Name of Used or Surplus Equipment/Project: | Wartsila 58 MW Power Plant Equipment with 6 x 20V34SG Gas Generators - 2011 | Brand name of Equipment: | Wartsila | P/N of Equipment: | 20V34SG | Industry: | Gas Power Generation Industry | Summary Briefs on the equipment: | | Origin of Main Product: | | Year of Production of Main Equipment: | | Current Country located: | | Original Packing: | | Warranty: | | Documents: | | Dismantled or on site: | | Can be Test Run or Not: | | Year of Shutdown: | | Year of Overhaul: | | Total Operation Hours: | | O&M log: | | Current Condition: | | Dismantling, packing transportation Serviece: | | Refurbishment Services: | | Site installation and commissioning or Supervision: | | Role: | | Already Sold or not: | | Time of first Sold: | | rough budget or contract value in USD: | | Payment Terms: | | File Link: | NO_File |
Wartsila 58 MW Power Plant Equipment with 6 x 20V34SG Gas Generators - 2011022 Recently dismantled equipment from power plant with 6 units of Wartsila 20V34SG spark ignited natural gas engine driven generators. The main equipment was delivered and commissioned by Wartsila in year 2011 and before dismantling they have accumulated 22000 �?24000 total operating hours. Scheduled 24000 hour service was made to each engine by Wartsila Service before dismantling. Delivery includes complete technology from gas infeed to 11 kV vacuum breakers, 4 pcs of 18 bar exhaust gas steam boilers, dismantled cables and new Wartsila delivered commissioning parts, All professionally dismantled. Technical characteristic of this power plant when it was installed and in operation: Generators are installed on common base frame with the engines and common base frame is isolated from the foundation by flexible mounting with steel springs. Most of the auxiliaries are in the factory built in large new type modules which enable easy relocation of the equipment. The engines are of the four stroke, lean burn, pre chamber, spark ignited, port injected, trunk piston, turbocharged and intercooled design. The engine automation is a complete embedded management system, integrated with an engine control system for electricity controlled fuel injection. The control system is distributed bus based system where monitoring and control function is placed close to measuring and control point. This leads to less wiring and improved performance. The engines are designed for continuous operation in gas mode in island mode at any load between 40 -100% of nominal power Offer price EUR Net Delivery term EXW Europe, dismantled Payment term 100% before pick up Availability Immediately available Other terms Will be sold as-is condition Validity 30 days, subject to prior sale without notice Main technical data at full load and past site conditions: Installed power 58 380 kW at 11 kV, 50 Hz Steam production (100% load) 4 x 3730 kW / 18 bar / 360C Fuel Natural gas (cons. 13200 m3/h at full load) Engines 6 x W20V34SG, running at 750 rpm Alternators 6 x AKV 12 162 kVA, 11 kV, 50 Hz, p.f. 0.8 Year of manufacturing 2011 Operating hours 22000 �?24000 hours /unit Last scheduled service 24000 hour service by Wartsila DONE Original heat rate (at alt.) 8188 kJ/kWhe (44.0 %) Plant own consumption 1300 kW Cooling system Closed loop radiators Status Dismantled and stored in a warehouse
|