Name of Used or Surplus Equipment/Project: | A New Surplus GE Frame 6-FA Combined Cycle power plant, 225 MW, 50 Hz, nat gas, 0 hours, manufactured in 2011 | Brand name of Equipment: | GE | P/N of Equipment: | 6FA | Industry: | Gas Power Generation Industry | Summary Briefs on the equipment: | | Origin of Main Product: | | Year of Production of Main Equipment: | | Current Country located: | | Original Packing: | | Warranty: | | Documents: | | Dismantled or on site: | | Can be Test Run or Not: | | Year of Shutdown: | | Year of Overhaul: | | Total Operation Hours: | | O&M log: | | Current Condition: | | Dismantling, packing transportation Serviece: | | Refurbishment Services: | | Site installation and commissioning or Supervision: | | Role: | | Already Sold or not: | | Time of first Sold: | | rough budget or contract value in USD: | | Payment Terms: | | File Link: | NO_File |
A New Surplus GE Frame 6-FA Combined Cycle power plant, 225 MW, 50 Hz, nat gas, 0 hours, manufactured in 2011. The powerplant was designed for local site conditions in India as a base load combined cycle with 225 MW nominal capacity constructed in a 1st phase and with intention to add an additional 133 MW as a 2nd phase expansion. The 1st phase natural gas-fired plant described below has its equipment already 95% (by value) constructed. However, it has never been commissioned due to lack of availability of natural gas. Construction stopped in 2017. All installed equipment is still 100% unused and uncommissioned. The power plant remained uncompleted to this day due to inability of the state to provide the site with natural gas. It is proposed that the plant be sold for dismantling and re-location.
Main Equipment Groups (ISBL) The main equipment of the 1st phase construction comprises: · 2 77 MWe GE F6FA+e gas turbine generators (Mark VI control) · 2 Generators, 95 MVA · 1 74 MW GE Steam Turbine · 2 Dual pressure HRSG with deaerators and feed pumps · 1 Air-cooled steam condenser (ACC) by GEA · 1 Water purification/demineralizing plant · 1 Incoming Fuel gas conditioning and metering skid · 2 Gas turbine fuel gas conditioning and metering skids Balance of Plant (ISBL) The balance of plant (BoP) consists of, but is not limited to: · Switch yard with step-up transformers MV, HV for grid connection · Station transformers, MV, LV switchgear · Effluent treatment plant · Fin-Fan coolers (for lube-oil and alternator cooling) · HV, MV and · Distributed control system and UPS (uninterrupted power supply) · Fire water and CO2 fire-protection system (Agnice) · 500 kW black-start diesel generator · Fuel Gas conditioning skid, oner per gas turbine · Compressed Air System (Atlas Copco) · Cooling water system · Hot stacks with diverters · Main cabling · Generator circuit breakers (GCB) ABB · Laboratory equipment · Steam piping and instrumentation (not fully connected) · Boiler feed-water pumps · Condensate pumps · 2 x HRSG stacks · 2 x hot-stacks (by-pass stacks) with diverters · 1 (one) ACC air-cooled condenser and steam ejector vacuum system
|