Homepage   |   Power Generation   |   Top Spare parts   |   spare parts   |   China OEM Equipment and Spare Parts   |   Project Financing    |   Equipments   |   China Small EPC Contractor   |   Transmission   |   Financing-Ebook   |   Contact Us   |   Used Equipment   |   download   |   sitemaps   |   Project-Equipment-Parts-Enquiry   |   供货商Supplier   |   Exchange Link   |   Breaking News  

Mail List

E-mail:

Home > China Small EPC Contractor - Quotation of Siemens SGT-600 gas turbine power plant project


Google

Quotation of Siemens SGT-600 gas turbine power plant project

Many thanks for your inquiry. According to the project information and requirements provided by your company, combined with the scope of supply, we have completed the initial layout plan of the JEDDO20MW gas turbine power plant project in Nigeria. Now we offer our plan layout and basic price terms as follows:

 S/N    Item Description    QTY    Remark  
 1    Siemens SGT600 (25MW) or similar gas turbine and accessory    1 set    For detailed system configuration, see Annex 2  
 2    Single-cycle chimney    1 batch    For detailed system configuration, see Annex 2  
 3    Desalination system    1 batch    For detailed system configuration, see Annex 2  
 4    Air compression system    1 batch    For detailed system configuration, see Annex 2  
 5    Cooling water system    1 batch    For detailed system configuration, see Annex 2  
 6    Fully submerged CO2 fire fighting system    1 batch    For detailed system configuration, see Annex 2  
 7    Installation materials    1 batch    For detailed system configuration, see Annex 2  
 8    Freight (To Lagos Port)    - 
 9   Installation and commissioning of field equipment  

Notes:
1.1 This quotation is based on the basic requirements and information of the project obtained by our
company at this stage, as well as the basic scheme and concept of our company. If there are new
requirements and technical changes in the future, resulting in changes in the plan, this quotation will be
adjusted accordingly.
1.2 Party A is responsible for the processing and fees of work visa for Party B personnel.
1.3 This quotation does not include the transportation and insurance costs of goods from the Lagos port
of Nigeria to the project site. Party A shall be responsible for all required insurance types and taxes in
Nigeria, including all engineering risks.
1.4 This quotation includes the personal insurance of the personnel of our company who will go to the
site, but does not include the epidemic prevention insurance required for the prevention and control of
the epidemic situation.
1.5 Party A is responsible for on-site civil construction and other work outside the above list.
2. Payment Terms
2.1 Within 15 days after the signing of the contract, 80% of the total contract amount shall be paid as a
prepayment. Party B shall provide a prepayment guarantee of the corresponding amount.

2.2 After the goods arrive at the port of Lagos in Nigeria, Party A shall pay the remaining 20% of the
total contract to Party B.
2.3 The part beyond the scope of the contract shall be negotiated separately.
3. Contract Effective Terms
3.1 Subject to receipt of contract advance payment as effective condition.
4. Guarantee Period
4.1 One year after the equipment COD or 18 months after the equipment is delivered, whichever comes
first.
5. Offer Validity
5.1 This quotation is effective from the date of issuance and is valid for 60 days.
Attachment 1: Nigerian JEDDO 20MW gas turbine power plant project layout plan
Attachment 2: Nigerian JEDDO 20MW gas turbine power Plant Project Equipment List





Statement: Any reference to the OEM, part number or other OEM information is for the purpose of identification only and does not imply that the part was manufactured by the Original Equipment Manufacturer.

All the brands and trademarks in the whole domain of the website belong to their own owners and does not mean that we are their authorized partner or dealer. All the information in this website is only for reference, we do not assure its accuracy.

This statement supersedes all other claims and statements on all pages, files, pics and information within this whole web domain.
Copyright©2006-2019 Leda Greenpower Beijing ICP Reg. No: 10010978.   Fax:0086-10-84161062  E-mail:
[email protected] [email protected]