Email: [email protected]   WhatsApp/WeChat: +0086-13801218512
  
Homepage   |   Power Generation   |   Top Spare parts   |   spare parts   |   China OEM Equipment and Spare Parts   |   Project Financing    |   Equipments   |   China Small EPC Contractor   |   Transmission   |   Financing-Ebook   |   Contact Us   |   Used Equipment   |   download   |   sitemaps   |   Project-Equipment-Parts-Enquiry   |   供货商Supplier   |   Exchange Link   |   Breaking News  
Mail List

E-mail:

     上方导航  
       Homepage  
       Power Generation  
       Top Spare parts  
       spare parts  
       China OEM Equipment and Spare Parts  
       Project Financing   
       Equipments  
       China Small EPC Contractor  
       Transmission  
       Financing-Ebook  
       Contact Us  
       Used Equipment  
       download  
       sitemaps  
       Project-Equipment-Parts-Enquiry  
       供货商Supplier  
       Exchange Link  
       Breaking News  
     下方导航  

Diesel Generator Proposal

Power Plant Proposal
Required Information for Power Plant Project design and quotation

Home > HomePage > Project > New Project > Fluid Power Generation Industry - HFO Power plant 100MW quotation and proposal by MAN engine

Buyer     Inquiry Basket     Supplier     Register


HFO Power plant 100MW quotation and proposal by MAN engine


Industry:Fluid Power Generation Industry
Project Name:HFO Power plant 100MW quotation and proposal by MAN engine
Main Equipment Brand:MAN
Main Equipment Model:18V3240
Origin of Product:
Project Progress:新项�?New Project
Project Country:
Project Capacity:
Summary Briefs
on the Project:
Project Role:
Bidding Or Negotiation:
Project Funding: 
Payment Terms:
Project Type:
Project Start And End Time: - 
Name Of Project Partners:
File Link:NO_File


Quotation   - Power plant 100MW ( DO )
No.system unit Name Specification unit priceQty Amount 
1GENERATOR SET
   
发电机组
MAN   10L3244 Gensets5400KW 11KV 50HZ
7
MAN18V2832 Gensets4000KW 11KV 50HZ
6
MAN 18V3240 Gensets8700KW 11KV 50HZ
5

MAN7L3240   Gensets3380kw 11kv 50hz
4

Rolls-Royce   bb33453500kw 10kv 50hz
1
2电气系统
    Electric system 
集中操作系统Central Operating
    System
   
Including   parallel machine device 含并�?/span>
3
辅助设备控制�?/span>Auxiliary Equipment Control Panel
   
AC400V 50Hz  AC230V 50Hz  
9
主发电机�?/span>
    Main Genset panel
AC11kv V 50Hz  
18
高压进线�?br/>     HV carbinet (in)KYN28-24, 630A, 25KA   11KV 50HZ  
3
高压出线�?br/>     HV carbinet (out)KYN28-24, 630A, 25KA   11KV +PT
3
110V/24V直流�?br/>     110V/24V DC panel 

3
站用变压�?br/>     Transformer for power plant 11/0.4kV 50HZ 500kva
3
3燃油/润滑油系�?/span>
    fuel/lub-oil  system  
柴油卸油单元
    Diesel download unit 
50m3/h
4
柴油输油单元
    Diesel delivery unit 
20m3/h
4
4冷却水系�?/td>水冷却散热器
    water cooler  radiator


18
5排气系统EXHAUST   GAS SYSTEM消声�?膨胀节Silencer,Expansion Bellows 

18
6空气系统Air system空压机和空气�?/span>
    Air compressor and air bottle
37m3/h,30bar,1000L,   30kg/cm2, 
6
7SCR尾气处理单元2台发电机组共用SCR Two generating sets share one SCR

9
8System   Piping & Fitting & Auxiliary material系统管路、管件和�?助材�?/td>
Buyer's responsibility


9Cable   ,Bridge & Stand & Install auxiliary       materials电缆,桥架、支架和�?装材�?/td>
Buyer's responsibility


10Total Amount( Usd) FOB  shanghai 














Notes:






1. All prices base on   FOB  shanghai .


2.Quality guaranty: Provide full warranty within one year from   the date of delivery or   2000 operating hours, whichever comes first.

3.Date of delivery: 6-8months after receipt of   advance payment.


4. Payment: 50 percent   advance payment, 50 percent  before   shipment.


5. Valid date for the   offer: before Oct. 30, 2023


6. The offer is for   equioment inside the power plant only. All civil work and fuel tanks should   be taken out by customer. 

7. Installation guide and   test:




a.USD 1500 salary per   day for one engineer (total 2 persons) during installation supervision and   test (about 3 months).

b.USD 1500 salary per   day for one engineer (total 2 persons) during training and running (about 3   month).

c.The costs for   traveling between China and customer, lodging and food shall be borne by   customer.



LC_Guid:
Pubdate: 2023/4/13 17:12:09


Click add item to inquiry basket      Click Copy Shared LinksInquiry Basket

Pageviews: 9



Statement: Any reference to the OEM part number or other OEM information is for the purpose of identification only and does not imply that the part was manufactured by the Original Equipment Manufacturer.

All the brands and trademarks in the whole domain of the website belong to their own owners and does not mean that we are their authorized partner or dealer. All the information in this website is only for reference, we do not assure its accuracy.

This statement supersedes all other claims and statements on all pages, files, pics and information within this whole web domain.

Copyright©2006-2019 Leda Greenpower Beijing ICP Reg. No: 10010978.   Fax:0086-10-84161062  E-mail: [email protected]

JingGongWangAnBei: 11010802035914 Hao