| 
       
 
			 |  |  | 
			
			
			
			
			
				
					
						
						
						
				
  |  
					
						FOR SALE ALSTOM 150Mw GAS TURBINE 500Mw STEAM TURBINE + GENERATOR
						
	
	 
	   
	      
	  |   
 
 
 
 
 
     
  
 
 
  
 
| 
 Gas Turbine:  |  
| 
 Manufacturer:   | 
 Alstom/ABB, Model GT13E  |  
| 
 Capacity:   | 
 150,000 kW (150MWE/18,5 MVA, cos phi 0,8)  |  
| 
 Frequency:   | 
 50 Hz  |  
| 
 Year:   | 
 1988  |  
| 
 Speed:   | 
 3000 RPM  |  
| 
 Fuel:   | 
 Gas  |  
| 
 Last C-inspection:   | 
 2004  |  
| 
 Hours:   | 
 OH 66.200 EOH 95.644 Starts 1.456 Trips 296  |  
| 
 Emission:   | 
 NOx 75 mg/Nm3  |  
| 
 Efficiency:   | 
 34.56%  |  
| 
 Additional equipment Kawasaki Ammonia De-Oxidation  
Method, DLN Combustor Technology, EV Type Burners. Misc.  
spare parts. 
  
Note: New EV burner unit has been installed in 1996  |  
| 
 Turbo generator  |  
| 
 Manufacturer:   | 
 ABB  |  
| 
 Model:  | 
 WTAL 534  |  
| 
 Serial nr.:  | 
 GM 204791  |  
| 
 Capacity:  | 
 187.500 KVA  |  
| 
 Speed:  | 
 3000 RPM  |  
| 
 Volt:  | 
 15.000 V  |  
| 
 Frequency:  | 
 50 Hz  |   
 
| 
 Steam turbine:   |  
| 
 Manufacturer:  | 
 Alstom/ABB  |  
| 
 Licensee:  | 
 RDM  |  
| 
 Manufacture year:  | 
 1978  |  
| 
 Hours:  | 
 146.935 OH; Starts 1.125; Trips 99  |  
| 
 Type:  | 
 Axial Excess Pressure  |  
| 
 Execution:  | 
 Condensation Turbine  |  
| 
 Construction Type:  | 
 Multi-Part  |  
| 
 Output, net:  | 
 approx. 511 MW  |  
| 
 Output, gross:  | 
 approx. 527 MW  |  
| 
 Speed (nominal):  | 
 3300 RPM (10%)  |  
| 
 Speed:  | 
 3300 RPM (10%) / 3360 RPM (12%)  |  
| 
 Number of taps:  | 
 7  |  
| 
 Make:  | 
 BBC (HP-MP-LP)  |  
| 
 Type:  | 
 D4 Y 456 A  |  
| 
 Extractions:  | 
 0,23 / 0,72 / 1,51 / 4,9 / 11 / 22,5 bara  at 62,9 / 90,2 / 130,2 / 242 / 437 °C.  |  
| 
 Efficiency:  | 
 99,8%  |  
| 
 Generator:  | 
 500MWE/625MVA/cos phi 0,8  |  
| 
 Voltage:  | 
 21 KV  |  
| 
 Maintenance:  | 
 last retrofits: LP2005, MP2004, HP2002  |  
| 
 Condenser:  | 
 water cooled with vacuum 96,4 %  |  
| 
 Transformers:  |  
| 
 GT trafo:  | 
 21KV -> 163KV  |  
| 
 EB trafo:  | 
 10KV/ 3KV/ 400V en 35 MVA  |  
| 
 Operating hours:  | 
 148.886 for boiler & steam turbine   |  
| 
 Fuel consumption:  | 
  /DIV>  |  
| 
 - GT 46.000Nm3/hr,  | 
  /DIV>  |  
| 
 - Boiler solo 86.000Nm3/hr /109 mt   |  
| 
 HFO (at 40,74 MJ/kg) Combi 132.000 Nm3/hr,  |  
| 
    | 
    |  
| 
 - HFO specification:  | 
  /DIV>  |  
| 
 HFO sec.6500 RI/37 grdC / max S 2%.  |   
 
| 
 Boiler at 100% load:  |  
| 
 Make/type:  | 
 Schelde / C-E steam boiler with forced circulation, single reheat, and overpressure furnace.  |  
| 
 Live steam:  | 
 188 bar / 540 °C  |  
| 
 Capacity:  | 
 1610 mt/hr  |  
| 
 Fuel:   | 
 Gas / HFO  |  
| 
 Burnertype:   | 
 Dual fuel: Tangential arrangement   |  
| 
 Emission:   | 
 NOx 90 mg/Nm3  |  
| 
 Efficiency:   | 
 Solo steam turbine operation 40%. In combination with gas turbine 43%  |  
| 
 Eco inlet:   | 
 263 °C  |   
 |    |   
 
 
 
 
 
  
 
   |    
	
	   
	 
 
		
						
						 | 
					 
				 
 
	
	
 
  |