Name of New Equipment: | 2mw hfo diesel generator set | Brand name of Equipment: | ZiChai | P/N of Equipment: | 8N260ZLD-1 | Industry: | | Summary Briefs on the equipment: | | Origin of Product: | | Original Packing: | | Warranty: | | Installation, commissioning service: | | Role: | | Already Sold or not: | | Time of first Sold: | | Already sold coutry or region: | | Rough budget or contract value: | 货币选择 | Payment Terms: | | File Link: | NO_File |
Here is the 2MW HFO genset: 淄柴2MW陆用重油发电机组项目 1. 报价Quotation 描述Description | 单位 Unit | 数量 Quan. |
|
| 1 | 2MW陆用重油发电机组 2MW Land HFO Diesel Genset 50Hz, 400V | 台套/set | 1 |
|
| 匹配发电单机型号: 8N260ZLD-1 Matched with diesel engine 2147kW, 750rpm | 2 | 调整螺栓+垫铁+排气膨胀�?/p> Adjusting bolt+Plate+Expansion joint | 台套/set | 1 |
|
| 3 | 低压出线总柜 Low voltage cabinet | �?set | 1 |
|
| 4 | 站内配电�?/p> Distribution cabinet | �?set | 1 |
|
| 5 | 重油处理设备 HFO treatment equipment (含导热油锅炉�重油处理单元、滑油处理单元�燃油增压单元�?/p> (Including heat conduction oil boiler, HFO unit, Lub oil unit, diesel oil supercharged unit) | �?set | 1整套/ whole set |
|
| Total price(EXW Zibo) USD | 以上报价为EXW淄博价,工厂标准配置,不含设计费、地基�运费、油罐�油柜、冷却塔以及安装管材与线缆� About quotation is for EXWZibo Price, manufactured as factory standard, not including fees of designing, foundation, transportation, oil tanker, oil cabinet, cooling tower and assemble materials. |
2. 供货范围supply scope�?/span> 序号 No. | 名称 Name | 数量 Quan. | 备注 Remarks | 1 | 柴油�?/span> Diesel engine | 1set | 8N260ZLD-1 | 2 | 发电�?/span> Generator | 1set | 工厂标准Factory standard | 3 | 公共底座 Common base | 1set | 工厂标准Factory standard | 4 | 低压开���?/span> Low voltage cabinet | 1set | 工厂标准Factory standard | 5 | 附件 Accessories | 1set | 工厂标准Factory standard | 6 | 备件 Spare parts | 1set | 工厂标准Factory standard | 7 | 工具 Tools | 1set | 工厂标准Factory standard | 8 | 导热油锅�?/span> Heat conduction oil boiler | 1set | 重油处理设备系统 HFO treatment equipment | 9 | 燃油增压单元 Diesel oil supercharged unit | 1set | 10 | 重油分离机单�?/span> Heavy oil separator unit | 1set | 11 | 滑油分离机单�?/span> Lub. oil separator unit | 1set | 12 | 随机工具 Tools | 1set | 13 | 随机备件 Spare parts | 1set | 14 | 低压出线总柜 Low voltage cabinet | 1set | 数量需��根据电站装机容量决定 The quantity shall be determined by the power plant installed capacity | 15 | 站内配电�?/span> Distribution cabinet | 1set | 数量需��根据电站装机容量决定 The quantity shall be determined by the power plant installed capacity |
说明Remarks: 1.本报价范围详�?�?�?/span> The quotation supply scope, please see the 1&2. 2. 付款方式:T/T支付30%合同金额作为定金,合同生效;余款于发货前付清�?/p> Payment manners: pay 30% contract valve as down payment by T/T, then the contract comes into effect. The left shall be paid before delivery by T/T. 3. 供货�? 4个月 Supply period: 4 months 4. 机组的质保期与服�? Genset guarantee period and service: A. 质保期:在遵守使用说明书所��的安装�调试、使用维护保养条件下,出厂之日起12个月内或累计运行2000个小�? 以先到�为准;因制�质量影响主要性能指标,发生故障零件损坏,由乙方负责�三包”处理� Guarantee period: Under the condition that the operation and maintenance rules given in this manual are observed by the user, the guarantee period is within 12 months from the day on which the engine left the factory or within 2000 hours of operation after the engine was put into service, according to the first coming. If the genset broken down because of the bad manufacture quality, Party B shall undertake the guarantee. B. 服务:我方可派服务工程师到项目现场去进行合同所��定项目的指导安装调试。用户需要承担工程师的签证费用,往��机票,当地食宿,交�,医疗以及日薪USD/天� Service: Party B could arrange the service engineer to the project site to guide the installation and commissioning of the project specified in the contract. Users should bear the engineer's visa fee, round-trip air tickets, local accommodation, transportation, medical treatment and daily salary of USD per day 5. 未尽事宜,另行协�?/span> Matters not covered herein shall be negotiated separately
|