Name of Used or Surplus Equipment/Project:ect: | complete power plant for sale with 2 units of Siemens gas turbine genset: SGT-400 | Brand name of Equipment: | Siemens | P/N of Equipment: | SGT-400 | Industry: | Gas Power Generation Industry | Summary Briefs on the equipment: | | Origin of Main Product: | | Year of Production of Main Equipment: | 2015 | Current Country located: | 中国 China | Original Packing: | | Warranty: | | Documents: | | Dismantled or on site: | 没有拆卸在机�?Not dismantled and still on site | Can be Test Run or Not: | | Year of Shutdown: | | Year of Overhaul: | | Total Operation Hours: | 17000 | O&M log: | | Current Condition: | | Dismantling, packing transportation Serviece: | | Refurbishment Services: | | Site installation and commissioning or Supervision: | | Role: | | Already Sold or not: | | Time of first Sold: | | rough budget or contract value in USD: | | Payment Terms: | | File Link: | 西门子SGT-400运行状况-wu20221216.docx |
There is a complete power plant for sale with 2 units of Siemens gas turbine genset: SGT-400, 50hz, Made in around 2015, in very good condition. shutdown due to shortage of coke oven gas. Before shutdown overhauled. Location: China, and power plant directly from owner, technical supported by our China Siemens partner for SGT-400 power plant. and now one unit SGT-400 gas turbine genset is still in good condtion for operation, and another unit removed from site for overhaul. Thanks for your trust, I will keep it only to myself. To me, I have no need to dig out what her units are, we will work closely with owner and Siemens partner, and GE partner in China, with them for about 20 years. For the SGT-400 units: There are 2 units, one set broken down, and taken out from site for repair, another units still in very good condition for sale. You can take the one still in good condition on site. I just called my partner, they told me for one set of sgt400 genset’s dismantling, packing and transporting to port, the cost and time is very small if they can do it for you, about 50000usd. For Spare parts, some from them, some from Siemens, their parts much cheaper. Turbine is in a container on site for operation, alternator will be packed transporting after dismantling from site. The current plant was supplied and O&M by them. Price of the unit will be negotiated for serious buyer. Newly replaced turbine operated about only 8000 hours after replaced by Siemens partner, alternator not replaced, so 35000hours operation for alternator, the whole unit still very good condition.
LC_Guid: |