A 1-item No.1 GAS TURBINE GENERATOR with all GTG auxiliary equipment
2- item No.2 GAS TURBINE GENERATOR with all GTG auxiliary equipment 3- 1 # steam turbine generator and auxiliary equipment 4- 2# steam turbine generator and auxiliary equipment 5- 1# ,2# ,3,# main transformer B Dismantling, packing and land transprotation in China C TOTAL FOB SHANGHAI PORT PRICE D 6- balck start Diesel Generator set with the auxiliary equipment (Option)
Price :
A=15,370,000.00 USD
B=1,378,000.00 USD
C=16,748,000.00 USD
D=1,590,000.00 USD
REF. 620140404
Main Equipment list of Used GE Gas Turbine Power Plant in China
Name |
Qty |
Model |
specification |
Manufacturer |
Date of putting intooperating |
No.1 and No.2 Gas Turbine |
2 |
MS6551�?/FONT>B),dual fuel (gas, light diesel) |
38.72MW |
American GE |
1996 |
No.1 and No.2 Steam Turbine |
2 |
C15-3.43/0.981-3 |
15MW;50t/h |
Nanjing Turbine & Electric Machinery (Group) Co., Ltd. |
1998 |
No.1 Heat recovery Boiler |
1 |
Q394/539(201)-66(9.5)-3.82/450(0.25) |
66t/h |
703 |
1998 |
No.2 Heat Recovery Boiler |
1 |
Q391/542-66(9.5)-3.82(0.25)/450(138) |
66t/h |
Hangzhou Boiler |
1998 |
No.1 and No.2 auxiliary oiled fired boiler |
2 |
UG-35/3.82-Y2 |
35t/h |
Wuxi Boiler |
1998 |
Generator for gas turbine |
2 |
6A3 |
45400KVA |
American GE |
1996 |
Generator for steam turbine |
2 |
QFW-15-2A-10.5KV |
15MW |
Nanjing Turbine & Electric Machinery (Group) Co., Ltd. |
1998 |
DCS control system |
1 |
AS220EA(TELEPERM ME) |
|
Siemens (Nanjing) |
1998 |
Control system of gas turbine |
2 |
SPEEDTRONIC™ Mark V |
|
American GE |
1996 |
Control system for exciter of generator for gas turbine |
2 |
EX2000R |
|
American GE |
1996 |
Starting motor for gas turbine |
2 |
5K511JN194A |
600hp,3000V, 90.1A |
American GE |
1996 | |