Email: [email protected]   WhatsApp/WeChat: +0086-13801218512
  
Homepage   |   Power Generation   |   Top Spare parts   |   spare parts   |   China OEM Equipment and Spare Parts   |   Project Financing    |   Equipments   |   China Small EPC Contractor   |   Transmission   |   Financing-Ebook   |   Contact Us   |   Used Equipment   |   download   |   sitemaps   |   Project-Equipment-Parts-Enquiry   |   供货商Supplier   |   Exchange Link   |   Breaking News  
Mail List

E-mail:

     上方导航  
       Homepage  
       Power Generation  
       Top Spare parts  
       spare parts  
       China OEM Equipment and Spare Parts  
       Project Financing   
       Equipments  
       China Small EPC Contractor  
       Transmission  
       Financing-Ebook  
       Contact Us  
       Used Equipment  
       download  
       sitemaps  
       Project-Equipment-Parts-Enquiry  
       供货商Supplier  
       Exchange Link  
       Breaking News  
     下方导航  

Diesel Generator Proposal

Power Plant Proposal
Required Information for Power Plant Project design and quotation

Home > HomePage > Equipment > New Equipment > ZiChai - 2mw hfo diesel generator set ZiChai 8N260ZLD-1

Buyer     Inquiry Basket     Supplier     Register


2mw hfo diesel generator set ZiChai 8N260ZLD-1


Name of New Equipment:2mw hfo diesel generator set
Brand name of Equipment:ZiChai
P/N of Equipment:8N260ZLD-1
Industry:
Summary Briefs on the equipment:
Origin of Product:
Original Packing:
Warranty:
Installation, commissioning service:
Role:
Already Sold or not:
Time of first Sold:
Already sold coutry or region:
Rough budget or contract value:  货币选择
Payment Terms:
File Link:NO_File

Here is the 2MW HFO genset:

淄柴2MW陆用重油发电机组项目

 

1.  报价Quotation

描述Description

单位

Unit

数量

Quan.



1

2MW陆用重油发电机组

2MW Land HFO Diesel Genset

50Hz, 400V

台套/set

   1



匹配发电单机型号: 8N260ZLD-1

Matched with diesel engine

2147kW,   750rpm

2

调整螺栓+垫铁+排气膨胀�?/p>

Adjusting   bolt+Plate+Expansion joint

台套/set

1



3

低压出线总柜

Low voltage   cabinet

�?set

1



4

站内配电�?/p>

Distribution   cabinet

�?set

1



5

重油处理设备

HFO treatment equipment

(含导热油锅炉�重油处理单元、滑油处理单元�燃油增压单元�?/p>

(Including heat conduction oil boiler, HFO unit, Lub oil unit,   diesel oil supercharged unit)

�?set

1整套/ whole set



Total price(EXW Zibo)

USD

以上报价为EXW淄博价,工厂标准配置,不含设计费、地基�运费、油罐�油柜、冷却塔以及安装管材与线缆�

About quotation is for EXWZibo Price, manufactured as factory   standard, not including fees of designing, foundation, transportation, oil   tanker, oil cabinet, cooling tower and assemble materials.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2. 供货范围supply scope�?/span>

 

序号

No.

名称

Name

数量

Quan.

备注

Remarks

1

柴油�?/span>

Diesel   engine

1set

8N260ZLD-1

2

发电�?/span>

Generator

1set

工厂标准Factory   standard

3

公共底座

Common   base

1set

工厂标准Factory standard

4

低压开���?/span>

Low   voltage cabinet

1set

工厂标准Factory standard

5

附件

Accessories

1set

工厂标准Factory standard

6

备件

Spare   parts

1set

工厂标准Factory standard

7

工具

Tools

1set

工厂标准Factory standard

8

导热油锅�?/span>

Heat conduction oil boiler

1set  

重油处理设备系统

HFO   treatment equipment

9

燃油增压单元

Diesel oil supercharged unit

1set

10

重油分离机单�?/span>

Heavy oil separator unit

1set

11

滑油分离机单�?/span>

Lub. oil separator unit

1set

12

随机工具

Tools

1set

13

随机备件

Spare   parts

1set

14

低压出线总柜

Low   voltage cabinet

1set

数量需��根据电站装机容量决定

The quantity shall be determined by the power plant installed   capacity

15

站内配电�?/span>

Distribution cabinet

1set

数量需��根据电站装机容量决定

The quantity shall be determined by the power plant installed   capacity

 

说明Remarks:

1.本报价范围详�?�?�?/span>

  The quotation supply scope, please see the 1&2.

2. 付款方式:T/T支付30%合同金额作为定金,合同生效;余款于发货前付清�?/p>

  Payment manners: pay 30% contract valve as down payment by T/T, then the contract comes into effect. The left shall be paid before delivery by T/T.

3. 供货�?  4个月

   Supply period: 4 months

4. 机组的质保期与服�?

   Genset guarantee period and service:

A. 质保期:在遵守使用说明书所��的安装�调试、使用维护保养条件下,出厂之日起12个月内或累计运行2000个小�? 以先到�为准;因制�质量影响主要性能指标,发生故障零件损坏,由乙方负责�三包”处理�

Guarantee period: Under the condition that the operation and maintenance rules given in this manual are observed by the user, the guarantee period is within 12 months from the day on which the engine left the factory or within 2000 hours of operation after the engine was put into service, according to the first coming. If the genset broken down because of the bad manufacture quality, Party B shall undertake the guarantee.

B. 服务:我方可派服务工程师到项目现场去进行合同所��定项目的指导安装调试。用户需要承担工程师的签证费用,往��机票,当地食宿,交�,医疗以及日薪USD/天�

Service: Party B could arrange the service engineer to the project site to guide the installation and commissioning of the project specified in the contract. Users should bear the engineer's visa fee, round-trip air tickets, local accommodation, transportation, medical treatment and daily salary of USD per day

5. 未尽事宜,另行协�?/span>

Matters not covered herein shall be negotiated separately


Pubdate: 2022/7/6 11:10:18


Click add item to inquiry basket      Click Copy Shared LinksInquiry Basket

Pageviews: 2



Statement: Any reference to the OEM part number or other OEM information is for the purpose of identification only and does not imply that the part was manufactured by the Original Equipment Manufacturer.

All the brands and trademarks in the whole domain of the website belong to their own owners and does not mean that we are their authorized partner or dealer. All the information in this website is only for reference, we do not assure its accuracy.

This statement supersedes all other claims and statements on all pages, files, pics and information within this whole web domain.

Copyright©2006-2019 Leda Greenpower Beijing ICP Reg. No: 10010978.   Fax:0086-10-84161062  E-mail: [email protected]

JingGongAnBeiAn 11010802035914 Hao