Name of Used or Surplus Equipment/Project: | Used GE PG9171E Turbine power plant for sale | Brand name of Equipment: | GE | P/N of Equipment: | PG9171E | Industry: | Gas Power Generation Industry | Summary Briefs on the equipment: | | Origin of Main Product: | China; | Year of Production of Main Equipment: | 1997 | Current Country located: | 中国 China | Original Packing: | | Warranty: | 没有No Warranty | Documents: | | Dismantled or on site: | 没有拆卸在机�?Not dismantled and still on site | Can be Test Run or Not: | 不能试机Can not be Tested Run | Year of Shutdown: | 2012 | Year of Overhaul: | | Total Operation Hours: | 28000 | O&M log: | | Current Condition: | | Dismantling, packing transportation Serviece: | 安装 Installation | Refurbishment Services: | �?YES | Site installation and commissioning or Supervision: | 调试 Commissioning | Role: | | Already Sold or not: | | Time of first Sold: | | rough budget or contract value in USD: | | Payment Terms: | | File Link: | NO_File |
这是一��完整�?E单循环电站,2012年停产,我们认为90%的设备是可以维修后使用的 GE Turbine power plant for sale: PG9171E,Year:1997,Voltage: 10.5Kv/50Hz,hours:28200 it is the completed power plant power: 120mw located in China Status: Good-Running Pls quote above or what else you can supply. And this is a complete 9E power plant, single cycle, shut down in 2012. And we checked the power plant, 90% of the equipment can be used after repair. And now we want to know how we can cooperate: 1. We sell all the power plant to your as where as it is without warranty. Of course we can provide dismantling, packing jobs to you. 2. Buyer buys the power plant, then we can upgrade, supply or spare parts, repair of parts, onsite installation and commissioning, after sale services and also operation and maintenance jobs.
LC_Guid: |