Email: [email protected]   WhatsApp/WeChat: +0086-13801218512
  
Homepage   |   Power Generation   |   Top Spare parts   |   spare parts   |   China OEM Equipment and Spare Parts   |   Project Financing    |   Equipments   |   China Small EPC Contractor   |   Transmission   |   Financing-Ebook   |   Contact Us   |   Used Equipment   |   download   |   sitemaps   |   Project-Equipment-Parts-Enquiry   |   供货商Supplier   |   Exchange Link   |   Breaking News  
Mail List

E-mail:

     上方导航  
       Homepage  
       Power Generation  
       Top Spare parts  
       spare parts  
       China OEM Equipment and Spare Parts  
       Project Financing   
       Equipments  
       China Small EPC Contractor  
       Transmission  
       Financing-Ebook  
       Contact Us  
       Used Equipment  
       download  
       sitemaps  
       Project-Equipment-Parts-Enquiry  
       供货商Supplier  
       Exchange Link  
       Breaking News  
     下方导航  

Diesel Generator Proposal

Power Plant Proposal
Required Information for Power Plant Project design and quotation

Home > HomePage > Equipment > New Equipment > LEEEC - 40MVA Power Transformer LEEEC 40MVA Power Transformer

Buyer     Inquiry Basket     Supplier     Register


40MVA Power Transformer LEEEC 40MVA Power Transformer


Name of New Equipment:40MVA Power Transformer
Brand name of Equipment:LEEEC
P/N of Equipment:40MVA Power Transformer
Industry:
Summary Briefs on the equipment:40MVA Power Transformer 变压�?Please find following quotation for the Transformers: 1.Type:1×31.5/40 MVA 132/11.5 kV Transformer Unit price: (FOB DALIAN, CHINA) Note: 1. Routine test (according to IEC60076) had been included in the price and will be tested at LEEEC factory. 2. Tap changer of power transformer we proposed made by MR. 3. The fans, radiators are made by Chinese brand. 4. The price exclude spare parts and supervision of installation at site for engineers from manufacturer. 5. This price valid will be 20 days from submission of bid offer. 6. Supervision services during installation, testing, commissioning should be paid 200 USD per man-day for technician and 300 USD per man-day for engineer (Excluding visa fee, flights fee, accommodation , and quarantine fee). 7. The engineers�?food and accommodation cost (in Liaoyang city) for FAT in LEEEC is not included in the quotation. 8.The term of payment is T/T. 9. Delivery time is 8 months after Design approval by client and advance payment received by LEEEC under the condition of FOB Chinese seaport. 10. Warranty Period: 12 months after transformer commissioning or 18 months after transformer delivery from factory, whichever occurs first.
Origin of Product:
Original Packing:
Warranty:yes
Installation, commissioning service:
Role:
Already Sold or not:
Time of first Sold:
Already sold coutry or region:
Rough budget or contract value: 
Payment Terms:
File Link:技��表格40mva transformer.docx

LC_Guid:FD01A52D72FBF945941DAB3B56B6DB0A
Pubdate: 2023/3/18 11:14:31


Click add item to inquiry basket      Click Copy Shared LinksInquiry Basket

Pageviews: 4



Statement: Any reference to the OEM part number or other OEM information is for the purpose of identification only and does not imply that the part was manufactured by the Original Equipment Manufacturer.

All the brands and trademarks in the whole domain of the website belong to their own owners and does not mean that we are their authorized partner or dealer. All the information in this website is only for reference, we do not assure its accuracy.

This statement supersedes all other claims and statements on all pages, files, pics and information within this whole web domain.

Copyright©2006-2019 Leda Greenpower Beijing ICP Reg. No: 10010978.   Fax:0086-10-84161062  E-mail: [email protected]

JingGongWangAnBei: 11010802035914 Hao