China National Electric Wire&Cable Imp./Exp. Corp  BBS  Email&MSN: [email protected]
  
Homepage   |   Equipments   |   Power Generation   |   Transmission   |   Preferential Fund   |   News   |   Contact    |   services   |   download   |   sitemaps   |   Business Opportunity   |   BBS-Blog   |   Purchasing-agent  

Mail List

E-mail:

Equipments
    Boiler   
    Diesel generator   
      1MW diesel generator    
      1.5MW Diesel Generator Set   
      2M Diesel Generator Plant   
      Sample Diesel Power Plant Proposal 9x2mw   
      Diesel power Plant List   
      Used Diesel Generator   
      Diesel Generator Pictures   
      Bio diesel generator power plant MW   
      Sample Pack List for 10x2MW HFO diesel power Plant   
      10kw-4000kw-Cummins-MTU-diesel-generator-set   
    Gas turbine   
      2MW Gas Turbine Generator   
      7mw-Siemens-SGT200-Gas-Turbine-Cogeneration-unit   
      10MW Gas Turbine Generator   
      42MW GE Gas Turbine Generator   
      Used Gas Turbine Generator Plant   
      PG6581B Gas Turbine Series Generator Plants   
      PG6581B Gas Turbine Set Supply Scope   
      Technical-Specification-PG6581B-Gas-Turbine   
      Supply-Scope-of-PG6581B-Gas-Turbine   
      GE Licensed MS9001E Series Gas Turbine plant   
      Budgetary Cost for 108MW Gas Turbine Plant   
    Hydro Turbine   
    Engineering Machinery   
      Truck Mounted Crane Crawler   
      Trailer Concrete Pump   
      China Bulldozer   
      China Crane   
      Benz Truck and Lorry from China   
    Transformer in MVA   
      Germany Certificates   
      Required Data for Quotation   
      Transformer Reference   
      Sample Inquiry   
    Steam Turbine   
      Extraction Condensing Turbine   
      Condensing Steam Turbine   
      Recovery Turbine   
      Extraction Turbine   
      Required Data for Quotation   
      Alstom-Licensed-330MW-Steam-Turbine   
      Quotation-50MW-condensing-steam-turbine   
      Quotation-30MW-Condesing-Steam-Turbine   
    Cable&Wire   
    Electric Motor   
    Power Plant Generator   
      Air Cooled Power Generator   
    Wind Turbine Generator   

Diesel Generator Proposal

Power Plant Proposal

 

Home > Equipments > Gas turbine - PG6531 PG9171E GE Alstom Used Gas Turbine Gen


 

PG6531 PG9171E GE Alstom Used Gas Turbine Gen

Two Phases Used Combined Cycle Gas Turbine Power Plants of 106+172MW
 
First Stage of Combined cycle Gas turbine plants
The power plant was constructed in two phases. The first phase was invested March, 1987, as a combined cycle with total capacity of 106mw. and the second phase is of 172.8MW of combined cycle too.
Total equipments were imported from abroad, two units of PG6531 gas turbine gensets were made by JBE to GE technology with rated unit capacity of 36mw. And two units of single pressure natural circulation heat recovery boilers of capacity of 66T/H were manufactured by SFL, Netherland, one extraction steam turbine of 34mw was made by Siemens.
The first phase was put into operation as single cycle in 1990, and constructed as combined cycle in operation in 1991. In 1994 the fuel feed system was modified from gas system to duel system for crude oil and natural gas. The modified combined duel fuel system was synchronized to grid for supply power to gird in 1996. until 2000, the total generated power is 2328489.6MWH, total running hours of the three generating units are 107925.4 hours.
Second Phase of the gas turbine power plant
The second phase of the power plant is also a combined cycle gas turbine power plant as a captive power plant. One set of imported gas turbine genset with capacity of 116.8MW and one set of heat recovery boiler and one set of 56MW steam turbine generator set was configured as as power plant with total capacity of 172.8MW, main fuel is natural gas.
Background of Second Phase of the power plant
The gas turbine genset was PG9171E made by GEC-Alstom, of capacity of 116.8MW, heat recovery boiler of 210T/H, made by Hangzhou, one set of steam turbine genset of 56MW, made by Harbin, total capacity of the second phase is 172.8MW.
The project of the second phase was first started for construction in Oct. 2002, and put into operation in Aug. 2003. The running hours of PG9171E is about 2935.8 hours, total power generated by the combined cycle of phase two is 1.65X108kW.h.Then was shut down due to lack of fuel.
Specification on Second Phase Gas Turbine Genset.
Fuel as natural gas (under ISO standard:

Fuel
Output
Efficiency
Exhausted Gas
Natural Gas
116.8MW
33.3%
524 Celsius Degree
Crude Oil
115.4MW
33.36%
526 Celsius Degree

 
The system was designed as duel fuel system with one set of crude oil treatment system (there are three routs of crude oil treatment lines, two lines were installed, one line was not installed), one set of natural gas filtering system, one set of front oil supply skid.
Crude oil treatment system was finished for construction and commissioning in 2000, and then modified to use natural gas as main fuel, crude oil as standby fuel. In Aug. 2002 single cycle power plant was commissioned for natural gas as fuel, commissioning for crude oil is not progressed.
 
Gas Turbine Specification of Second Phase:
The rated speed for gas turbine sets are 3000rpm, first critical speed is 1318rpm, second critical speed is 2378rpm, third critical speed is 3891rpm, on load speed is 3300rpm.
Gas turbine booster is of axial flow type, with 17 stages.
Gas turbine turbine is of 3 stages, there are 14 combustors.
Air filter is of 3 stages.
Gas turbine control system was MK V control system, provided by GE.
 
Generator Specification of Second Phase:
T900B generator was made by Alston, rated power: 119.2MW, power factor is 0.85,rated voltage: 15KV, rated current: 5398A, rated speed: 3000rpm, frequency: 50HZ, phase: 3 phases, connect type for stator: Y, cooling type: air cooling
Transformer Specification:
Step up transformer type: SFP9-150000/110
150MVA; Ud=10.5%; Yn, d11; 121+-2.5%/15kV
Plant transformer for gas turbine plant type: S9-10000/15
10MVA; Ud=10.5%; D,d0; 15+-2.5%/6.3 kV
Gas turbine power plant step up transformer, plant transformer is of closed bus bas connection.
Power was evacuated by 110kv power cable to 110KV substation.
 
Heat Recovery Boiler of Second Phase
Heat Recovery Boiler is of double pressure, non- supplementary fuel, outdoor installation, and force circulation, type: Q1152/527-174.8(33)-5.6(0.6)/504(245).
Under oil fuel condition:
high pressure route: high pressure overheat steam flow is 175T/H, high pressure over heat pressure is 5.7MPa(a), high pressure overheat temperature is 504 C degree.
Low Pressure route, low pressure route: low pressure overheat steam flow is 34.49T/H, low pressure overheat steam pressure is 0.6MPa(a), low pressure overheat temperature is 245 C degree.
Under natural gas condition:
high pressure route: high pressure overheat steam flow is 186.8t/h, high pressure over heat pressure is 6.04MPa(a), high pressure overheat temperature is 520 C degree.
Low Pressure route, low pressure route: low pressure overheat steam flow is 32.4T/H, low pressure overheat steam pressure is 0.64MPa(a), low pressure overheat temperature is 242.7 C degree. The efficiency of the heat recovery boiler is 71.7%.
 
Description on Second Phase Steam Turbine Generator Set
The steam turbine is of indoor installation, single cylinder, underneath exhaust, condensing type.
Generator type: WX18Z-054, rated power 60mw, rated factor is 0.85, rated voltage is 10.5KV, rated current is 4124A, rated speed is 3000RPM, rated frequency is 50HZ, 3 phases, stator connection type: Y, air cooling.
Exciter type: WBF8-56, rated power is 275Kw, rated voltage: 230kv, rated current is 1195A, rated speed: 3000rpm.
Step up Transformer: SFP9-80000/110; 80MVA; Ud=10.5%; Yn,d11; 121+-2.5%/10.5kV
Pictures attached in Pdf attachment.
If you are interested, please contact ASAP us at:
 
Yang chun Lin
 
Project Manager
 
China National Electric wire&Cable Imp./Exp. Corp. (Chinacables)
 
Coordinator and Advisor for:
China National Machinery Equipment Imp./Exp. Corp. (CMEC)
China National Automobile Corp. (CNAICO)
Sinomach Group
Tel: 0086 10 85805516
Fax: 0086 10-84568952
Mobile: 0086 13801218512
D-803, Shengshijiayuan, Road 98, Jianguo, Beijing 100022, China 
 
 
 
 




Links to Site

Copyright©2006 China National Electric Wire & Cable Import & Export Corporation
Tel:0086-10-85805511   Fax:0086-10-84568952  E-mail:
[email protected]