Email: [email protected]   WhatsApp/WeChat: +0086-13801218512
  
Homepage   |   Power Generation   |   Top Spare parts   |   spare parts   |   China OEM Equipment and Spare Parts   |   Project Financing    |   Equipments   |   China Small EPC Contractor   |   Transmission   |   Financing-Ebook   |   Contact Us   |   Used Equipment   |   download   |   sitemaps   |   Project-Equipment-Parts-Enquiry   |   供货商Supplier   |   Exchange Link   |   Breaking News  
Mail List

E-mail:

     上方导航  
       Homepage  
       Power Generation  
       Top Spare parts  
       spare parts  
       China OEM Equipment and Spare Parts  
       Project Financing   
       Equipments  
       China Small EPC Contractor  
       Transmission  
       Financing-Ebook  
       Contact Us  
       Used Equipment  
       download  
       sitemaps  
       Project-Equipment-Parts-Enquiry  
       供货商Supplier  
       Exchange Link  
       Breaking News  
     下方导航  

Diesel Generator Proposal

Power Plant Proposal
Required Information for Power Plant Project design and quotation

Home > HomePage > Equipment > Used or Surplus Equipment > MAN B&W - 6 units of MAN 10L3244 Surplus new HFO power plant with capacity of each 5400kw MAN B&W 10L3244

Buyer     Inquiry Basket     Supplier     Register


6 units of MAN 10L3244 Surplus new HFO power plant with capacity of each 5400kw MAN B&W 10L3244


Name of Used or Surplus Equipment/Project:ect:6 units of MAN 10L3244 Surplus new HFO power plant with capacity of each 5400kw
Brand name of Equipment:MAN B&W
P/N of Equipment:10L3244
Industry:Fluid Power Genration Industry
Summary Briefs on the equipment:6 units of MAN 10L3244 Surplus new HFO power plant with capacity of each 5400kw. 30mw hfo电站采用6台MAN 10L3244发电机组 5400kw �?2.4MW 很��? 2011年库存全新机�?保养(6个月)�?提供使用.品质优秀. 见附资料
Origin of Main Product:
Year of Production of Main Equipment:2011
Current Country located:中国 China
Original Packing:
Warranty:
Documents:
Dismantled or on site:
Can be Test Run or Not:
Year of Shutdown:
Year of Overhaul:
Total Operation Hours:0 hours
O&M log:
Current Condition:
Dismantling, packing transportation Serviece:
Refurbishment Services:
Site installation and commissioning or Supervision:
Role:
Already Sold or not:
Time of first Sold:
rough budget or contract value in USD:
Payment Terms:T/T
File Link:6sets 5.4MW 30MW HFO Power Plant Proposal.docx


6sets 5.4MW 30MW HFO Power Plant Proposal.docx
Quotation   - HFO Power plant 6x5.4MW
No.system unit Name Specification 
Qty Amount 
1Generator   set
    发电机组部分
Engine 发动�?In 2011year, stock units 2011年库�?
   
Brand�?/span> MAN 
    Model
�?/span>10L3244 5600kw   750R

6
发电�?
    Alternator 
Brand�?/span> ABB/TFC  
    Specs: 5400kW 750R 50Hz 11kV
Air   intake filter
    空气进气滤清


6










2电气和外围系�?/span>
    Electric and other system 
Central Operating System
    集中操作系统
Including parallel machine device 含并�?/span>
1
Diesel   Engine local control panel
    柴油机就地控制屏


6
Generator   Circuit Breaker Panel (GB)发电机开关屏KYN28-24, 630A, 25KA
6
DC System Control Panel (DCC)
   
直流控制�?/span>
    Accumulator Battery Panel
   
蓄电池屏


1
Cooling water Radiator 冷却水散热器

6
Silencer Expansion   Bellows
   
膨胀�?/span>,消音�?/span>


6
LUBE OIL AUTO BACKWASH   FILTER,PRE HEATER,润滑油自动反冲洗过滤器�预热�?/span>
   
     


6
3燃油系统
    Diesel / oil unit 
NOZZLE COOLING UNIT喷嘴冷却装置

3
PLATE-TYPE LUBE OIL COOLER板式润滑油冷却器

6
重油供应单元HFO supply unitGEA
4
重油分离单元HFO separation unitGEA
4
废气锅炉exhaust gas boilerVendor:   AALBORG 
3
滑油分离�?br/>     Oil treatment seperator unit 

6
4附件
    Accessories
Starting Air Receiver Unit
    启动空气�?/td>
500l 30bar
2
Starting   Air Compressor Unit
   
启动空气压缩机单�?/span>
37m3/h,30bar
2
6
Standard Spare Parts
   
标准备件,Tool
   
工具,file文件


2
7
Station Service Transformer
    厂用电变压器 and Station service transformer    Panel 
    厂用电变压器�?/td>


1
8Total Amount( Usd) FOB ( Shanghai Seaport )

ob











Notes:






1. All   prices base on FOB  SHANGHAI PORT


2.Quality guaranty: Provide full   warranty within one year from the date of delivery or 2000 operating hours, whichever   comes first.

3.Date of delivery: 6 --9months after   receipt of advance payment.


4. Payment:   50 percent advance payment, 50 percent Irrevocable, first class international   bank letter of credit.


5. Valid   date for the offer: before . 30-07-2022


6. The   offer is for equioment inside the power plant only. All civil work and fuel   tanks should be taken out by customer. 

7. Installation guide and   test:                                         





a.USD 2500 salary per   day for one engineer (total 2-4 persons) during installation supervision and   test (about 2 months).

b.USD 2500 salary per   day for one engineer (total 2 -4persons) during training and running (about 2   month).

c.The costs for   traveling between China and customer, lodging and food shall be borne by   customer.

d.The   insurance for epidemic prevention medical treatment in the local country   shall be borne by the Buyer,

and the   insurance for epidemic prevention medical treatment in China shall be borne   by the Seller









Pubdate: 2022/6/9 18:51:56


Click add item to inquiry basket      Click Copy Shared LinksInquiry Basket

Pageviews: 15



Statement: Any reference to the OEM part number or other OEM information is for the purpose of identification only and does not imply that the part was manufactured by the Original Equipment Manufacturer.

All the brands and trademarks in the whole domain of the website belong to their own owners and does not mean that we are their authorized partner or dealer. All the information in this website is only for reference, we do not assure its accuracy.

This statement supersedes all other claims and statements on all pages, files, pics and information within this whole web domain.

Copyright©2006-2019 Leda Greenpower Beijing ICP Reg. No: 10010978.   Fax:0086-10-84161062  E-mail: [email protected]

JingGongAnBeiAn 11010802035914 Hao