Name of New Equipment: | 2000GF9-T Natural Gas engine generator set with CNPC L20V190ZLT-2 engine | Brand name of Equipment: | CNPC | P/N of Equipment: | L20V190ZLT-2 | Industry: | Gas Power Generation Industry | Summary Briefs on the equipment: | | Origin of Product: | | Original Packing: | | Warranty: | | Installation, commissioning service: | | Role: | | Already Sold or not: | | Time of first Sold: | | Already sold coutry or region: | | Rough budget or contract value: | 货币选择 | Payment Terms: | | File Link: | CNPC 2000GF9-T Natural Gas Power Plant Quotation .pdf CNPCJCPC 2000GF9-T NATURAL GAS GEN.docx |
2000GF9-T Natural Gas Gas engine with CNPC L20V190ZLT-2 set
Generator 1FC series set 5 Genset Control Panel GPL2000A set 5 Pre-lub oil set 5 Battery Charger set 5 Cooling System Horizontal Radiator set Exhaust pipe and silencer Remark: Delivery date: Three months after contract valid or negotiation by both parties. Terms of Payment: After contract, you should pay our company 30% of the contract amount and payoff the other 70% before delivery. Warranty: One year after delivery or accumulative 1500 hours running time, according to which one comes first. Installation and commissioning: If customer needs our company to do the guiding installation and commissioning, our company will arrange two engineers to do the field service. All the fees including the traffic, living condition and insurance in abroad will be provided by the customer, and customer should pay our engineers 200.00 dollars per day per person. Valid period of the offer �?0 days
LC_Guid: |