BASIC CHECKLIST OF A THERMAL POWER PLANT PROJECT
I. GENERAL INFORMATION OF CUSTOMER:
A. Contact Information:
Name: |
Daniel Meany |
Title: |
Mr. |
Company: |
Generadora de Energía Renovable, S.A. (GENERE, S.A.) |
Tel: |
|
Fax: |
|
E-mail 1: |
|
E-mail 2: |
|
Address : |
|
Website: |
|
Brief Company Background:
Industry Type: |
Power Generation |
Existing Factory Production Capacity: |
New Factory |
Power Source: |
New Factory |
Existing Self-owned Power Plant Capacity: |
New Factory |
Power Shortage for Production: |
30 MW new supply |
Other Problems needs to be solved: |
|
I. SPECIFIC INFORMATION ON THE PLANT REQUIRED:
A. General Information:
Project Characteristic: |
Private Project |
New Plant |
Possible Future Expansion Plans/Proposals: |
Yes, another 30 MW for future expansion. |
Purpose of Power Plant: |
Self-owned Power Supply Station to sell energy to the Guatemala market. |
Project Construction Method: |
EPC |
Project Construction Method: |
EPC |
Planned Schedule: |
Start: as soon as possible. |
Project and Import License |
|
Project competition status: |
Negotiation Bid |
Potential competitors: |
Used and refurbished machines |
A. Requirement Details for Proposed Power Plant:
Proposed Power Plant: |
Capacity: 1 Complete 30 MW Coal Fired Power Plant.
Codes/Standards required:
According to World Bank. |
Boiler: |
Type: To suit manufacturer’s design
Capacity (t/h): To suit manufacturer’s design
Steam Pressure (Mpa): To suit manufacturer’s design
Steam Temperature: To suit manufacturer’s design
Feed Water Temperature: 25°C |
Turbine: |
Type: To suit manufacturer’s design
Output Requirement (KW): to suit 30 MW output
Exhaust Pressure (Barg): To suit manufacturer’s design
Process Steam Requirement (if any)
Quantity (t/h): n/a
Pressure (Barg): n/a
Temperature: n/a |
Generator: |
Output Requirement (KW): 30 MW
Output Voltage (KV): 13,800 volts
Frequency (Hz): 60 Hz.
Excitation Type: To suit manufacturer’s design |
Emission Requirement: |
World Bank Emissions standard to be used as guideline. Final requirement after EIA approval. |
Owner’s Brand Preference for Main Equipment: |
Chinese Product |
Other Special Requirement (Please Specify): |
|
I. DESIRED SCOPE OF SUPPLY:
A. Civil Work: Excluded
B. Installation and Commissioning: Included
C. Boiler and Auxiliary equipment: Included
D. Turbine and Auxiliary equipment: Included
E. Generator and Auxiliary equipment: Included
F. Fuel handling system: Included
G. Water Treatment system: Included
H. Electricity System: Included
I. DCS and Instrumentation: Included
J. Cooling Water System: Included
I. INFORMATION NEEDED FROM THE OWNER:
A. Site Information:
Location: |
Latitude: 14° 57�?30.9’� North
Longitude: 89° 47´ 54.8´´ West (approx location) |
Site Layout (if available): |
|
Site Conditions (please attach the reports concerned): |
Meteorological Condition: 500mm. to 800mm. per year.
Topographical Condition: 255 mts. Above sea level. Mostly flat.
Geological Condition: |
Distances of fuel, power, water, etc, from the site: |
Fuel: Coal to be imported via trucks form port in Atlantic Ocean.
Power:
Water: Well.
Other (Please Specify): |
Distance to Consumption Points: |
Proposed Plant ~ End User: 1 Km.
Proposed Plant ~National Grid: |
Information on the existing system (if the expansion project is applied):
|
Layout of The Factory
Existing Water Treatment System:
Factory Existing Electricity Single Line Diagram
Existing Transformers Specification:
Other Systems (Please Specify): |
B. Fuel Specification (please attach analysis report if available):
Type: |
Sub-bituminous coal (values below are approximate and final fuel spec will be discussed to suit manufacturer’s machines) |
LHV (Kcal): |
6,150 - 5,595 Kcal “El Cerrejon�?/SPAN> |
Carbon Content (%): |
35-58% (Air Dried Basis) |
Volatile Content (%): |
32-34% (Air Dried Basis) |
Sulfur Content (%): |
<0.85% (Air Dried Basis) |
Ash Content (%): |
7.7-15.5% (Air Dried Basis) |
Moisture (%): |
10.5-15.5% (AR Basis) |
C. Raw Water Analysis (please attach analysis report if available):
Hardness: |
155 mg/L |
PH Value: |
7.8 |
Conductivity: |
314 uS/cm |
Temperature: |
25.0º C |
Pressure: |
|
Total Alkalinity: |
8.2= 20.0 mg/L, 4.3= 185.0 mg/L |
Total Dissolved Oxygen: |
5.0 mg/L |
Ca/Mg/S/Cl/Fe/Si/O2 Content: |
Ca=75.0 mg/L, Mg= ?, S=<0.02 mg/L, Cl=10.0 mg/L, Fe=0.10 mg/L, Si=8.84 mg/L, O2= ?, |
I. FINANCIAL DATA & CONDITIONS:
Proposed Source of Financing: |
Private investment and local finance. |
Proposed Capital Investment on The Project and Estimated Cost of Equipment/Accessories for Budgeting Purposes: |
|
Banking reference: |
|
Other relevant information on customer's financial position: |
|
|