Wire & Cable Import & Export Corporation
Tel:0086-10-85805511   Fax:0086-10-84568952  E-mail:
[email protected]