Name of Used or Surplus Equipment/Project: | 5 units of Used 6B Pg6581 GE gas turbine gensets runnig about 35000-65000 hours sold in 3 conditions | Brand name of Equipment: | GE | P/N of Equipment: | PG6581 | Industry: | Gas Power Generation Industry | Summary Briefs on the equipment: | | Origin of Main Product: | | Year of Production of Main Equipment: | | Current Country located: | | Original Packing: | | Warranty: | | Documents: | | Dismantled or on site: | | Can be Test Run or Not: | | Year of Shutdown: | | Year of Overhaul: | | Total Operation Hours: | | O&M log: | | Current Condition: | | Dismantling, packing transportation Serviece: | | Refurbishment Services: | | Site installation and commissioning or Supervision: | | Role: | | Already Sold or not: | | Time of first Sold: | | rough budget or contract value in USD: | | Payment Terms: | | File Link: | NO_File |
the 5 units of Used 6B Pg6581 GE gas turbine gensets runnig about 35000-65000 hours, can be sold in 3 conditions: A: re-newed with new blade and vanes and combustion liner and burner. B: with refurbished blade and vanes and combustion liner and burner. C: without replacing the used blade and vanes with original status as used one
when sold under consition B: The version of the used turbine gensets are PG6581. And the delivery time ranges from 6-8 months, one by one unit. And now they are rebuilding one of the units for a Chinese client using 100% H2 as fuel for experiment, after ending of the experiment, the unit can be sold to new buyers, such as your company, delivery will be about 5 months. And also the final configuration needed by the client also a factor for delivery time. the 5 units 6B were produced in 2006. Total ignition hours around 35000-65000 hours This batch of 6B GE gas turbine gensets will be rebuilt to the newest standards, now we are planning the detailed rebuilding technical proposals. Combustion chamber parts and turbine parts will be refurbished, if possible, of course if end user needs brand new parts of them, we will rebuild to the customized needs of the clients. Then we can take the turbine similar to be reset to 0 hours of ignition. Priced about 8.5-9.5million Usd Exw China, price and terms can be negotiated to final stage to actual configuration for serious buyers Attached is for your reference of one rebuilding plan.
LC_Guid: |