Name of Used or Surplus Equipment/Project: | GE Turbine power plant for sale: PG9171E | Brand name of Equipment: | GE | P/N of Equipment: | PG9171E | Industry: | Gas Power Generation Industry | Summary Briefs on the equipment: | | Origin of Main Product: | | Year of Production of Main Equipment: | 1997 | Current Country located: | 中国 China | Original Packing: | | Warranty: | | Documents: | | Dismantled or on site: | | Can be Test Run or Not: | | Year of Shutdown: | 2012 | Year of Overhaul: | 2023 | Total Operation Hours: | 28200 | O&M log: | | Current Condition: | | Dismantling, packing transportation Serviece: | | Refurbishment Services: | �?YES | Site installation and commissioning or Supervision: | 安装 Installation | Role: | | Already Sold or not: | | Time of first Sold: | | rough budget or contract value in USD: | | Payment Terms: | | File Link: | NO_File |
这是一��完整�?E单循环电站,2012年停产,我们认为90%的设备是可以维修后使用的 GE Turbine power plant for sale: PG9171E,Year of Make:1997,Voltage: 10.5Kv/50Hz,hours:28200. Standard duel fuel system, only using natural gas and diesel as fuel for captive power supply, not sharp start, only stable operation. the plant still in very good condition. after shut down in 2012,turning 24 hours in every month. Now dismantled by professinal Gas turbine maker, and will be overhauled and upgraded to vey good condition for sale. detailed scope of it is the completed power plant for sale, but the current EPC only took the valable equipments, other items left. power: 120mw located in China Status: Good-Running Pls quote above or what else you can supply. And this is a complete 9E power plant, single cycle, shut down in 2012. And we checked the power plant, 90% of the equipment can be used after repair. And now we want to know how we can cooperate: 1. We sell all the power plant to your as where as it is without warranty. Of course we can provide dismantling, packing jobs to you. 2. Buyer buys the power plant, then we can upgrade, supply or spare parts, repair of parts, onsite installation and commissioning, after sale services and also operation and maintenance jobs.
9E.03 is a very mature heavy gas turbine of GE, with about 90 sets in Chinese Mainland and about 1000 in the world; 2. Main performance data of new 9E.03 unit (ISO) /9E.03 新机主要性能数据(ISO�?/span> 单循环出�?SC Net Output MW 129 单循环热耗率 SC Net Heat Rate kJ/kWh, LHV 10,403 单循环效�?SC Net Efficiency %, LHV 34.6% 联合循环出力 CC Net Output MW 200 联合循环热��?CC Net Heat Rate kJ/kWh, LHV 6,751 联合循环效率 CC Net Efficiency %, LHV 53.3% 电厂最��负荷�?Plant Turndown-Minimum Load % 30.0% 加载�?Ramp Rate MW/min 50 启动时间 Startup Time RR Hot, Minutes 38
4. Basic information of second-hand 9E unit/二手 9E 燃机的基本信�?/span> Model: PG9171E; Manufacturer: GE-EPE Year of manufacture: 1997 Nameplate output: 123MW(ISO�?/span> Generator outgoing voltage: 10.5KV, 50Hz Total ignition hours: 28200 hrs. Fuel: natural gas + light diesel dual-fuel unit Combustion chamber type: standard combustion chamber (non DLN) Power station type: single cycle, outdoor layout Unit status: the equipment operates well Production stop time: 2012, Location: Chinese Mainland Equipment status: all equipment is on the stand
LC_Guid: |