Name of Used or Surplus Equipment/Project: | One complete used single GE PG9171E gas turbine plant for sale | Brand name of Equipment: | GE | P/N of Equipment: | PG9171E | Industry: | Gas Power Generation Industry | Summary Briefs on the equipment: | | Origin of Main Product: | China; | Year of Production of Main Equipment: | 2006 | Current Country located: | | Original Packing: | | Warranty: | | Documents: | | Dismantled or on site: | | Can be Test Run or Not: | | Year of Shutdown: | | Year of Overhaul: | | Total Operation Hours: | 2800 | O&M log: | 有完整运维记录Full O&M Log | Current Condition: | 9成新fairly new | Dismantling, packing transportation Serviece: | | Refurbishment Services: | | Site installation and commissioning or Supervision: | | Role: | | Already Sold or not: | | Time of first Sold: | | rough budget or contract value in USD: | | Payment Terms: | | File Link: | NO_File |
另外一��2006年生产的9e燃机电站是单循环�?018年安装,使用小时只有2800小时,大概要亿人民币出售�?e电站都是双燃料系统,均可以使用天然气和轻质柴油作为燃料�目前都是使用的燃料是天然气�这是一��完整�?E单循环电站,There is a complete power plant for sale with one unit of GE 9E gas turbine generator set and related equipment as single cycl. the pwor plant installed in 2018, duel fuel system of gas and diesel oil, current runing fuel is gas. GE Turbine power plant for sale: PG9171E,Year of installation: 2018. Voltage: 10.5Kv/50Hz,hours:2800 it is the completed power plant power: 120mw located in China Status: very Good-Running Pls quote above or what else you can supply. And this is a complete 9E power plant, single cycle. And now we want to know how we can cooperate: 1. We sell all the power plant to your as where as it is without warranty. Of course we can provide dismantling, packing jobs to you. 2. Buyer buys the power plant, then we can upgrade, supply or spare parts, repair of parts, onsite installation and commissioning, after sale services and also operation and maintenance jobs.
9E.03 is a very mature heavy gas turbine of GE, with about 90 sets in Chinese Mainland and about 1000 in the world; 2. Main performance data of new 9E.03 unit (ISO) /9E.03 新机主要性能数据(ISO�?/p> 单循环出�?SC Net Output MW 129 单循环热耗率 SC Net Heat Rate kJ/kWh, LHV 10,403 单循环效�?SC Net Efficiency %, LHV 34.6% 联合循环出力 CC Net Output MW 200 联合循环热��?CC Net Heat Rate kJ/kWh, LHV 6,751 联合循环效率 CC Net Efficiency %, LHV 53.3% 电厂最��负荷�?Plant Turndown-Minimum Load % 30.0% 加载�?Ramp Rate MW/min 50 启动时间 Startup Time RR Hot, Minutes 38
4. Basic information of second-hand 9E unit/二手 9E 燃机的基本信�?/p> Model: PG9171E; Manufacturer: GE Year of manufacture: 2018 Nameplate output: 123MW(ISO�?/p> Generator outgoing voltage: 10.5KV, 50Hz Total ignition hours: 2800 hrs. Fuel: natural gas + light diesel dual-fuel unit Combustion chamber type: standard combustion chamber (non DLN) Power station type: single cycle, outdoor layout Unit status: the equipment operates well Production stop time: Location: Chinese Mainland Equipment status: all equipment is on the stand
LC_Guid: |