Name of New Equipment: | 40mw Hfo power plant project proposal and quotation by MAN 10L324 gensets | Brand name of Equipment: | Man | P/N of Equipment: | 10L324 | Industry: | Fluid Power Generation Industry | Summary Briefs on the equipment: | | Origin of Product: | | Original Packing: | | Warranty: | | Installation, commissioning service: | | Role: | | Already Sold or not: | | Time of first Sold: | | Already sold coutry or region: | | Rough budget or contract value: | 货币选择 | Payment Terms: | | File Link: | NO_File |
1.概述 1.根据实际需��:利用原有电厂设施(油库,水池,变电�?/span>),增设组合式钢结构厂房,布罝7�?/span>MAN5.4MW重油发电机组和一台调�?/span>3.5MW重油发电机组,电压11KV,频率50Hz. 电站总容�?/span>7�?/span>*5.4MW+1�?/span>*3.5MW=41.3MW.85%长期经济供电容量32MW. 考虑到机组轮流保养需要以及维持电�?/span>85%的运行效�?/span>.7�?/span>5.4发电机组长期并机运行,运行功率7*5.4*85%=32MW. 当有一��5.4MW机组保养�?/span>,3.5MW机组短期替补,6*5.4MW*85%+3.5MW=31MW. 保证电厂长期稳定供电30--32MW. 8台套发电机组布置�?/span>�?/span>附件《发电厂区�体平面布置图�?/span>. 燃料为重油和柴油�?/span> 配套�?/span>�?/span>/安全报警系统,润滑�?/span>/冷却�?/span>/压缩空气/排气系统,高低压电系统等� According to the actual demand: use the original power plant facilities (oil depot, pool, substation), add modular steel structure workshop, install 7 MAN5.4MW heavy oil generator sets and one set peak-regulating 3.5MW heavy oil generator set, voltage 11KV, frequency 50Hz. Total power plant capacity: 7 units *5.4MW+1 units *3.5MW=41.3MW. 85% long-term economic power supply capacity: 32MW. Considering the need of unit maintenance in turn and the maintenance of 85% operation efficiency of the power station, 7 sets 5.4mw generator sets run concurrently for a long time, with operation power of 7*5.4*85%=32MW. When there is a 5.4MW unit maintenance,3.5MW unit short-term replacement, 6sets *5.4MW*85%+3.5MW=31MW. Ensure long-term stable power supply of 30-32MW. For the layout of the 8 sets of generator sets, see the attached General Layout Of the Power Generation Plant. Fuel is heavy oil or diesel. Supporting control/safety alarm system, lubricating oil/cooling water/compressed air/exhaust system, high and low pressure electrical system, etc. 1.3�?/span>电机组项目的主要技��参数如下�?/span> Main technical parameters of generator set are as follows: �?/span> 总发电输出功率:41.3MW 11KV 50Hz Total output power of generation: 41.3MW 11KV 50H �?/span> 发电机组型号: 7�?/span>MAN10L3244 5.4MW发电机组,1�?/span>BB3345 3.5MW发电机组 Model of the generator set: 7sets MAN 10L32444 5.4MW generator set,one sets BB3345 3.5MW generator set, �?/span> 发电机组数量�?/span>8�?/span> Number of generator sets: 8sets �?/span>机组输出电压�?/span>11KV Output voltage of the unit: 11KV �?/span>频率�?/span> 50Hz Frequency: 50Hz �?/span>燃料�?/span>柴油和重�?/span> Fuel: DO /HFO �?/span>冷却方式�?/span> 压力�?/span>循环�?/span>冷形�?/span>�?/span> Cooling method: Pressure water circulating water cooling by airing.
Offer for 40MW 11kV 50HZ HFO power plant(20231114) | No. | Item | Qty | Unit | Price (USD) | Total(USD�?/td> | Remark | A-1 | MAN 10L324 5.4W/11KV/50HZ generating set 发电机组 | 7 | set |
|
| A-1,2013�?00%全新 | A-2 | ROLLS-ROYCE 3.5MW/11KV/50HZ generating set 发电机组 | 1 | set |
|
| A-2,2017�?00%全新 |
| include:Diesel engine柴油机Alternator发电机Common base frame共同底座Flexible coupling联轴�?br/> | 8 | set |
|
|
| B-2 | HFO unloading pump station 重油卸油泵站 | 2 | set |
|
| B-2 | C-1 | DO unloading pump station 轻油卸油泵站 | 1 | set |
|
| C-1 | C-3 | Sludge pump station 渣油泵站 | 1 | set |
|
| C-3 | C-6 | HFO purifier separator Unit | 4 | set |
|
| C-6 | C-7 | HFO Booster Unit | 4 | set |
|
| C-7 |
|
|
|
|
|
|
| D | Lubricating oil system uni |
|
|
|
|
| D-1 | Lubricating oil purifier separator Unit | 8 | set |
|
| D-1 | D-3 | Lubricating supply oil unit | 8 | set |
|
| D-3 | D-2 | Lubricating oil filling unit | 2 | set |
|
| D-2 | E | Compressed air system unit |
|
|
|
|
| E-1 | Starting air compressor unit(Motor driven) | 3 | set |
|
|
| E-2 | Starting air compressor unit(Diesel engine driven) | 1 | set |
|
|
| E-3 | Air Receiver unit | 3 | set |
|
|
| F | Cooling system unit | 8 | set |
|
|
| F-1 | cooling water tower | 8 | set |
|
|
| F-2 | Low Cooling water pump | 8 | set |
|
|
| F-3 | Water soften device | 2 | set |
|
|
| G | Exhaust gas and steam system | 1 |
|
|
|
| G-1 | Exhaust gas silencer | 8 | set |
|
|
| G-2 | Expansion bellow | 8 | set |
|
|
| G-3 | exhaust boiler 1400KG | 4 | set |
|
|
| G-4 | exhaust SCR | 8 | set |
|
|
| I | 11kV Eectrical system |
|
|
|
|
| I-1 | Generator switchgear | 8 | set |
|
|
| I-2 | Busbar PT panel | 1 | set |
|
|
| I-3 | Station TX panel | 2 | set |
|
|
| I-4 | Station TX /Gen-set auot Synchronous | 2 | set |
|
|
| I-5 | Power Plant Outgoing switchgear | 4 | set |
|
|
| I-6 | linkage panel for generating | 1 | set |
|
|
| I-7 | Isolate panel with PT | 1 | set |
|
|
| I-8 | Switchgear & Control panel | 8 |
|
|
|
| I-9 | Remote control desk | 8 |
|
|
|
| K | 400V Eectrical system |
|
|
|
|
|
| Station transformer panel 所��变柜 | 1 |
|
|
|
|
| PT panel 压变�?/td> | 1 |
|
|
|
|
| Plant transformer (1250kVA 11KV//0.4KV) 站用变压�?/td> | 1 |
|
|
| S11-M |
| Outgoing panel | 1 |
|
|
| K-1 |
| Station LV input panel | 2 |
|
|
| K-2 | L | Power Plant control |
|
|
|
|
|
| Air compressor control box 空压机动力箱 | 2 |
|
|
| L-1 |
| Gen-set Aux. Control Panel 机组辅助控制�?/td> | 8 |
|
|
| L-2 |
| Power plant aux. panel 电站辅助动力�?/td> | 4 |
|
|
| L-5 |
| Separator power box 分离机房动力�?/td> | 1 |
|
|
| L-4 |
| 400 Volt supply panel for fuel station 卸油区动力箱 | 1 |
|
|
| L-3 | M | DC System 直流系统 |
|
|
|
|
| M-1,M-2 | DC control panel | 1 | set |
|
| M-1 | Battery panel | 2 | set |
|
| M-2 | R | Installation material |
|
|
|
|
| R1-8 | Mechanical installation materials 机械安装材料 | 8 | set |
|
| Customer commitment | R9-15 | Electrical installation materials 电气安装材料 | 8 | set |
|
| Customer commitment | S | Spare parts and Documents 文件和随机备�?/td> | 2 | set |
|
|
| T | 专用工具special tools | 1 | lot |
|
|
|
| sub-total 小计 |
|
|
|
|
| 11 | 安装,调试,,人工�?/td> | 8 | set |
|
| Customer commitment | 12 | SEA COST海运�?/td> | 8 | set |
|
| Customer commitment | 13 | 吊装,码头,仓库和短途运输费 | 1 | lot |
|
| Customer commitment | 14 | 油库,厂房,基础.道路,土建,吊机,照明,消防,往��费用 | 1 | lot |
|
| Customer commitment |
| Total Amount 总计 usd SHANGHAI PORT |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| Notes: |
|
|
|
|
|
|
| 1. All prices base on FOB SHANGHAI port ,USD no with 13%VAT. |
|
|
| 2.Quality guaranty: Provide full warranty within one year from the date of delivery or 2000 operating hours, whichever comes first. |
|
| 3.Date of delivery: 8-9months after receipt of advance payment. |
|
|
| 4. Payment: 50 percent advance payment, 50 percent before shipment. |
|
|
| 5. Valid date for the offer: before . 30-12,-2023 |
|
|
| 6. The offer is for equioment inside the power plant only. All civil work and fuel tanks should be taken out by customer. |
|
| 7. Installation guide and test:.. |
|
|
|
|
|
| a.The costs for traveling between China and customer,isolation. lodging and food shall be borne by customer. |
|
| b. USD 1600 salary per day for one engineer (total 2-4 persons) during installation supervision and test (about 2-3 months). |
|
| 8. Factory building, foundation, road, civil construction, crane, lighting, fire fighting, contact expenses borne by the buyer 厂房,基础.道路,土建,吊机,照明,消防,往��费用买方承担 |
|