    geothermal power plant   
      Work Scope   
      Design Data   
      Steam Turbine   
      Cooling System   
      Water System   
      Ventilation   
      Instrumentation Auto.   
      Electrification   
    Diesel power Plant   
    waste heat recovery power plant   
      4.5MW Waste heat recovery 2500t/d Cement Line   
      7.5MW Waste heat recovery 2x2500t/d Cement Line   
      9MW Waste heat recovery 5000t/d Cement Line   
      18MW Waste heat recovery 2x5000t/d Cement Line   
      Technical Proposal of 9MW Recovery Plant   
      Power Plant Connection and Main Equipments   
      Main Equipment Recovery Plant   
      Power Plant Construction Schedule   
      China Reference List waste heat Plants   
      Preliminary Proposal for Cement Plant   
    Thermal Power proposal   
    Questionnaire for Gas/HFO/Liquid Fuel Power Plant   
    Check-List-for-quotation-on-power-plant   
    Power project reference   
      Thermal plant List   
      Foreign Small plant   
      Reference of Sinomach   
      Diesel generator plant list    
      waste heat recovery power plant list   
      Gas Turbine Power plant Reference   
    Indicative quotation of 2x50MW coal fired plant   
    Estimated Quotation for Plant   
    Biomass-Gasification-Power-Generation-System   
    Gas Engine Generator power plant   

Diesel Generator Proposal

Power Plant Proposal

 

Home > Power Generation > waste heat recovery power plant - proposal 50mw coal fired heat recovery plant


 

proposal 50mw coal fired heat recovery plant

Proposal of 50mw Coal fired and Heat recovery power plant
1.      The Working Scope
 
Sub-item
Name of Sub-item
Remarks
700
Power station general layout
 
711
Supplement Boiler
Including waste gas treatment
712
Turbine & Generator Room
 
715a
AQC boiler
 
715c
SP boiler
 
717
Fuel Transportation
 
718
Fuel preparation and transportation
 
722
Slag treatment
 
723
Pulverized fuel ash treatment
 
729
Outdoor pipeline
Including steam, water, compress air and oil
751
Dematerialized water treatment
 
753
Water cooling tower
 
754
Domestic and firefighting water feeding pipeline
 
755
Domestic and firefighting water discharging pipeline
 
756
Water circulating pipeline
 
762
Generator and self high-voltage system
 
763
Power station electricity room
 
764
Power station power distribution
 
765
Power station Grounding and Lightning
 
766
Power station DCS control system
 
767
Power station dispatching telephone system
 
768
Power station telephone system
 
769
Power station Central Control Room
 
770
Power station Outdoor lighting
 
 
The waste heat, which is exhausted from the clinker production line, can be utilized are as follow:
The waste gas exhausted from the cooler is 160,000Nm3/h�?20�?acirc;90�? contains heat about 20401×104kJ/h, which can generate saturated steam of  6t/h�?.5MPa.
The waste gas exhausted from the preheater is 357,000Nm3/h�?20�?acirc;260�?the designing of outlet temperature of the boiler considering the raw material drying requirement), contains heat about 21,290×104kJ/h, which can generate saturated steam of  13t/h�?.5MPa.
3.      Fuel
The information of the coal is as follow:
Net calorific power: 20,000kJ/kg
Ash content: 10~15�?/DIV>
Sulfur content�?~4�?/DIV>
By calculating, the average coal consumption per hour is 33ton, annual coal consumption is 247500ton (running hour 7500 per year). The capacity of fuel yard is designed for 15 days; area is 48×150m which can store coal with 11880ton. The coal will be fed to the belt by coal bin, then transported to the crusher, after screening, the finished coal will be stored in the bin in front of the boiler.
4.      Installation solution
The saturated steam with 4.5MPa generated by AQC boiler and SP boiler will be introduced into the steam drum of the supplement boiler merging with the saturated steam generated by supplement boiler. The superheated steam generated by supplement boiler with parameter of 3.82MPa�?50�?will be introduced into the steam turbine for power generation. The exhaust steam from the turbine will be cooled to the water and then introduced into the deaerator, then pumped to the supplement boiler and AQC boiler as the feed water. The new type circulating fluidized bed boiler will be adopted as the supplement boiler, the advantage of which is that it can run in large range of the outcoming steam. The main steam parameter of the supplement boiler  200t/h�?.82MPa�?50�?  the saturated steam flowrate from the waste heat boiler is 19t/h, and the self evaporation capacity is 180t/h. The installed capacity of the steam turbine and generator is 50MW, minus the self power consumption, the net power supply to the cement plant is 45MW.
5.      Treatment of waste gas and slag
The electrical precipitator with single line and four electric fields will be adopted as the waste gas treatment equipment of supplement boiler. The collected dust will be transported to the cement production line as a kind of raw material. The storage bin will be installed for storing the slag discharged from the supplement boiler, the slag will be transported to the cement production line. The waste gas will be induced to the stack by fan.
6.      Sulfur removal treatment
The sulfur removal device should be adopted in supplement boiler, as per the sulfur content of the coal and the characteristic of the supplement boiler, when the furnace temperature is around 800�?00�? burning the limestone with rated particle size, the sulfur removed efficiency can reach 80%, which will fulfill the environmental protection requirement.
7.      Cooling water and Demineralized water System
Water circulating cooling system will be selected which includes the pumps, cooling towers, water pond and pipeline. During the system working, the cooling water will be pumped from the water pond to the equipments which needed to be cooled; after heat exchanging, the water will be transported back to the cooling tower.
The mixed-bed exchanger system will be selected as the water demineralization system. The process of water treatment is as follow:
Water (domestic water pipeline or firefighting pipeline) →mechanical filter→clean water tank→clean water pump→action exchanger→CO2 removal equipment→intermediate tank→intermediate pump→anion exchanger→demineralized water tank→Demineralized water pump→Turbine room
8.      Main Equipment
No.
Equipment name
Q’TY
Specification
1
AQC boiler
1
Inlet gas volume�?nbsp;     160000Nm3/h
Inlet gas temp.�?nbsp;   320�?/DIV>
Steam flowrate�?nbsp;    6t/h�?.5MPa(saturated�?/DIV>
Feed water temp.�?nbsp;       40�?/DIV>
Arrangement�?nbsp;         outdoor
2
SP boiler
1
Inlet gas volume�?nbsp;     357000Nm3/h
Inlet gas temp.�?nbsp;   320�?/DIV>
Steam flowrate�?nbsp;   13t/h�?.5MPa(saturated�?/DIV>
Feed water temp.�?nbsp;       120�?/DIV>
Arrangement�?nbsp;      outdoor
3
Circulating fluidized bed supplement boiler
1
Steam flowrate�?nbsp;   220t/h
Steam pressure�?nbsp;     3.82MPa
Steam temp.�?nbsp;     450�?/DIV>
Evaporation capacity �?nbsp;     220t/h
Total efficiency:≥90%
4
Condensing Steam Turbine
1
Model�?nbsp;       N50�?.43
Rate power�?nbsp;   50MW
Rated speed of rotation�?nbsp;   3000r/min
Rated Main Steam pressure�?.43MPa
Rated Main Steam temp.�?35�?/DIV>
Exhaust pressure�?nbsp;   0.008MPa
5
Generator
1
Model�?nbsp;       QF�?0�?
Rate power�?nbsp;   50MW 
6
Crusher
1
Capacity�?nbsp;   100t/h
7
Sifting screen
1
Capacity�?nbsp;       150t/h
8
Belt Conveyor
3
Capacity�?nbsp;   150t/h
9
Low speed
1
Capacity�?nbsp;     32t
10
Screw conveyor
3
Capaicty�?nbsp;    30t/h
11
Primary fan
1
Capacity�?nbsp;        185000m3/h
12
Secondary fan
1
Capacity�?nbsp;        145000m3/h
13
Induce fan
1
Capacity�?nbsp;        360000m3/h
14
Deaerator
1
Capacity�?nbsp;            200t/h
Working pressure�?nbsp;   0.02MPa
15
Demi-water
1
Capacity�?nbsp;  50t/h
16
Circulating water pump
4
capacity�?nbsp;      5000m3/h
17
Cooling tower
4
capacity�?nbsp;      5000m3/h
 
9.      Main Indexes
No
Technical Designation
Unit
Index
Remarks
1
Installed Capacity
MW
50
 
2
Average power generation
MW
50
 
3
Running Hour
h
7200
 
4
Annual power generation
104kWh/a
36000
 
5
Annual power supply
104kWh/a
32400
 
6
Annual coal consumption
104t/a
23.8
 
7
Annual water consumption
104t/a