Power Generation
    geothermal power plant   
      Work Scope   
      Design Data   
      Steam Turbine   
      Cooling System   
      Water System   
      Ventilation   
      Instrumentation Auto.   
      Electrification   
    Diesel power Plant   
    waste heat recovery power plant   
      4.5MW Waste heat recovery 2500t/d Cement Line   
      7.5MW Waste heat recovery 2x2500t/d Cement Line   
      9MW Waste heat recovery 5000t/d Cement Line   
      18MW Waste heat recovery 2x5000t/d Cement Line   
      Technical Proposal of 9MW Recovery Plant   
      Power Plant Connection and Main Equipments   
      Main Equipment Recovery Plant   
      Power Plant Construction Schedule   
      China Reference List waste heat Plants   
    Thermal Power proposal   
    Questionnaire for Gas/HFO/Liquid Fuel Power Plant   
    Check-List-for-quotation-on-power-plant   
    Power project reference   
      Thermal plant List   
      Foreign Small plant   
      Reference of Sinomach   
      Diesel generator plant list    
      waste heat recovery power plant list   
      Gas Turbine Power plant Reference   
    Indicative quotation of 2x50MW coal fired plant   
    Estimated Quotation for Plant   
    Biomass-Gasification-Power-Generation-System   
    Gas Engine Generator power plant   

Diesel Generator Proposal

Power Plant Proposal

 

Home > Power Generation - Check List for Thermal Power Plant


 

Check List for Thermal Power Plant

 

BASIC CHECKLIST OF A THERMAL POWER PLANT PROJECT

I.              GENERAL INFORMATION OF CUSTOMER:

 A.            Contact Information:

Name:

 Daniel Meany

Title:

 Mr.

Company:

 Generadora de Energía Renovable, S.A.  (GENERE, S.A.)

Tel:

 

Fax:

 

E-mail 1:

 

E-mail 2:

 

Address :

 

Website:

 

    

 

 

 

Brief Company Background:

Industry Type:

 Power Generation

Existing Factory Production Capacity:

New Factory

Power Source:

       New Factory

Existing Self-owned Power Plant Capacity:

New Factory

Power Shortage for Production:

30 MW new supply

Other Problems needs to be solved:

 

I.                    SPECIFIC INFORMATION ON THE PLANT REQUIRED:

 A.      General Information:

Project Characteristic:

    Private Project

New Plant

Possible Future Expansion Plans/Proposals:

Yes, another 30 MW for future expansion.

Purpose of Power Plant:

Self-owned Power Supply Station to sell energy to the Guatemala market.

Project Construction Method:

EPC

Project Construction Method:

  EPC

Planned Schedule:

Start: as soon as possible.

Project and Import License

 

Project competition status:

       Negotiation Bid

Potential competitors:

Used and refurbished machines

 A.      Requirement Details for Proposed Power Plant:

Proposed Power Plant:

Capacity:  1 Complete 30 MW Coal Fired Power Plant.

Codes/Standards required:

According to World Bank.

Boiler:

Type: To suit manufacturer’s design

Capacity (t/h): To suit manufacturer’s design

Steam Pressure (Mpa): To suit manufacturer’s design

Steam Temperature:  To suit manufacturer’s design

Feed Water Temperature:  25°C

Turbine:

Type: To suit manufacturer’s design

Output Requirement (KW): to suit 30 MW output

Exhaust Pressure (Barg): To suit manufacturer’s design

Process Steam Requirement (if any)

Quantity (t/h): n/a

Pressure (Barg): n/a

Temperature: n/a

Generator:

Output Requirement (KW): 30 MW

Output Voltage (KV): 13,800 volts

Frequency (Hz): 60 Hz.

Excitation Type: To suit manufacturer’s design

Emission Requirement:

World Bank Emissions standard to be used as guideline. Final requirement after EIA approval. 

Owner’s Brand Preference for Main Equipment:

Chinese Product

Other Special Requirement (Please Specify):

 

I.              DESIRED SCOPE OF SUPPLY:

A.        Civil Work:  Excluded         

B.        Installation and Commissioning:  Included              

C.        Boiler and Auxiliary equipment:  Included             

D.        Turbine and Auxiliary equipment:  Included                       

E.        Generator and Auxiliary equipment:  Included                       

F.        Fuel handling system:  Included                    

G.       Water Treatment system:  Included                 

H.        Electricity System:  Included                      

I.          DCS and Instrumentation:  Included                 

J.        Cooling Water System:  Included                  

 I.              INFORMATION NEEDED FROM THE OWNER:

 A.      Site Information:

Location:

Latitude: 14° 57�?30.9’� North

Longitude: 89° 47´ 54.8´´ West (approx location)

Site Layout (if available):

 

Site Conditions (please attach the reports concerned): 

Meteorological Condition:  500mm. to 800mm. per year.

Topographical Condition:  255 mts. Above sea level.  Mostly flat.

Geological Condition:

Distances of fuel, power, water, etc, from the site:

Fuel: Coal to be imported via trucks form port in Atlantic Ocean.

Power:

Water:  Well.

Other (Please Specify):

Distance to Consumption Points:

Proposed Plant ~ End User:  1 Km.

Proposed Plant ~National Grid:

Information on the existing system (if the expansion project is applied):

 

Layout of The Factory

Existing Water Treatment System:

Factory Existing Electricity Single Line Diagram

Existing Transformers Specification:

Other Systems (Please Specify):

 

 

 B.      Fuel Specification (please attach analysis report if available):

Type:

 Sub-bituminous coal (values below are approximate and final fuel spec will be discussed to suit manufacturer’s machines)

LHV (Kcal):

 6,150 - 5,595 Kcal “El Cerrejon�?/SPAN>

Carbon Content (%):

 35-58% (Air Dried Basis)

Volatile Content (%):

32-34% (Air Dried Basis)

Sulfur Content (%):

 <0.85% (Air Dried Basis)

Ash Content (%):

 7.7-15.5% (Air Dried Basis)

Moisture (%):

10.5-15.5% (AR Basis)

C.      Raw Water Analysis (please attach analysis report if available):   

Hardness:

155 mg/L

PH Value:

7.8

 

Conductivity:

314 uS/cm

Temperature:

25.0º C

Pressure:

 

Total Alkalinity:

8.2= 20.0 mg/L, 4.3= 185.0 mg/L

Total Dissolved Oxygen:

5.0 mg/L

Ca/Mg/S/Cl/Fe/Si/O2 Content:

Ca=75.0 mg/L, Mg= ?, S=<0.02 mg/L, Cl=10.0 mg/L, Fe=0.10 mg/L, Si=8.84 mg/L, O2= ?,

I.              FINANCIAL DATA & CONDITIONS:

Proposed Source of Financing:

 Private investment and local finance.

Proposed Capital Investment on The Project and Estimated Cost of Equipment/Accessories for Budgeting Purposes:

 

Banking reference:

 

Other relevant information on customer's financial position:

 

 