TECHNICAL CONDITION OF THE QUOTATION FOR CROSS NATIONS POWER SYSTEM INTERCONNECTION PROJECT
1�?nbsp; The locations of the converter station and ground-electrode should be provided by the owner (excluding construction site expropriation and clearing fees)
2�?nbsp; Site is flat, excavation and backfilling is unnecessary for the contractor.
3�?nbsp; The ultimate allowable bearing capacity characteristic value of the undisturbed soil layer is not less than 400kPa, subsoil treatment is unnecessary.
4�?nbsp; Maximum wind speed (10 minutes gust average a year) is not more than 25m/s in reappearing period of 50 years.
5�?nbsp; Horizontal seismic acceleration is 0.1g.
6�?nbsp; The Resistivity of soil in the area of the electrode should not be more than 100Ω·m
7�?nbsp; ESDD of the AC/DC support insulator in the converter station should not be more than 0.025/0.05mg/cm2.
8�?nbsp; The station water source shall be from tape water and 1.0m far from the bounding wall of the converter station, not be from a well.
9�?nbsp; Water Drainage System will be 1.0m far from of the bounding wall of the converter station. Water Drainage pipe out of the converter station is not considered.
10�?nbsp; The station service power will be provided by owner and be to 1.0m outside of the bounding wall.
11�?nbsp; The type of converter transformer adopts 1 phase 3 Winds.
12�?nbsp; Dispatch Automation:This project only includes the remote site station and the corresponding network access equipments, not includes the dispatch center device.
13�?nbsp; Electric energy metering system:This project includes only site meter electric energy processor and screen, not including electricity billing master terminal device.
14�?nbsp; Line protection:This project only includes the converter station line protection devices, not including the protection line opposite station.
|