Email: [email protected]   WhatsApp/WeChat: +0086-13801218512
  
Homepage   |   Power Generation   |   Top Spare parts   |   spare parts   |   China OEM Equipment and Spare Parts   |   Project Financing    |   Equipments   |   China Small EPC Contractor   |   Transmission   |   Financing-Ebook   |   Contact Us   |   Used Equipment   |   download   |   sitemaps   |   Project-Equipment-Parts-Enquiry   |   供货商Supplier   |   Exchange Link   |   Breaking News  
Mail List

E-mail:

     上方导航  
       Homepage  
       Power Generation  
       Top Spare parts  
       spare parts  
       China OEM Equipment and Spare Parts  
       Project Financing   
       Equipments  
       China Small EPC Contractor  
       Transmission  
       Financing-Ebook  
       Contact Us  
       Used Equipment  
       download  
       sitemaps  
       Project-Equipment-Parts-Enquiry  
       供货商Supplier  
       Exchange Link  
       Breaking News  
     下方导航  

Diesel Generator Proposal

Power Plant Proposal
Required Information for Power Plant Project design and quotation

Home > HomePage > Equipment > Used or Surplus Equipment > GE Gas Turbine - Secondhand 6B Gas Turbine Repair Proposal GE Gas Turbine 6B Gas Turbine

Buyer     Inquiry Basket     Supplier     Register


Secondhand 6B Gas Turbine Repair Proposal GE Gas Turbine 6B Gas Turbine


Name of Used or Surplus Equipment/Project:ect:Secondhand 6B Gas Turbine Repair Proposal
Brand name of Equipment:GE Gas Turbine
P/N of Equipment:6B Gas Turbine
Industry:Gas Power Genration Industry
Summary Briefs on the equipment:1) Proposal A: repair and renovate the gas turbine body, supporting auxiliary engine, control system and electrical system, retrofit capital components of combustion chamber and turbine, non-DLN combustion chamber, single fuel and natural gas;
Origin of Main Product:China;�й�
Year of Production of Main Equipment:
Current Country located:�й� China
Original Packing:
Warranty:
Documents:
Dismantled or on site:
Can be Test Run or Not:
Year of Shutdown:
Year of Overhaul:
Total Operation Hours:
O&M log:
Current Condition:
Dismantling, packing transportation Serviece:
Refurbishment Services:
Site installation and commissioning or Supervision:
Role:
Already Sold or not:
Time of first Sold:
rough budget or contract value in USD:
Payment Terms:
File Link:NO_File

5x6B Gas Turbine Power Plant

Founded on October 8, 1991, 
NG is a well-established Sino-foreign joint
venture located in Shenzhen SEZ (Special Economic Zone). It's a subsidiary of NTC
NTC is a company to co-manufacture heavy gas turbines under the TTA agreement of GE.
At present, NTC is manufacturing and selling 6B.03/6F.01/6F.03/9E.03 heavy-duty gas turbines.
NG main business scope covers areas such as equipment package, installation,
commissioning, custom modification & upgrade (CM&U), inspection and overhauling for gas
turbine and steam turbine power stations.
As the sole distributor of GE gas turbine spare parts in China, 
NG can provide GT spare parts
with best quality and most favorable price. Meanwhile, 
NG also can provide domestic tightening
hardwares, seals and some auxiliary spare parts needed in unit installation and overhauling.
NG possesses a strong professional team with rich experience and proven competence in
gas turbine genset installation and overhauling, and possesses high-tech instruments and
facilities for GT inspection and overhauling as well.
NG has so far been the only eligible EPC company in China for both GT spare parts supply
and GT projects contracting including GT power station overhauling, CM&U, overseas relocation,
installation and commissioning. In spite of numerous difficulties such as incomplete documents
and insufficient equipments, 
NG has successfully undertaken quite a few GT projects such as the
old used GT unit removal, installation, overhauling, commissioning, liquid fuel upgrade to gas for
fuel and control system, GT performance test and operation services for GT power station. EPC
work covers CM&U design, type selection for imported spare parts, import agency, production of
domestic parts, special parts preparation and site construction as well as personnel training.
 our company has 5 used 6B gas turbines and we can sell 5 GT UNITS to you
because several other companies are interested in these 6B gas turbines. If you are interested,
please contact me immediately.

5x6B Gas Turbine Power Plant

Founded on October 8, 1991, 
NG is a well-established Sino-foreign joint
venture located in Shenzhen SEZ (Special Economic Zone). It's a subsidiary of NTC
NTC is a company to co-manufacture heavy gas turbines under the TTA agreement of GE.
At present, NTC is manufacturing and selling 6B.03/6F.01/6F.03/9E.03 heavy-duty gas turbines.
NG main business scope covers areas such as equipment package, installation,
commissioning, custom modification & upgrade (CM&U), inspection and overhauling for gas
turbine and steam turbine power stations.
As the sole distributor of GE gas turbine spare parts in China, 
NG can provide GT spare parts
with best quality and most favorable price. Meanwhile, 
NG also can provide domestic tightening
hardwares, seals and some auxiliary spare parts needed in unit installation and overhauling.
NG possesses a strong professional team with rich experience and proven competence in
gas turbine genset installation and overhauling, and possesses high-tech instruments and
facilities for GT inspection and overhauling as well.
NG has so far been the only eligible EPC company in China for both GT spare parts supply
and GT projects contracting including GT power station overhauling, CM&U, overseas relocation,
installation and commissioning. In spite of numerous difficulties such as incomplete documents
and insufficient equipments, 
NG has successfully undertaken quite a few GT projects such as the
old used GT unit removal, installation, overhauling, commissioning, liquid fuel upgrade to gas for
fuel and control system, GT performance test and operation services for GT power station. EPC
work covers CM&U design, type selection for imported spare parts, import agency, production of
domestic parts, special parts preparation and site construction as well as personnel training.
 our company has 5 used 6B gas turbines and we can sell 5 GT UNITS to you
because several other companies are interested in these 6B gas turbines. If you are interested,
please contact me immediately.

 

Secondhand 6B Gas Turbine Repair Proposal:
���ֵ� 6B ȼ���޸�����
1) Proposal A:  repair and renovate the gas turbine body, supporting auxiliary engine,
control system and electrical system, retrofit capital components of combustion chamber
and turbine, non-DLN combustion chamber, single fuel and natural gas;
A
����: ��ȼ����������޸��ͷ���, ���� ����ϵͳ, ����ϵͳϵͳ����, ȼ���Һ�
͸ƽ���ʱ�����ʹ�÷��޼�, Non-DLN ȼ����, ��ȼ��-��Ȼ��
The details are as follows
������������

���

����

����

����

��λ

���� A

S/N

Description

Description

QTY.

Unit

Option A

1

A040 ���������

self cleaning air filter control box of A040

5

set

Supply new equipment

2

A041 �������ͽ��ܷ��

A041 air inlet system expansion joint & seals

5

set

Supply new equipment

3

A980 ����֧�ܽ��̼�

A980 air inlet system bracket fasteners

5

set

Supply new equipment

4

��������վ APU

Air press unit APU

5

set

Supply new equipment

5

ȼ������������Ԥ���

Foundation embedded parts and anchoring
  parts of Gas turbine unit

5

set

Supply new equipment

6

ȼ������ģ��

Gas turbine foundation template

1

set

Supply new equipment

7

ȼ�����ɼ䷢����ֿ�

acoustical enclosure

5

set

Supply new equipment

8

ȼ����ͨ��ϵͳ����

Ventilation system for gas turbine cabin

5

set

Supply new equipment

9

���ɼ�ͨ��ϵͳ����

Ventilation system of load gearbox room

5

set

Supply new equipment

10

�����Ҹ���

Exhaust chamber modification

5

set

Use old + Modification

11

88TK �ֿ�+������

88TK housing + interconnecting tube

5

set

Supply new equipment

12

�������������޸���

Overhaul and transform oil and gas separator

5

set

Use old + Modification

13

����������������·����

Oil and gas separator connection pipeline
  transformation

5

set

Use old + Modification

14

ˮϴվ

Water Wash station

1

set

Supply new equipment

15

������

Fire control cabinet

5

set

Supply new equipment

16

����������·

Fire interconnecting pipeline

5

set

Supply new equipment

17

������ȴˮ������·

Unit cooling water interconnection pipe

5

set

Supply new equipment

18

ȼ������������۹�·

Gas turbine generator set sewage pipe

5

set

Supply new equipment

19

����ר�ù���

Gas turbine special tool

1

set

Supply new equipment

20

��վ����

Power cable

5

set

Supply new equipment

21

�����ż�

Cable tray

5

set

Supply new equipment

22

������

The control room PEECC

5

set

Supply new equipment

 

Technical Proposal of 6B.03 Gas Turbine Combined
Cycle Power Station
6B.03 gas turbine technology innovation /6B.03
ȼ����������
Main performance parameters under ISO operating conditions, i.e., compressor inlet temperature of
15
��, 60% relative humidity, atmospheric pressure (1.013bar)
�� ISO ����������, ѹ���������¶� 15��, 60%���ʪ��, ����ѹ��(1.013bar)�����µ���Ҫ��
�ܲ���:

fuel ȼ��

Natural gas ��Ȼ��

Light diesel oil �����

The output power �������

42100kW

41160kW

The heat loss rate �Ⱥ���(LHV)

11220 kJ/kWh

11320 kJ/kWh

The heat loss �Ⱥ�(LHV)

472��10kJ/h

466��10kJ/h

The gas temperature ȼ������

1140��

1140��

Exhaust temperature �����¶�

548��

548��

NOX emissions NOX �ŷ�

15 ppm

The exhaust flow ��������

529.2��103kg/h

529.2��103kg/h

GT speed ת��

5163r/min

5163r/min

Fuel consumption ȼ������

12284m3/h

6B.03 Gas turbine PIP Performance Upgrade/6B.03 ȼ�� PIP ��������
l Stage 1 Shroud Abradable Coating ��һ�������������Ƚ�����ĥͿ��
l Stage 2 Nozzle Diaphragm Brush Seal �ڶ������������ˢʽ�ܷ�
l Advanced Aero Stage 3 Bucket and Nozzle for improved performance results: Increased output,
Improved heat rate, reducing fuel costs and CO2/kWh.
��������Ҷ����������Ƚ�����ά���
�����ȼ������. ��Ч��, �����Ⱥ��ʺͶ�����̼�ŷ�
Estimated Performance Improvement �������´�����Ч�� *at ISO conditions, 100% methane

6B.03 Gas turbine 6B.03 ȼ��

Benefits ����

Output (S/C)����

+2.1%

Heat Rate (S/C)�Ⱥ���

-1.8%

 

Note : Efficiency improvement results in exhaust temperature and exhaust energy decrease.
Combined cycle analysis can be provided to estimate overall plant impact.
1. High performance of combined cycle supplementary combustion heating 
����ѭ����
ȼ���ȸ�����
The GAS turbine 6B.03 provides a thermoelectric ratio of more than 300% /6B.03
ȼ�������ṩ����
300%
���ȵ��
Compared with gas turbine with the same level of power, 6B.03 gas turbine has the following
advantages:/
ͬ�ȼ����ʵ�ȼ����Ƚ�, 6B.03 ȼ��������������:
-The heating demand of this project is large, so the waste heat boiler needs to be refired, and
6B.03 has better refiring conditions/
����Ŀ���������, ���ȹ�¯��Ҫ��ȼ, 6B.03 �IJ�ȼ��
������
-The gas turbine exhaust temperature of 6B.03 is low, and the amount of supplementary
combustion is larger when the gas gas temperature is the same. /6B.03
ȼ�������¶ȵ�, ��
ȼ����ͬ�����¶Ȳ�ȼ������;
-6B.03 gas turbine has large exhaust flow and higher supplementary combustion capacity /
6B.03
ȼ������������, ��ȼ��������;
-6B.03 gas turbine has higher oxygen content in exhaust and higher refueling capacity /6B.03
ȼ������������������, ��ȼ��������.
Supplementary combustion performance of 6B.03 gas turbine + heat recover steam generator /
6B.03
ȼ��+���ȹ�¯��ȼ����

Line ���

Description ����

6B.03

1

ISO output
  /ISO
�����ij��� MW

42

2

Average annual air temperature �� (design point)
  /
��������¶���(��Ƶ�)

25.2

3

Local annual output under working conditions
 
��������������� MW

38.009

4

Local annual working exhaust temperature ��
 
����������������¶���

553.3

5

Local annual exhaust flow rate under working conditions   t/h
 
������������������� t/h

489.1

6

Steam production under the same steam parameters
 
��ͬ���������²�����

155

7

Total thermal efficiency %
 
�ܵ���Ч��%

94.35

8

Heat to electricity ratio %
 
�ȵ��%

304.57

2. Performance and engineering applications ҵ��������Ӧ��
l More than a thousand units worldwide ȫ��ǧ̨
l The operation has been proved to be stable and reliable by global owners ��ȫ��ҵ��֤����
���ȶ��ɿ�
l Mature technology ��������
l Low cost parts maintenance and replacement (capital parts, maintenance cycle, maintenance
personnel)
�㲿��ά�޼������ɱ���(�ʱ���, ��������, ������Ա)
Typical layout of 6B.03 gas turbine 6B.03
ȼ�����Ͳ���

6B.03 is widely applicable /6B.03 ���÷�Χ�㷺
l Single cycle, combined cycle power generation ��ѭ��. ����ѭ������
l Provide steam heat source ����. ��ȼ��¯����
l Distributed energy supply �ֲ�ʽ��Դ����
l Power drive ��������
The GAS turbine 6B.03 can run on a variety of fuels/ 6B.03
ȼ�������ڶ���ȼ��
l Natural gas (DLN combustion chamber, standard combustion chamber)��Ȼ��(DLN ȼ����.
��׼ȼ����)
l Natural gas + light diesel, dual fuel ��Ȼ��+�����, ˫ȼ��
l Heavy oil + light diesel ����+�����
l Medium and low calorific value gas fuels (blast furnace gas, coke oven gas, coal chemical
syngas, waste gas, etc.)/
�е���ֵ����ȼ��(��¯��. ��¯ú��. ú�����ϳ���. ��ú����)
3. Introduction of used 6B.03 Gas turbine 
���� 6B.03 ȼ������
Nangang Power has 5 sets second-hand 6B.03 gas turbines, and the status is as follows:/
�ϸ۶���
���� 5 ̨���ֵ� 6B.03 ȼ��, ״̬����:

Content ����

GT6

GT8

GT COD �������Ͷ��ʱ�� In October 2006   In November 2006

Total running hours ������Сʱ�� 71287 65449

Total ignition number �ܵ����� 536 453

The original unit uses fuel ԭ����Ӧ��ȼ�� Syngas + light diesel Syngas + light   diesel

Time of last overhaul ���һ�δ���ʱ�� In August 2015 In April 2015

Stop time ͣ��ʱ�� In July 2017 In   July 2017

Generator model ������ͺ� QFR-50-2 QFR-50-2

Generator speed �����ת�� 3000rpm 3000rpm

Generator cooling mode �������ȴ��ʽ Air cooling ������ȴ Air cooling ������ȴ

 

Generator excitation mode ��������ŷ�ʽ

Brushless excitation ��ˢ����

Brushless excitation ��ˢ����

There are 5 second-hand 6B.03 gas turbines, and the main contents of renovation and repair are as
follows:/
���� 5 ̨���ֵ� 6B.03 ȼ��, �����޸�����Ҫ����:
1) Capital parts options: Non-DLN combustion chamber refurbished parts or new parts can be
selected; Or DLN combustion chamber new parts; The capital parts of the turbine can also be
renovated or brand new;
2) Gas fuel valve station options: DLN fuel valve station, standard combustion system gas fuel
valve station;
3) Load gear box, speed ratio is 5133:3000RPM; Or upgrade to 5163:3000RPM;
4) Upgrade the gas turbine control system to Mark Vie;
5) Replace the generator control panel and protection panel;
6) Replace the intake system with new filter elements and control box;
7) Replace the sound insulation cover with a new one;
8) Replace the ventilation system with new parts;
9) Other necessary replacement parts;
10) Other systems to be added as necessary.
1)
�ʱ�����ѡ��: ����ѡ�� NON-DLN ȼ���ҷ��޼���ȫ�¼�;���� DLN ȼ����ȫ�¼�;͸
ƽ���ʱ�����Ҳ����ѡ�÷��޼���ȫ�¼�;
2)
����ȼ�Ϸ�վѡ��: DLN ȼ�Ϸ�վ, ��׼ȼ��ϵͳ������ȼ�Ϸ�վ;
3)
���ɳ�����, ת�ٱ�Ϊ 5133:3000RPM;���߸�������Ϊ 5163: 3000rpm;
4)
ȼ������ϵͳ����Ϊ Mark Vie;
5)
�����������, �����̸����¼�;
6)
����ϵͳ������о�¼�, �������¼�;
7)
���������ֿǸ����¼�;
8)
ͨ��ϵͳ�����¼�;
9)
������Ҫ�ĸ�������;
10)
������Ҫ���ӵ�ϵͳ.

Nangang Power now has 5 second-hand 6B.03 gas turbines. Performance of gas turbine after
renovation: /
�ϸ۶��������� 5 ̨���ֵ� 6B.03 ȼ��, �����޸���ȼ��������:

Description ����

unit ��λ

ISO ����

Load rate of gas turbine ȼ���ĸ�����

%

100

fuel ȼ��

-

��Ȼ��

The pressure loss ����ѹ��

mmH2O

65

The exhaust pressure loss ����ѹ��

mmH2O

305

Power factor ��������

-

0.8

Gas turbine output ȼ������

kW

39279

The heat loss rate ȼ���Ⱥ���

kJ/kWh

11675

The efficiency of gas turbine ȼ������Ч��

%

30.83

Gas turbine exhaust temperature ȼ�������¶�

��

554.7

Exhaust flow rate of gas turbine ȼ����������

t/h

510.3

NOX emissions NOX �ŷ�

ppm

15

The reference performance conditions are: DLN combustion chamber, new turbine components;
Compressor blades used in the original unit.
Pictures of the gas turbines in the workshop are shown below:
�˲ο�����������: DLN ȼ����. ��͸ƽ����;ѹ����ҶƬʹ��ԭ�����.
ȼ���ڳ������Ƭ����:

 Flange to flange skid for 6B.03


Flange to flange skid for 6B.03


NG is both combustion engine spare parts to provide domestic and gas turbine
power plant project the total package of engineering company, to undertake the following
business: gas turbine generator set relocation, installation, commissioning, maintenance, control
system upgrade, change oil to gas, gas oil, unit performance test and package shipment, import
spare parts selection, local parts manufacturing, the preparation of the special parts, site
construction and training of plant personnel.
NG has the capability of gas turbine transformation design and auxiliary
production, such as housing, ventilation system, intake and exhaust system, control system,
combustion system, low nitrogen combustion transformation, etc. The MS5000 series and 6B
type gas turbine units have been successfully transformed into medium-heat value coke oven
gas units.
NG has provided services for more than 100 power plants and power stations
at home and abroad. Gas turbine models include GE 9E, 6B, 6F, 5000 series gas turbine,
Siemens V94.2 gas turbine, Hitachi H25 gas turbine, ABB GT13E2 gas turbine, Alstom T984 gas
turbine. The power station services also include steam turbines, generators and AC DC motors.
NG�ǹ��ڼ��ȼ�������ṩ��ȼ���糧��Ŀ���ܰ����̹�˾,�н�����ҵ��: ȼ���ֻ�
��������Ǩ, ��װ, ����, ����,����ϵͳ����,�͸���, ������,�����������鼰����,����
����ѡ��,������������,�����������,�ֳ�ʩ�����糧��Ա��ѵ.
NG
����ȼ���ֻ�������ƺ͸�����������,�����ֿ�, ͨ��ϵͳ, ������ϵͳ, ����ϵ
ͳ, ȼ��ϵͳ, �͵�ȼ�ո����;�� MS5000 ϵ�к� 6B ��ȼ���ֻ���ɹ�����Ϊ��������ֵ��¯
ú������.
NG
Ϊ������ 100 ��ҵ糧, ��վ�ṩ�˷���,ȼ���ֻ�������: GE ��˾ 9E, 6B, 6F,
5000
ϵ��ȼ��,������ V94.2 ȼ��,���� H25 ȼ��,ABB ���� GT13E2 ��ȼ��,����˹ͨ T984 ��
ȼ��.�ṩ�ĵ�վ���񻹰����������ֻ�, ���������ֱ���綯����.

Shaanxi Future Energy and Chemical Co., LTD. Yulin Project ����δ����Դ�������޹�˾������
Ŀ:
The 6B.03 gas turbine was manufactured in 2005 and moved from Yanmine In Shandong
province to Yulin in Shaanxi Province. The fuel was changed to the combustion synthesis oil
production process with a heat value of 4000kCal Nm3. The system was completely reformed and
updated, and was put into operation in March 2016. And achieve good economic benefits.

�� 6B.03 ȼ�� 2005 �����,��ɽ������Ǩ����������,ȼ�ϸ��պϳ����͹��ճ۷���,��
ֵ 4000kCal Nm3,ϵͳȫ�����͸���,2016 �� 3 ��Ͷ��,Ŀǰ�Ѿ����� 27500 ��Сʱ,ƽ��ÿ
��ﵽ 8000 Сʱ,��Ϊ���ܼ��ŵ�����,��ȡ�úܺõľ���Ч��

2  Liuzhou STEEL MS6001B Gas turbine relocation and transformation project ���ݸ��� MS6001B
ȼ����Ǩ������Ŀ:
The 6B gas turbine has been put into commercial operation since 2003 and stopped in 2011
after 31,778 hours of operation. Subsequently, the unit was moved from Changzhou Saite to Liuzhou
Iron and Steel Co., LTD. The fuel was changed to coke oven gas fuel with a caloric value of
4100kCal Nm3. The system was completely reformed and updated and put into operation in
November 2012.

�� 6B ȼ���� 2003 �꿪ʼ�»���ʽͶ����ҵ����,���� 31778 Сʱ���� 2011 ��ͣ��.���
���׻���ӳ������ذ�Ǩ�����ݸ���,ȼ�ϸ��ս�¯ú��ȼ��,��ֵ 4100kCal Nm3,ϵͳȫ���
��͸��� 2012 �� 11 ��Ͷ��,Ŀǰ�Ѿ����� 56500 ��Сʱ,ƽ��ÿ��ﵽ 8000 Сʱ,�귢����Լ
2.2
�� kW.h,ȡ�÷dz��ɹ۵ľ���Ч��.

4 sets of 6B gas turbine relocation project of Ghana Ansogu Energy Co., LTD ����Դ���ɰ�����
��˾ 4 �� 6B ȼ����Ǩ��Ŀ:
This project covers 4 sets of 6B gas turbine spare parts procurement; Domestic parts overhaul,
oil to gas, control system and electrical upgrade, renovation, painting, packaging; Foreign parts of
the installation, debugging and other engineering content. Since it was put into commercial
operation at the end of 2010, it has generated 1.2 billion kW. H of electricity annually, providing
nearly 30percent  of the electricity for Ghana s national grid. It is the best local power station project.
����Ŀ������ 4 �� 6B ȼ�������ɹ�;���ڲ��ֵĴ���, �͸���,����ϵͳ�͵�����������,
����, ����, ��װ;���ⲿ�ֵİ�װ, ���Եȹ�������.2010 ���Ͷ����ҵ��������,ÿ�귢����
12
�� kW.h,Ϊ���ɹ��ҵ����ṩ�� 30percent �ĵ���,�ǵ������ŵĵ�վ��Ŀ.

5. Summary of cogeneration schemes �ȵ���������С��
1) The used 6B.03 gas turbine, the compressor blade is not replaced, the performance can
reach 95percent  of the new machine; If the compressor stator blade replacement,
performance can also be improved.
2) New machine single set combined cycle performance (ISO): gas turbine output
41.1MW, combined cycle output 63MW, combined cycle thermal efficiency 49percent ;
3) Supplementary combustion capacity and efficiency of 6B.03 gas turbine are better than
other gas turbines of the same grade;
4) Low maintenance cost, more than 1000 sets of users worldwide, mature equipment
technology, stable and reliable performance, low price of service spare parts;
5) Short maintenance cycle, short spare parts supply cycle;
6) In conclusion, 6B.03 gas turbine is suitable for a variety of fuel requirements and is very
suitable for cogeneration units, especially the best choice for projects with high
thermoelectric ratio requirements.
1)
������ 6B.03 ȼ��,ѹ����ҶƬ�������������,���ܿ��Դﵽ�»��� 95percent ;���ѹ��
����Ҷ����,���ܻ��������.

2) �»���������ѭ�����ܣ�ISO��: ȼ������ 42.1MW,����ѭ������ 63MW,����ѭ����
�� 49percent ;
3) 6B.03
ȼ����ȼ������Ч������ͬ�ȼ�����ȼ��;
4)
ʹ��ά���ɱ���,ȫ�򳬹� 1000 ̨���û�,�豸��������,�����ȶ��ɿ�,���񱸼�
�۸��;
5)
ά�����ڶ�,������Ӧ���ڶ�;
6)
��֮,6B.03 ȼ�������ڶ���ȼ������,�Ƿdz��ʺ��ȵ������Ļ���,�ر��Ƕ��ȵ��
Ҫ��ϸߵ���Ŀ�����ѡ��.
6. Technical proposal for 6B.03 gas turbine restoration  6B.03 ȼ���ָ�������������:
1) A proposal: repair and renovate the gas turbine body, supporting auxiliary engine, control
system and electrical system, retrofit capital components of combustion chamber and
turbine, non-DLN combustion chamber, single fuel and natural gas;
2) B proposal: Repair and renovate the gas turbine body, supporting auxiliary machinery,
control system and electrical system. The capital parts of the turbine shall use the revised




LGPID:202303150209
Pubdate: 2023/4/13 17:00:11


Click add item to inquiry basket      Click Copy Shared LinksInquiry Basket

Pageviews: 3



Statement: Any reference to the OEM part number or other OEM information is for the purpose of identification only and does not imply that the part was manufactured by the Original Equipment Manufacturer.

All the brands and trademarks in the whole domain of the website belong to their own owners and does not mean that we are their authorized partner or dealer. All the information in this website is only for reference, we do not assure its accuracy.

This statement supersedes all other claims and statements on all pages, files, pics and information within this whole web domain.

Copyright©2006-2019 Leda Greenpower Beijing ICP Reg. No: 10010978.   Fax:0086-10-84161062  E-mail: [email protected]

JingGongWangAnBei: 11010802035914 Hao