Email: [email protected]   WhatsApp/WeChat: +0086-13801218512
  
Homepage   |   Power Generation   |   Top Spare parts   |   spare parts   |   China OEM Equipment and Spare Parts   |   Project Financing    |   Equipments   |   China Small EPC Contractor   |   Transmission   |   Financing-Ebook   |   Contact Us   |   Used Equipment   |   download   |   sitemaps   |   Project-Equipment-Parts-Enquiry   |   供货商Supplier   |   Exchange Link   |   Breaking News  
Mail List

E-mail:

     上方导航  
       Homepage  
       Power Generation  
       Top Spare parts  
       spare parts  
       China OEM Equipment and Spare Parts  
       Project Financing   
       Equipments  
       China Small EPC Contractor  
       Transmission  
       Financing-Ebook  
       Contact Us  
       Used Equipment  
       download  
       sitemaps  
       Project-Equipment-Parts-Enquiry  
       供货商Supplier  
       Exchange Link  
       Breaking News  
     下方导航  

Diesel Generator Proposal

Power Plant Proposal
Required Information for Power Plant Project design and quotation

Home > Equipment > Used or Surplus Equipment > Thomassen

Buyer     Inquiry Basket     Supplier     Register




- Thomassen PG 6561B Thomassen PG 6561B 20/3 2023
following power plant for sale from Germany. The object of sale includes the following main components on which the following work has been carried out: Frame 6 B gas turbine PG 6561B, LEC upgraded Thomassen, Serial No. 296867 converted in 2009 from Syngas to LEC natural gas combustion system GT transmission, BHSAD 66 USO Generator Alstom T 214-234 GT controller system (Mark V) Co2 fire extinguishing system of the gas turbine Heat recovery steam generator, standard boiler Duisburg 4x4 sygas-fired additional burner Main steam turbine, double extraction - contensation turbine ABB Turbine Nürnberg GmbH, type VEE 40 Boiler feed water pumps 1 and 2 Sulzer Pumps Germany Contensation steam turbine SST 060, Siemens Turbomachinery Cooling water pumps 1 and 2 and 3 KSB AG Dt., Cell cooling turbine 1 and 2, GEA Energietechnik GmbH Full desalination plant 2.9 sqm, Hager and Elsässer GmbH this also includes: Housing gas turbine generator set with filter house Gas turbine machine transformer 10/30 KV; 55 MVA, Pouwels Heat recovery steam generator with gas turbine - flue gas duct and chimney Machine house - steel structure, isopanels Steam turbine machine transformer 10/30 KV; 37.5 MVA both cell coolers Gas reducing station - without the building itself Double girder overhead traveling crane 25 to. and 6.3 tons, Elevator boiler house 500 ZPP, GEDA - During the conversion of the GUD to natural gas, the following work was carried out on the main units Gas turbine Hot gas path inspection Exchange of the 10 transition pieces Exchange of the 10 burners with Wueruündrphren Exchange of the guide u, blades of all 3 stages Installation of a LO Nox system Adaptation of the control to the new driving style (software change) Transmission revision Refilling the turbine oil In 2010 a 3-stage air filter was installed Gas turbine generator pull large revision with inductor Insulation measurements The conversion of the GT was carried out by Ansaldo Thomassen. Steam turbine open the turbine Bring runners to the factory, material tests, blasting, sheet metal, balancing Reseal parting joint Close withdrawals that are no longer required Realignment of the runner Renewal of sealing steam control New turbine control and adaptation to the steam turbine generator control system The same work was carried out on the generator as on the GT generator. The revision work was carried out by Turbomaschinen (TMS). Waste heat boiler The AHK received a water pressure test Comprehensive material tests were carried out All TÜV-relevant tests including the associated containers and pipelines The necessary documentation is available for all work carried out, from which further details can be found. All specialist companies involved in the general overhaul and technical renewal can confirm that the power plant complies with current technical requirements, including environmental requirements. Dismantling and rebuilding can be offered separately by us. The price is EUR as is where is. More details will follow on request with named end user country
Total: 1 Pages 1 Items, Now at 1 Page. First Previous Next End


Statement: Any reference to the OEM part number or other OEM information is for the purpose of identification only and does not imply that the part was manufactured by the Original Equipment Manufacturer.

All the brands and trademarks in the whole domain of the website belong to their own owners and does not mean that we are their authorized partner or dealer. All the information in this website is only for reference, we do not assure its accuracy.

This statement supersedes all other claims and statements on all pages, files, pics and information within this whole web domain.

Copyright©2006-2019 Leda Greenpower Beijing ICP Reg. No: 10010978.   Fax:0086-10-84161062  E-mail: [email protected]

JingGongWangAnBei: 11010802035914 Hao