Email: [email protected]   WhatsApp/WeChat: +0086-13801218512
  
Homepage   |   Power Generation   |   Top Spare parts   |   spare parts   |   China OEM Equipment and Spare Parts   |   Project Financing    |   Equipments   |   China Small EPC Contractor   |   Transmission   |   Financing-Ebook   |   Contact Us   |   Used Equipment   |   download   |   sitemaps   |   Project-Equipment-Parts-Enquiry   |   供货商Supplier   |   Exchange Link   |   Breaking News  
Mail List

E-mail:

     上方导航  
       Homepage  
       Power Generation  
       Top Spare parts  
       spare parts  
       China OEM Equipment and Spare Parts  
       Project Financing   
       Equipments  
       China Small EPC Contractor  
       Transmission  
       Financing-Ebook  
       Contact Us  
       Used Equipment  
       download  
       sitemaps  
       Project-Equipment-Parts-Enquiry  
       供货商Supplier  
       Exchange Link  
       Breaking News  
     下方导航  

Diesel Generator Proposal

Power Plant Proposal
Required Information for Power Plant Project design and quotation

Home > HomePage > Equipment > New Equipment > CSSC - 200mw hfo power plant by CSSC 18M3240 8700KW/11KV/50HZ generating set CSSC 18M3240

Buyer     Inquiry Basket     Supplier     Register


200mw hfo power plant by CSSC 18M3240 8700KW/11KV/50HZ generating set CSSC 18M3240


Name of New Equipment:200mw hfo power plant by CSSC 18M3240 8700KW/11KV/50HZ generating set
Brand name of Equipment:CSSC
P/N of Equipment:18M3240
Industry:Fluid Power Generation Industry
Summary Briefs on the equipment:
Origin of Product:
Original Packing:
Warranty:
Installation, commissioning service:
Role:
Already Sold or not:
Time of first Sold:
Already sold coutry or region:
Rough budget or contract value:  货币选择
Payment Terms:
File Link:200MW HFO Power Plant Proposal 20230701.doc
200MW 23sets CSSC18M3240 HFO电站报价    
No.Item QtyUnitPrice (USD)Total�?/span>USD�?/span>Remark
1CSSC   18M3240 8700KW/11KV/50HZ  generating   set HFO发电机组23set



HFO   Diesel engine         CSSC18M3240                                               HFO柴油�?/span>23



Alternator                                                            发电�?/span>23



Common base frame                                        共同底座23



Flexible coupling                                                  联轴�?/span>23



Centralized console  集中控制�?/span>                                                   12



2Generator   accessories                                       机组附件23set



Lube   oil cooler                                                        滑油冷却�?/span>(Plate type)  23


Cooling module
Fresh water cooler                                                淡水冷却�?/span> (Plate type)23


Lube oil filter                                                        滑油滤器23


lube oil thermostatic valve                                   滑油温控阀/span>23


HT water thermostatic valve                                水温控阀23


Motor driven water pump                          电动低温水泵                             23



Cooling radiator                          散热�?/td>23



Air compressor (one is diesel start)                      空压�?/span>6



Air bottle                                                              空气�?/span>6



Silencer                                                              消音�?/span>23



Expansion bellow                                                膨胀�?/span>23



Expansion tank                                                   膨胀水箱23



3Eectrical   system                                                   电气系统





Outgoing   panel                                                      出线�?/span>23


KYN28A-12
Linkage panel for generating                                                       发电母线联络�?/span>4


KYN28A-12
Station transformer panel                                     所��变柜2


KYN28A-12
PT panel                                                                压变�?/span>4


KYN28A-12
Plant transformer (2500kVA 11KV/0.4KV)               站用变压�?/span>2


S11-M
400 Volt main panel                                           低压辅助总柜12


GCS带双电源
Gen-set auot Synchronous                                   自动同期系统4



DC System                                                      直流系统4



Air compressor control box                                空压机动力箱6



Gen-set Aux. Control Panel                                   机组辅助控制�?/span>23



4FUEL   Treatment unit                                           燃料处理设备





Soft   water treatment device                                 软水设备4



5HFO   Treatment unit                                           重油处理设备





HFO   purified separator module                            分离机单�?/span>12


双机模块
Common Circulating & Booster module             供油单元12



LO purifier separator                                                 滑油分离机单�?/span>23



Exhaust gas boiler                                             锅炉�?/span>23



HFO unloading pump station                             重油卸油泵站6



DO unloading pump station                               轻油卸油泵站6



Sludge pump station                                       渣油泵站6



6Spare   parts and special tools                                专用工具和随机备�?/span>12set


7Documents                                                           文件12set



Sub-Amount                                                         小计




8Mechanical   installation materials                           机械安装材料23set

买家负责
9Electrical   installation materials                               电气安装材料23set

买家负责
10HFO   tank: 6*2000M3,4*1000M3, 4*30M3, 12*10M31LOT

买家负责
11DO   tank   2*1000m3, 2* 100m3 ,1LOT

买家负责
12SEA   COST 海运�?nbsp;   220USD/RT23LOT

买家负责
13吊装,码头,仓库和短途运输费23LOT

买家负责
14厂房,基础.道路,土建,吊机,照明,消防,往��费用1LOT

买家负责








Total    合计
































Notes:





1. All prices base on   FOB  shanghai port ,no whit 13%VAT.


2.Quality guaranty: Provide full warranty within one year from   the date of delivery or   2000 operating hours, whichever comes first.

3.Date of delivery: 14-16 months after receipt of advance   payment.


4. Payment: 50 percent   advance payment, 50 percent  before   shipment.


5. Valid date for the   offer: before Oct. 30, 2023


6. The offer is for   equioment inside the power plant only. All civil work and fuel tanks should   be taken out by customer. 

7. Installation guide and test:





a.USD 2000 salary per   day for one engineer (total 4-6 persons) during installation supervision and   test (about 6 months).

b.USD 2000 salary per   day for one engineer (total 4-6 persons) during training and running (about 6   month).

c.The costs for   traveling between China and customer, lodging and food shall be borne by   customer.



LC_Guid:
Pubdate: 2023/7/2 8:55:41


Click add item to inquiry basket      Click Copy Shared LinksInquiry Basket

Pageviews: 3



Statement: Any reference to the OEM part number or other OEM information is for the purpose of identification only and does not imply that the part was manufactured by the Original Equipment Manufacturer.

All the brands and trademarks in the whole domain of the website belong to their own owners and does not mean that we are their authorized partner or dealer. All the information in this website is only for reference, we do not assure its accuracy.

This statement supersedes all other claims and statements on all pages, files, pics and information within this whole web domain.

Copyright©2006-2019 Leda Greenpower Beijing ICP Reg. No: 10010978.   Fax:0086-10-84161062  E-mail: [email protected]

JingGongWangAnBei: 11010802035914 Hao