Email: [email protected]   WhatsApp/WeChat: +0086-13801218512
  
Homepage   |   Power Generation   |   Top Spare parts   |   spare parts   |   China OEM Equipment and Spare Parts   |   Project Financing    |   Equipments   |   China Small EPC Contractor   |   Transmission   |   Financing-Ebook   |   Contact Us   |   Used Equipment   |   download   |   sitemaps   |   Project-Equipment-Parts-Enquiry   |   供货商Supplier   |   Exchange Link   |   Breaking News  
Mail List

E-mail:

     上方导航  
       Homepage  
       Power Generation  
       Top Spare parts  
       spare parts  
       China OEM Equipment and Spare Parts  
       Project Financing   
       Equipments  
       China Small EPC Contractor  
       Transmission  
       Financing-Ebook  
       Contact Us  
       Used Equipment  
       download  
       sitemaps  
       Project-Equipment-Parts-Enquiry  
       供货商Supplier  
       Exchange Link  
       Breaking News  
     下方导航  

Diesel Generator Proposal

Power Plant Proposal
Required Information for Power Plant Project design and quotation

Home > HomePage > Equipment > Used or Surplus Equipment > ge - A New Surplus GE Frame 6-FA Combined Cycle power plant, 225 MW, 50 Hz

Buyer     Inquiry Basket     Supplier     Register


A New Surplus GE Frame 6-FA Combined Cycle power plant, 225 MW, 50 Hz


Name of Used or Surplus Equipment/Project:A New Surplus GE Frame 6-FA Combined Cycle power plant, 225 MW, 50 Hz
Brand name of Equipment:GE
P/N of Equipment:6FA
Industry:Gas Power Generation Industry
Summary Briefs on the equipment:
Origin of Main Product:
Year of Production of Main Equipment:
Current Country located:
Original Packing:
Warranty:
Documents:
Dismantled or on site:
Can be Test Run or Not:
Year of Shutdown:
Year of Overhaul:
Total Operation Hours:
O&M log:
Current Condition:
Dismantling, packing transportation Serviece:
Refurbishment Services:
Site installation and commissioning or Supervision:
Role:
Already Sold or not:
Time of first Sold:
rough budget or contract value in USD:
Payment Terms:
File Link:NO_File

A New Surplus GE Frame 6-FA Combined Cycle power plant, 225 MW, 50 Hz, nat gas, 0 hours, manufactured in 2011.  

The powerplant was designed for local site conditions in India as a base load combined cycle with 225 MW nominal capacity constructed in a 1st phase and with intention to add an additional 133 MW as a 2nd phase expansion.

 

The 1st phase natural gas-fired plant described below has its equipment already 95% (by value) constructed. However, it has never been commissioned due to lack of availability of natural gas.  Construction stopped in 2017. All installed equipment is still 100% unused and uncommissioned.  The power plant remained uncompleted to this day due to inability of the state to provide the site with natural gas.

 

It is proposed that the plant be sold for dismantling and re-location.


Main Equipment Groups (ISBL)

The main equipment of the 1st phase construction comprises:

 

·       2      77 MWe GE F6FA+e gas turbine generators (Mark VI control)

·       2      Generators, 95 MVA

·       1      74 MW GE Steam Turbine

·       2      Dual pressure HRSG with deaerators and feed pumps

·       1      Air-cooled steam condenser (ACC) by GEA

·       1      Water purification/demineralizing plant

·       1      Incoming Fuel gas conditioning and metering skid

·       2     Gas turbine fuel gas conditioning and metering skids

 

 

Balance of Plant (ISBL)

The balance of plant (BoP) consists of, but is not limited to:

 

·       Switch yard with step-up transformers MV, HV for grid connection

·       Station transformers, MV, LV switchgear

·       Effluent treatment plant

·       Fin-Fan coolers (for lube-oil and alternator cooling)

·       HV, MV and

·       Distributed control system and UPS (uninterrupted power supply)

·       Fire water and CO2 fire-protection system (Agnice)

·       500 kW black-start diesel generator

·       Fuel Gas conditioning skid, oner per gas turbine

·       Compressed Air System (Atlas Copco)

·       Cooling water system

·       Hot stacks with diverters

·       Main cabling

·       Generator circuit breakers (GCB) ABB

·       Laboratory equipment

·       Steam piping and instrumentation (not fully connected)

·       Boiler feed-water pumps

·       Condensate pumps

·       2 x HRSG stacks

·       2 x hot-stacks (by-pass stacks) with diverters

·       1 (one) ACC air-cooled condenser and steam ejector vacuum system


Pubdate: 2022/11/24 9:45:56


Click add item to inquiry basket      Click Copy Shared LinksInquiry Basket

Pageviews: 1



Statement: Any reference to the OEM part number or other OEM information is for the purpose of identification only and does not imply that the part was manufactured by the Original Equipment Manufacturer.

All the brands and trademarks in the whole domain of the website belong to their own owners and does not mean that we are their authorized partner or dealer. All the information in this website is only for reference, we do not assure its accuracy.

This statement supersedes all other claims and statements on all pages, files, pics and information within this whole web domain.

Copyright©2006-2019 Leda Greenpower Beijing ICP Reg. No: 10010978.   Fax:0086-10-84161062  E-mail: [email protected]

JingGongWangAnBei: 11010802035914 Hao