Name of Used or Surplus Equipment/Project: | 12 MW complete power plant (used, 2008 Make) | Brand name of Equipment: | Triveni | P/N of Equipment: | 12mw | Industry: | Solid Fuel Power Generation Industry | Summary Briefs on the equipment: | | Origin of Main Product: | | Year of Production of Main Equipment: | | Current Country located: | | Original Packing: | | Warranty: | | Documents: | | Dismantled or on site: | | Can be Test Run or Not: | | Year of Shutdown: | | Year of Overhaul: | | Total Operation Hours: | | O&M log: | | Current Condition: | | Dismantling, packing transportation Serviece: | | Refurbishment Services: | | Site installation and commissioning or Supervision: | | Role: | | Already Sold or not: | | Time of first Sold: | | rough budget or contract value in USD: | | Payment Terms: | | File Link: | NO_File |
Please find enclosed our preliminar offer for 12 MW complete power plant (used, 2008 Make) If there is interest in this Offer, we will submit Firm offer with more details. As we have yet to Inspect the Plant physically, we have taken the approximate cost of the Repair and refurbishment. So there could be slight variance in final price Let them Provide us a Plot plan of the Plant showing the area available for the Power plant. This power plant is provided with Air Cooled Condenser, so no need for Cooling tower and no need for cooling water. This will be a very good deal for them as the plant can be commissioned very quickly and the price is too less compared with a .new Plant cost Please note that we are offering FOB price. so shipping and insurance will to the customer account.. The Plant will can be shipped in 80 to 90 nos 40 Feet Open top Containers Hope to get positive response from the customer. 1. Preliminary proposal for 12 MW power plant on turnkey basis Entire project will be offered on turnkey basis, consisting of following:
Boiler with auxiliaries | Make: Cethar Vessels Ltd. (AFBC Boiler) |
|
| Boiler Capacity: 60 TPH |
|
|
| Working Pressure: 66 kg/cm2 |
|
|
| Superheated steam temperature: 510 Degree Centigrade |
|
|
| Coal Handling | Plant | with | Conveyor Belt: BC-1, BC-2, BC-3, BC-4 and complete structure | auxiliaries |
|
|
| Primary Crusher |
|
|
| Secondary Crusher |
|
|
| Ash Handling | Plant | with | Complete Auxiliary with ladders. | auxiliaries |
|
|
| Turbine with | Alternator | (with | Turbine Capacity: 12MW | auxiliaries) | Make: Triveni |
|
| Alternator make: TDPS |
|
|
| Air cooled | condenser | with | Total fans: 4 Cell | auxiliaries |
|
|
| Coal Bunkers | Size: 300 m3 |
|
| Steel chimney (New) | 60 Meters High |
|
| EOT crane and Auxiliaries | LOT |
|
| MCC panel | LOT |
|
| PLC Panels | LOT |
|
| Cables | LOT |
|
|
2. SCOPE OF WORK Supply of entire power plant as available at site Inspection and testing of the plant and identifying any need for repair and refurbishment Dismantling of complete boiler with all auxiliaries. Coal handling plant, ash handling plant, turbine generator and auxiliaries, electrical panels, air cooled condenser, EOT Crane Repair and refurbishment of the existing used plant where necessary, Sand blasting and painting where necessary Design engineering, manufacturing, and supply of new steel stack (60 meters) Seaworthy Packing and forwarding Local Transport to Navasheva port, Mumbai Design, engineering, and drawings for civil foundations for turbine, boiler, coal handling plant, ash handling plant, turbine Deck, turbine Hall, control room building, plant layout drawings, cable routing and layout, and electrical single line diagrams Supervision of civil foundations works Supervision of erection of mechanical equipment, E&I works Commissioning and performance testing supervision 3. CUSTOMER SCOPE Following facilities shall be provided by customer for free of cost: Receipt, unloading, stacking and safe custody and storage of material and equipment (covered storage for Instruments and electrical panels, motors etc.) All civil works in foundations, sheds, buildings, control rooms etc. All erection works (mechanical, electrical, instrumentation) with lifting equipment, cranes, tools and tackles, skilled /unskilled labor under supervision of Supplier Water and electrical power at site Temporary office for suppliers, engineers, manager/ skilled personnel Suppliers�?personnel shall be provided with VISAS, Travel from India to Lebanon and back, local transport, food, and accommodation. Ward & watch of the material at site. The local approval from any statutory authority 4 Power supply for normal lighting, grinding, drilling, welding machines etc. Drinking water for site team Storage space at powerhouse location for storage of tools
|