Quotation - HFO Power plant 6x5.4MW |
No. | system unit | Name | Specification |
| Qty | Amount |
1 | Generator set 发电机组部分 | Engine 发动�?In 2011year, stock units 2011年库�? | Brand�?/span> MAN Model�?/span>10L3244 5600kw 750R |
| 6 |
|
发电�? Alternator | Brand�?/span> ABB/TFC Specs: 5400kW 750R 50Hz 11kV |
Air intake filter 空气进气滤清 |
|
| 6 |
|
|
|
|
|
|
|
|
|
|
|
2 | 电气和外围系�?/span> Electric and other system | Central Operating System 集中操作系统 | Including parallel machine device 含并�?/span> |
| 1 |
|
Diesel Engine local control panel 柴油机就地控制屏 |
|
| 6 |
|
Generator Circuit Breaker Panel (GB)发电机开关屏 | KYN28-24, 630A, 25KA |
| 6 |
|
DC System Control Panel (DCC) 直流控制�?/span> Accumulator Battery Panel 蓄电池屏 |
|
| 1 |
|
Cooling water Radiator 冷却水散热器 |
|
| 6 |
|
Silencer Expansion Bellows 膨胀�?/span>,消音�?/span> |
|
| 6 |
|
LUBE OIL AUTO BACKWASH FILTER,PRE HEATER,润滑油自动反冲洗过滤器�预热�?/span> |
|
| 6 |
|
3 | 燃油系统 Diesel / oil unit | NOZZLE COOLING UNIT喷嘴冷却装置 |
|
| 3 |
|
PLATE-TYPE LUBE OIL COOLER板式润滑油冷却器 |
|
| 6 |
|
重油供应单元HFO supply unit | GEA |
| 4 |
|
重油分离单元HFO separation unit | GEA |
| 4 |
|
废气锅炉exhaust gas boiler | Vendor: AALBORG |
| 3 |
|
滑油分离�?br/> Oil treatment seperator unit |
|
| 6 |
|
4 | 附件 Accessories | Starting Air Receiver Unit 启动空气�?/td> | 500l 30bar |
| 2 |
|
Starting Air Compressor Unit 启动空气压缩机单�?/span> | 37m3/h,30bar |
| 2 |
|
6 |
| Standard Spare Parts 标准备件,Tool 工具,file文件 |
|
| 2 |
|
7 |
| Station Service Transformer 厂用电变压器 and Station service transformer Panel 厂用电变压器�?/td> |
|
| 1 |
|
8 | Total Amount( Usd) FOB ( Shanghai Seaport ) |
|
| ob |
|
|
|
|
|
|
|
|
|
|
|
|
Notes: |
|
|
|
|
|
|
| 1. All prices base on FOB SHANGHAI PORT |
|
|
| 2.Quality guaranty: Provide full warranty within one year from the date of delivery or 2000 operating hours, whichever comes first. |
|
| 3.Date of delivery: 6 --9months after receipt of advance payment. |
|
|
| 4. Payment: 50 percent advance payment, 50 percent Irrevocable, first class international bank letter of credit. |
|
|
| 5. Valid date for the offer: before . 30-07-2022 |
|
|
| 6. The offer is for equioment inside the power plant only. All civil work and fuel tanks should be taken out by customer. |
|
| 7. Installation guide and test: |
|
|
|
|
|
| a.USD 2500 salary per day for one engineer (total 2-4 persons) during installation supervision and test (about 2 months). |
|
| b.USD 2500 salary per day for one engineer (total 2 -4persons) during training and running (about 2 month). |
|
| c.The costs for traveling between China and customer, lodging and food shall be borne by customer. |
|
| d.The insurance for epidemic prevention medical treatment in the local country shall be borne by the Buyer, |
| and the insurance for epidemic prevention medical treatment in China shall be borne by the Seller |
|
|
|
|
|
|
|