Email: [email protected]   WhatsApp/WeChat: +0086-13801218512
  
Homepage   |   Power Generation   |   Top Spare parts   |   spare parts   |   China OEM Equipment and Spare Parts   |   Project Financing    |   Equipments   |   China Small EPC Contractor   |   Transmission   |   Financing-Ebook   |   Contact Us   |   Used Equipment   |   download   |   sitemaps   |   Project-Equipment-Parts-Enquiry   |   供货商Supplier   |   Exchange Link   |   Breaking News  
Mail List

E-mail:

     上方导航  
       Homepage  
       Power Generation  
       Top Spare parts  
       spare parts  
       China OEM Equipment and Spare Parts  
       Project Financing   
       Equipments  
       China Small EPC Contractor  
       Transmission  
       Financing-Ebook  
       Contact Us  
       Used Equipment  
       download  
       sitemaps  
       Project-Equipment-Parts-Enquiry  
       供货商Supplier  
       Exchange Link  
       Breaking News  
     下方导航  

Diesel Generator Proposal

Power Plant Proposal
Required Information for Power Plant Project design and quotation

Home > HomePage > Project > New Project > Fluid Power Generation Industry - EPC quotation on hfo power plant project by 6 units of STX-MAN 18V3240 gensets

Buyer     Inquiry Basket     Supplier     Register


EPC quotation on hfo power plant project by 6 units of STX-MAN 18V3240 gensets


Industry:Fluid Power Generation Industry
Project Name:EPC quotation on hfo power plant project by 6 units of STX-MAN 18V3240 gensets
Main Equipment Brand:MAN
Main Equipment Model:18V3240
Origin of Product:
Project Progress:新项�?New Project
Project Country:
Project Capacity:
Summary Briefs
on the Project:
Project Role:
Bidding Or Negotiation:
Project Funding: 
Payment Terms:
Project Type:
Project Start And End Time: - 
Name Of Project Partners:
File Link:NO_File
 QUOTATION
    FOR 50MW MAN 18V3240 HFO POWER PLANT
No.ItemQtyUnitPrice (USD)Total�?/span>USD�?/span>Remark
1MAN   18V3240 8700KW/6.6KV/50HZ
    柴油发电机组
6set



Diesel   engine        
    MAN 18V3240 柴油�?/span>
6



Alternator                                                            发电�?/span>6



Common base frame                                        共同底座6



Flexible coupling                                                  联轴�?/span>6



Centralized console  集中控制�?/td>1



2Generator   accessories                                       机组附件
set



Lube   oil cooler                                                        滑油冷却�?Plate type)



Cooling module
Fresh water cooler                                                淡水冷却�?/span> (Plate type)



Lube oil filter                                                        滑油滤器



lube oil thermostatic valve                                   滑油温控阀/span>



HT water thermostatic valve                                水温控阀



Motor driven water pump                          电动低温水泵




Cooling radiator                          散热�?/td>




Air compressor (one is diesel start)                      空压�?/span>




Air bottle                                                              空气�?/span>




Silencer                                                              消音�?/span>




Expansion bellow                                                膨胀�?/span>




Expansion tank                                                   膨胀水箱




3Eectrical   system                                                   电气系统





Outgoing   panel                                                      出线�?/span>



KYN28A-12
Linkage panel for generating                                                       发电母线联络�?/span>



KYN28A-12
Station transformer panel                                     所��变柜



KYN28A-12
PT panel                                                                压变�?/span>



KYN28A-12
Plant transformer (2000kVA   6.6KV/0.69/0.4KV)               站用变压�?/span>



S11-M
400 Volt main panel                                           低压辅助总柜



GCS带双电源. GCS with Double Power
400 Volt supply panel for DG set   auxilliaries  低压辅助动力�?/span>



GCS
Gen-set auot Synchronous                                   自动同期系统




DC System                                                      直流系统




Air compressor control box                                空压机动力箱




Gen-set Aux. Control Panel                                   机组辅助控制�?/span>




4Water   Treatment unit                                           燃料处理设备




5HFO   Treatment unit                                           重油处理设备





HFO   purified separator module                            分离机单�?/span>



双机模块. Double Machine Module
Common Circulating & Booster module             供油单元




LO purifier separator                                                 滑油分离机单�?/span>




Exhaust gas boiler                                             锅炉




HFO unloading pump station                             重油卸油泵站




DO unloading pump station                               轻油卸油泵站




Sludge pump station                                       渣油泵站




6Spare   parts and special tools                                专用工具和随机备�?/span>
set


7Documents                                                           文件
set


8Mechanical   installation materials                           机械安装材料
set


9Electrical   installation materials                               电气安装材料
set


10SEA   COST 海运及保�?nbsp;   180USD/RT
LOT


11Lifting,   dock, warehouse and short haulage charges吊装,码头,仓库和短途运输费
LOT


12设计,指�?培训,安装�?安装工具,耗材
LOT



Sub-Amount                                                         小计




13HFO   tank: 2*600M3,4*200M3, 1*30M3,10m3
LOT


14DO   tank   200m3,  20m3 ,
LOT


15封闭式厂�?span style="">,基础.道路,土建,吊机,照明,消防,往��费用
LOT


16Site   leveling, piling, pool, water supply and drainage works, personnel   security场地平整,打桩,水�?/span>,给排水工程,人员安全保卫
LOT



Total    合计











Notes:






1. All prices base on   EWX as where as it.


2.The above quotation   is based on the current preliminary demand reference, and the owner needs to   provide detailed information such as the site geological survey report, local   conditions, and the power consumption of the factory, and commercial reqruirement   for final quotation confirmation.

2.Quality guaranty:   Provide full warranty within one year from the date of delivery or 2000   operating hours, whichever comes first.

3.Date of delivery: 12 months after receipt of advance payment.


4. Payment: 60 percent   advance payment, 40 percent  before   shipment.


5. Valid date for the   offer: 20 days.


6. The offer is for   equioment inside the power plant only. All civil work and fuel tanks should   be taken out by customer.

7. Installation guide and test:















LC_Guid:
Pubdate: 2023/11/13 16:43:40


Click add item to inquiry basket      Click Copy Shared LinksInquiry Basket

Pageviews: 1



Statement: Any reference to the OEM part number or other OEM information is for the purpose of identification only and does not imply that the part was manufactured by the Original Equipment Manufacturer.

All the brands and trademarks in the whole domain of the website belong to their own owners and does not mean that we are their authorized partner or dealer. All the information in this website is only for reference, we do not assure its accuracy.

This statement supersedes all other claims and statements on all pages, files, pics and information within this whole web domain.

Copyright©2006-2019 Leda Greenpower Beijing ICP Reg. No: 10010978.   Fax:0086-10-84161062  E-mail: [email protected]

JingGongWangAnBei: 11010802035914 Hao