Overview:

Fuel used will be Natural Gas.  (i.e. ~1 mmscmd)
The total fresh water requirement is approx. 1000 cu. m per day at full load
The gas turbines, OTSG’s, steam turbine and their auxiliaries are all mounted on a single floating barge.
Compact Barge of size 106 M x 55M  x 6M having a draft range 1.2 M to of 5.6 M with minimum onshore facilities required.
The barge mounted combined cycle power plant has ;

4 nos. 47 MW- LM6000 PC aero derivative gas turbines.

4 nos. Once Through Steam Generators.

1 no 53 MW rated output steam turbine  and generator.

Minimum onshore facilities with following major systems;
Switchyard for Power Evacuation, 415V  MCC for DM Plant etc.
Fuel treatment and forwarding
Water Treatment Plant and DM plant
Fire Fighting System

Gas Turbine

Make

GE

Model

LM 6000 PC Sprint

Capacity

46.64 MW

Gas turbine Generator is open air-cooled, synchronous type and totally enclosed

5 Stage Low Pressure Compressor �?Compression ratio is 2.4:1, 14 Stage High Pressure Compressor �?Compression ratio is 12.5:1

Steam Turbine

Make

ABB

Capacity

53.58 MW

40 Stage Dual Pressure Condensing type Steam Turbine

2 Pole Generator with air cooling for Stator & Rotor winding

Compressed Air System

3 X100% Screw Type Air Compressors with 2 x100% desiccant type dryers

Capacity : 12.7 Nm3/min and 8.64 bar g discharge pressure

Once through Steam Generator

Make

IST Canada

Steam Parameter

Pressure/ Temperature

HP Steam

59.6 bar / 419 Deg C

LP Steam

4.7   bar / 240 Deg C

Capacity

46.64 MW

Dual Pressure OTSG installed at the exhaust of the Gas Turbine

Dry Running Capability

Chillers

Used for Cooling the Gas turbine intake air for increasing the Gas turbine output

2 nos /machine with an Inlet Temp : 7.1Deg C

Chiller Capacity : 1210 TR

Plant Electrical system

Power is generated at 11 KV and Evacuated at 220 KV

2  Nos. of Step-up transformer  11KV /220KV ( 1 each for 2 Gas turbines)  and 1 Step-up transformer for Steam turbine 

2 Nos. of Unit Auxiliary transformers  for stepping down from 11KV to 6.6 KV for running Plant auxiliaries

4 Nos. of  Step-down transformers called Auxiliary Transformers for  stepping down the 6.6KV to 415 V

Other Plant Facilities

 Demineralization Plant: Demineralization plant (DM plant) produces de-mineralized water for generating steam in OTSG.

Cooling Water System:  Cooling Water System suitable for river/sea water which can be connected  to Closed Circuit Cooling Water system onshore if required.