Email: [email protected]   WhatsApp/WeChat: +0086-13801218512
  
Homepage   |   Power Generation   |   Top Spare parts   |   spare parts   |   China OEM Equipment and Spare Parts   |   Project Financing    |   Equipments   |   China Small EPC Contractor   |   Transmission   |   Financing-Ebook   |   Contact Us   |   Used Equipment   |   download   |   sitemaps   |   Project-Equipment-Parts-Enquiry   |   供货商Supplier   |   Exchange Link   |   Breaking News  
Mail List

E-mail:

     上方导航  
       Homepage  
       Power Generation  
       Top Spare parts  
       spare parts  
       China OEM Equipment and Spare Parts  
       Project Financing   
       Equipments  
       China Small EPC Contractor  
       Transmission  
       Financing-Ebook  
       Contact Us  
       Used Equipment  
       download  
       sitemaps  
       Project-Equipment-Parts-Enquiry  
       供货商Supplier  
       Exchange Link  
       Breaking News  
     下方导航  

Diesel Generator Proposal

Power Plant Proposal
Required Information for Power Plant Project design and quotation

Home > HomePage > Equipment > Used or Surplus Equipment > ge - 5 units of used GE 6B gas turbine genset for sale in China GE 6B

Buyer     Inquiry Basket     Supplier     Register


5 units of used GE 6B gas turbine genset for sale in China GE 6B


Name of Used or Surplus Equipment/Project:ect:5 units of used GE 6B gas turbine genset for sale in China
Brand name of Equipment:GE
P/N of Equipment:6B
Industry:Gas Power Generation Industry
Summary Briefs on the equipment:5 units of used GE 6B gas turbine genset for sale. all the 5 units are stocked in China under our control and ownership, and we have the ability to provide refurbished and EPC and O&M services. 2 units as used ones not refurbished, 3 units already refurbished and upgraded.
Origin of Main Product:
Year of Production of Main Equipment:2006
Current Country located:中国 China
Original Packing:
Warranty:
Documents:
Dismantled or on site:已经拆卸并包�?Dismantled and Packed
Can be Test Run or Not:
Year of Shutdown:
Year of Overhaul:
Total Operation Hours:65000
O&M log:
Current Condition:
Dismantling, packing transportation Serviece:
Refurbishment Services:
Site installation and commissioning or Supervision:
Role:
Already Sold or not:
Time of first Sold:
rough budget or contract value in USD:
Payment Terms:
File Link:89ad5a49702841809d38f633a56d864.jpg
dab928df4a806a8c2663a97be30c431.jpg
ec48d1de95bfca10b02d1c5948348f8.jpg
4009ca58d01b58bc4017230c0133f56.jpg
Technical proposal for repair of second-hand 6B gas turbine 20230926.xlsx

the 5 units 6B were produced in 2006. Total ignition hours around 35000-65000 hours

 

This batch of 6B GE gas turbine gensets will be rebuilt to the newest standards, now we are planning the detailed rebuilding technical proposals. Combustion chamber parts and turbine parts will be refurbished, if possible, of course if end user needs brand new parts of them, we will rebuild to the customized needs of the clients. Then we can take the turbine similar to be reset to 0 hours of ignition.

 

Priced about 8.5-9.5million Usd Exw China, price and terms can be negotiated to final stage to actual configuration for serious buyers

Attached is for your reference.


5 units of used GE 6B gas turbine genset for sale. all the 5 units are stocked in China under our control and ownership, and we have the ability to provide refurbished and EPC and O&M services. 2 units as used ones not refurbished, 3 units already refurbished and upgraded. GT No.: 8 and 6 GT Model  6B Year of Manufacture:  2006 Total Operating Hours:  About 65000 GT Body+Aux.Equipments: Used GT Body+Aux.Equipments (as where as it it now) Load Gear Box: Load Gear Box (as where as it it now) Generator: 50MW Generator(as where as it it now) EXW China Price (as where as it it now) GT No.: 5 and 3 GT Model  6B Year of Manufacture  2006 Total Operating Hours  About 65000 GT Body+Aux.Equipments: GT Body+Aux.Equipments (After Refurbished) Load Gear Box: Load Gear Box (After Refurbished) Generator: 50MW Generator (After Refurbished) EXW price for Gas turbine genset island: including refurbished equipments+new Ele. & Aux.Equipments GT No.: 2 GT Model: 6B Year of Manufacture: 2006 Total Operating Hours: About 65000 GT Body+Aux.Equipments: GT Body+Aux.Equipments(After Refurbished) Load Gear Box: Load Gear Box (After Refurbished) Generator not available now and will be supplied by a one one EXW price for Gas turbine genset island: including refurbished equipments+new Ele. & Aux.Equipments

the 5 units of Used 6B Pg6581 GE gas turbine gensets runnig about 35000-65000 hours, can be sold in 3 conditions:

A: re-newed with new blade and vanes and combustion liner and burner.

B: with refurbished blade and vanes and combustion liner and burner.

C: without replacing the used blade and vanes with original status as used one


when sold under consition B:

The version of the used turbine gensets are PG6581.

And the delivery time ranges from 6-8 months, one by one unit.

And now they are rebuilding one of the units for a Chinese client using 100% H2 as fuel for experiment, after ending of the experiment, the unit can be sold to new buyers, such as your company, delivery will be about 5 months.

And also the final configuration needed by the client also a factor for delivery time.

 

the 5 units 6B were produced in 2006. Total ignition hours around 35000-65000 hours

 

This batch of 6B GE gas turbine gensets will be rebuilt to the newest standards, now we are planning the detailed rebuilding technical proposals. Combustion chamber parts and turbine parts will be refurbished, if possible, of course if end user needs brand new parts of them, we will rebuild to the customized needs of the clients. Then we can take the turbine similar to be reset to 0 hours of ignition.

 

Priced about 8.5-9.5million Usd Exw China, price and terms can be negotiated to final stage to actual configuration for serious buyers

Attached is for your reference of one rebuilding plan.

 

 

Here is the reply to your questions:

To summarize the situation, my customer is interested in units of used GE-6B (Re-newed with repaired hot parts). The below questions would be appreciated to get answered by your GE partner:

 

1. Total EOH of each unit, including working hours and number of start and emergency shutdown if eny?

A: The total working hours of the 5 used 6B gas turbine genset are about 30000-60000 hours, starting times about 300-400 times.

 2. Current situation of units and Working hours after Major Inspection or Overhaul?

 A: when the units were in operation or in the plant, gas turbine only were done one times of HGPI middle level overhaul  or one times of MI main overhaul. All the units will be brought back to GE partner’s works to rebuild to new standards of 6B gas turbine gensets,  factory test. During the rebuilding, brand new combustion system, generator exciter control panel, MCC, and all auxiliaries excerpt the common base. 3. If the units are already packed and ready to shipment, please send packing list.

3. Delivery time and price for international packing and preparing export documents and delivery port for destination of UAE.

 A: due to the rebuilding and reconfiguring, so at this time be no packing list available4. Warranty and performance guarantee? 

4. if the power plant is decommissioned (out of operation), we need a performance guarantee to ensure about restarting (decommissioning)

 A: we can provide warranty of the gas turbine genset performance and quality to new standard design. We can also provide site installation, commissioning and O&M services to contracts.

5. Available spare parts if any.

 A: we can provide life time spare parts supply.

6. Preservation and maintenance history.

A: now the used units are stocked in our partner’s stock house.

7. Fuel flexibility for liquified fuel (diesel fuel)? 

If it is operated with NG fuel, Unit are equipped with dual or only gas "burner type"?

 A: GE 6B gas turbine genset fuel can be mainly: Natural gas, syn-gas, LGP, light diesel oil, HFO, crude oil.  We can also provide duel fuel combustion system of gas and liquid fuel.

8. Is there technical documents about fuel system and power block main equipment?

 A: as the producer and rebuilder will be GE partner in China, so whole sets of needed technical documents can be available or provided.

9. Is there a technical report about disassembly of the GT systems and inspection before disassembly?

A: after technical and commercial agreement signed to technical proposal, we will start to design and rebuild and upgrade, or refurbish, before delivery, whole set of quality control documents will be issued.

Here are some pics on the 1 unit of the 5 units, the 1 unit has be rebuilt in GE partner works and will be assembled to use 100% H2 as fuel for test operation. After test, they will be also on sale.

 

The other 4 units of 6B gas turbine genset, now disassembled and stocked in house,  If agreed with technical and commercial terms, will be rebuilt on the same procedures. 





LC_Guid:
Pubdate: 2024/1/16 13:28:09


Click add item to inquiry basket      Click Copy Shared LinksInquiry Basket

Pageviews: 11



Statement: Any reference to the OEM part number or other OEM information is for the purpose of identification only and does not imply that the part was manufactured by the Original Equipment Manufacturer.

All the brands and trademarks in the whole domain of the website belong to their own owners and does not mean that we are their authorized partner or dealer. All the information in this website is only for reference, we do not assure its accuracy.

This statement supersedes all other claims and statements on all pages, files, pics and information within this whole web domain.

Copyright©2006-2019 Leda Greenpower Beijing ICP Reg. No: 10010978.   Fax:0086-10-84161062  E-mail: [email protected]

JingGongWangAnBei: 11010802035914 Hao