QUOTATION FOR 50MW MAN 18V3240 HFO POWER PLANT |
No. | Item | Qty | Unit | Price (USD) | Total�?/span>USD�?/span> | Remark |
1 | MAN 18V3240 8700KW/6.6KV/50HZ 柴油发电机组 | 6 | set |
|
|
|
| Diesel engine MAN 18V3240 柴油�?/span> | 6 |
|
|
|
|
Alternator 发电�?/span> | 6 |
|
|
|
|
Common base frame 共同底座 | 6 |
|
|
|
|
Flexible coupling 联轴�?/span> | 6 |
|
|
|
|
Centralized console 集中控制�?/td> | 1 |
|
|
|
|
2 | Generator accessories 机组附件 |
| set |
|
|
|
| Lube oil cooler 滑油冷却�?Plate type) |
|
|
|
| Cooling module |
Fresh water cooler 淡水冷却�?/span> (Plate type) |
|
|
|
|
Lube oil filter 滑油滤器 |
|
|
|
|
lube oil thermostatic valve 滑油温控阀/span> |
|
|
|
|
HT water thermostatic valve 水温控阀 |
|
|
|
|
Motor driven water pump 电动低温水泵 |
|
|
|
|
|
Cooling radiator 散热�?/td> |
|
|
|
|
|
Air compressor (one is diesel start) 空压�?/span> |
|
|
|
|
|
Air bottle 空气�?/span> |
|
|
|
|
|
Silencer 消音�?/span> |
|
|
|
|
|
Expansion bellow 膨胀�?/span> |
|
|
|
|
|
Expansion tank 膨胀水箱 |
|
|
|
|
|
3 | Eectrical system 电气系统 |
|
|
|
|
|
| Outgoing panel 出线�?/span> |
|
|
|
| KYN28A-12 |
Linkage panel for generating 发电母线联络�?/span> |
|
|
|
| KYN28A-12 |
Station transformer panel 所��变柜 |
|
|
|
| KYN28A-12 |
PT panel 压变�?/span> |
|
|
|
| KYN28A-12 |
Plant transformer (2000kVA 6.6KV/0.69/0.4KV) 站用变压�?/span> |
|
|
|
| S11-M |
400 Volt main panel 低压辅助总柜 |
|
|
|
| GCS带双电源. GCS with Double Power |
400 Volt supply panel for DG set auxilliaries 低压辅助动力�?/span> |
|
|
|
| GCS |
Gen-set auot Synchronous 自动同期系统 |
|
|
|
|
|
DC System 直流系统 |
|
|
|
|
|
Air compressor control box 空压机动力箱 |
|
|
|
|
|
Gen-set Aux. Control Panel 机组辅助控制�?/span> |
|
|
|
|
|
4 | Water Treatment unit 燃料处理设备 |
|
|
|
|
|
5 | HFO Treatment unit 重油处理设备 |
|
|
|
|
|
| HFO purified separator module 分离机单�?/span> |
|
|
|
| 双机模块. Double Machine Module |
Common Circulating & Booster module 供油单元 |
|
|
|
|
|
LO purifier separator 滑油分离机单�?/span> |
|
|
|
|
|
Exhaust gas boiler 锅炉 |
|
|
|
|
|
HFO unloading pump station 重油卸油泵站 |
|
|
|
|
|
DO unloading pump station 轻油卸油泵站 |
|
|
|
|
|
Sludge pump station 渣油泵站 |
|
|
|
|
|
6 | Spare parts and special tools 专用工具和随机备�?/span> |
| set |
|
|
|
7 | Documents 文件 |
| set |
|
|
|
8 | Mechanical installation materials 机械安装材料 |
| set |
|
|
|
9 | Electrical installation materials 电气安装材料 |
| set |
|
|
|
10 | SEA COST 海运及保�?nbsp; 180USD/RT |
| LOT |
|
|
|
11 | Lifting, dock, warehouse and short haulage charges吊装,码头,仓库和短途运输费 |
| LOT |
|
|
|
12 | 设计,指�?培训,安装�?安装工具,耗材 |
| LOT |
|
|
|
| Sub-Amount 小计 |
|
|
|
|
|
13 | HFO tank: 2*600M3,4*200M3, 1*30M3,10m3 |
| LOT |
|
|
|
14 | DO tank 200m3, 20m3 , |
| LOT |
|
|
|
15 | 封闭式厂�?span style="">,基础.道路,土建,吊机,照明,消防,往��费用 |
| LOT |
|
|
|
16 | Site leveling, piling, pool, water supply and drainage works, personnel security场地平整,打桩,水�?/span>,给排水工程,人员安全保卫 |
| LOT |
|
|
|
| Total 合计 |
|
|
|
|
|
|
|
|
|
|
|
|
Notes: |
|
|
|
|
|
|
| 1. All prices base on EWX as where as it. |
|
|
| 2.The above quotation is based on the current preliminary demand reference, and the owner needs to provide detailed information such as the site geological survey report, local conditions, and the power consumption of the factory, and commercial reqruirement for final quotation confirmation. |
| 2.Quality guaranty: Provide full warranty within one year from the date of delivery or 2000 operating hours, whichever comes first. |
| 3.Date of delivery: 12 months after receipt of advance payment. |
|
|
| 4. Payment: 60 percent advance payment, 40 percent before shipment. |
|
|
| 5. Valid date for the offer: 20 days. |
|
|
| 6. The offer is for equioment inside the power plant only. All civil work and fuel tanks should be taken out by customer. |
|
| 7. Installation guide and test: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|