Email: [email protected]   WhatsApp/WeChat: +0086-13801218512
  
Homepage   |   Power Generation   |   Top Spare parts   |   spare parts   |   China OEM Equipment and Spare Parts   |   Project Financing    |   Equipments   |   China Small EPC Contractor   |   Transmission   |   Financing-Ebook   |   Contact Us   |   Used Equipment   |   download   |   sitemaps   |   Project-Equipment-Parts-Enquiry   |   供货商Supplier   |   Exchange Link   |   Breaking News  
Mail List

E-mail:

     上方导航  
       Homepage  
       Power Generation  
       Top Spare parts  
       spare parts  
       China OEM Equipment and Spare Parts  
       Project Financing   
       Equipments  
       China Small EPC Contractor  
       Transmission  
       Financing-Ebook  
       Contact Us  
       Used Equipment  
       download  
       sitemaps  
       Project-Equipment-Parts-Enquiry  
       供货商Supplier  
       Exchange Link  
       Breaking News  
     下方导航  

Diesel Generator Proposal

Power Plant Proposal
Required Information for Power Plant Project design and quotation

Home > HomePage > Equipment > Used or Surplus Equipment > Toshiba - new 215MW Toshiba Steam Turbine/Generator (STG) for sale

Buyer     Inquiry Basket     Supplier     Register


new 215MW Toshiba Steam Turbine/Generator (STG) for sale


Name of Used or Surplus Equipment/Project:new 215MW Toshiba Steam Turbine/Generator (STG) for sale
Brand name of Equipment:Toshiba
P/N of Equipment:Toshiba
Industry:Solid Fuel Power Generation Industry
Summary Briefs on the equipment:
Origin of Main Product:
Year of Production of Main Equipment:
Current Country located:
Original Packing:
Warranty:
Documents:
Dismantled or on site:
Can be Test Run or Not:
Year of Shutdown:
Year of Overhaul:
Total Operation Hours:
O&M log:
Current Condition:
Dismantling, packing transportation Serviece:
Refurbishment Services:
Site installation and commissioning or Supervision:
Role:
Already Sold or not:
Time of first Sold:
rough budget or contract value in USD:
Payment Terms:
File Link:Toshiba Steam Turbine.pdf

We have a brand t that can be fitted with a gas fired boiler to create steam energy required to run the STG.


You would need to purchase a boiler locally. 


It is BRAND NEW and ALL PLANS, PARTS ETC. COME WITH IT. EXCELLENT CONDITION �?NEVER USED.


AVAILABLE TO SHIP IMMEDIATELY EX TASMANIA, AUSTRALIA.


EVERYTHING IS PRICED TO SELL QUICKLY AT USD $ + SHIPPING AND DE-WAREHOUSING [AT BUYERS COST estimated at USD $]

Brand - Toshiba

Current Location �?Bell Bay Wharf Storage Shed, Bell Bay, Tasmania, Australia (easy to load direct onto ship once removed from the warehouse, but will require a Heavy Lift specialist)

Condition �?Brand New, Never Used, Fully maintained in storage by an engineer, all Toshiba monitoring reports are available, since it has been in storage.


TOSHIBA DUAL FUEL INLET STEAM TURBO/GENERATOR 

TURBINE

WEIGHT

CONDENSER 

 

 

• 250 MVA, Air to Water Cooled, 18 kV, 8019 A, 50 Hz, 3000 rpm

 

 

 

 

Specification:

• Extraction & condensing. Inlet pressure: 104 bar. Output: 215MW

Extractions:

• MP2: 22 bar, MP1:10 bar, LP: 4.5 bar, Feed Water:

0.4 bar Minimum load:

• No extractions, Only bleeds, Steam flow: 45 kg/s

Maximum load:

• Steam flow: 270 kg/s

• Total weight 〜2,800 Freight ton

• Total items: 74 Heavy Lifts:

• Condenser Top Cover: 2 x 15 ton

• Condenser: 2 x 85 ton

• Turbine: 268 ton

• Average: 17 ^C, Min: 15 ^C. Max: 25 2C

FREIGHT

• Delivered 2009, currently stored indoors and secured. Turbine & Generator completely sealed, silica gel is inserted in the Turbine & Generator and regularly replaced. Equipped with electronic monitoring sensors for humidity & temperature with criteria from Toshiba for storage, monitoring report generated monthly, inspection of unit every (2) weeks, thorough Inspections were done every (6) months until 2012, then yearly, inspection protocols available.

• Total weight:~2,800 Freight ton

• Total items: 74 Weight:

• Condenser Top Cover: 2 x 15 ton

• Condenser: 2 x 85 ton

• Turbine: 268 ton

• Generator: 277 ton

• Misc: 50 ton

• Total: 795 ton Remaining:

• Misc: 2,800 - 795 = ~ 2,000 m3 wooden boxes

STORAGE CONDITIONS

 

This turbine is a single flow extraction condensing type. Steam initially enters the steam inlet flange near the end of the high- pressure section and flows through the turbine stages toward the generator end of the unit. After passing through the turbine stages, the steam is exhausted to condenser. The exhaust hood is keyed to the foundation

 

plates at a point near its center of the exhaust hood to prevent axial motion. The turbine expands axially from this point. The front standard is free to slide axially but the

standard and hood are guided to prevent transverse movement.

CONTROL VALVE (CV) OF MAIN STEAM

Steam, after passing through the MSV, is admitted through the CV to the high-pressure turbine. CV controls the amount of steam passing to the turbine. It is opened and closed by an actuator and is controlled by a Digital Electro-Hydraulic Control (D-EHC) system through the turbine hydraulic system.

TECHNICAL SPECIFICATION OF STEAM TURBINE &AUX TYPE

• Single Casing Single Flow impulse type

• condensing turbine

• Rated Output: 188,000 kW at Generator terminal

• Speed: 3,000 rpm

• Rotation: CCW (Viewed from front of Turbine)

• Last Stage Bucket Active Length: 42M (Nominal)

• Allowable Cycle Change: 48,5 - 50,5 Hz

CONDENSATE SYSTEM TYPE

Horizontal Surface

Cooling, with divided waterbox, Two-Pass Type

GENERATOR

The generator consists of the stator, rotor, cover, bearing, air-to- water cooler. The stationary armature is attached to and supported by generator base. The rotor is supported by the bearings. Air-to- water coolers are mounted above the stator. The cooling system is completely enclosed to prevent entrance of dust and moisture.

EXTRACTION SYSTEM

 

The brush less generating system consists of main generator, rotating AC Exciter, Rotating Rectifier (R-RF), Direct Coupled PM6 (Permanent Magnetic Generator) and AVR (Automatic Voltage Regulator). Main components of the AVR are the digital automatic controller, AVR Amplifier, three phase thyristor rectifier and U-ISO Isolation Unit.

To the attached.

Pubdate: 2022/11/23 10:30:32


Click add item to inquiry basket      Click Copy Shared LinksInquiry Basket

Pageviews: 3



Statement: Any reference to the OEM part number or other OEM information is for the purpose of identification only and does not imply that the part was manufactured by the Original Equipment Manufacturer.

All the brands and trademarks in the whole domain of the website belong to their own owners and does not mean that we are their authorized partner or dealer. All the information in this website is only for reference, we do not assure its accuracy.

This statement supersedes all other claims and statements on all pages, files, pics and information within this whole web domain.

Copyright©2006-2019 Leda Greenpower Beijing ICP Reg. No: 10010978.   Fax:0086-10-84161062  E-mail: [email protected]

JingGongWangAnBei: 11010802035914 Hao