 1.  | 
 The main equipment  | 
    | 
    | 
    | 
    | 
    | 
| 
 1  | 
 SF6 gas pillar type circuit breaker   | 
 Three phase power circuit breaker SF6(Three pole operated), 550 KV ,  4000 A, 63 KA, with operating mechanism, with central cubicle, with steel structure, complete as per chapter CB  | 
 set  | 
 9  | 
 95.00   | 
 855.00   | 
 Contain steel bracket, don't offer with close brake resistance  | 
| 
    | 
 SF6 gas pillar type circuit breaker   | 
 Three phase power circuit breaker SF6(Three pole operated), 420 KV ,  4000 A, 50 KA, with operating mechanism, with central cubicle, with steel structure, complete as per chapter CB  | 
 set  | 
 3  | 
 95.00   | 
 285.00   | 
 Price include steel stents  | 
| 
    | 
 SF6 gas pillar type circuit breaker   | 
 Three phase power circuit breaker SF6(Three pole operated), 245 KV ,  3150 A, 50 KA, with operating mechanism, with central cubicle, with steel structure, complete as per chapter CB  | 
 set  | 
 1  | 
 29.00   | 
 29.00   | 
 Price include steel stents  | 
| 
 2  | 
 Single grounding isolating switch  | 
 Three phase disconnecting switch, 550 KV, 4000 A, with operating  mechanism (motor operated),  one earthing switch  (motor operated) ,complete as per chapter DIS.  | 
 set  | 
 18  | 
 20.80   | 
 374.40   | 
 Don't strip steel stents   | 
| 
 3  | 
    | 
 The same as item 1 but with earthing system  | 
 set  | 
 6  | 
    | 
 0.00   | 
 Said is grounding switch?   | 
| 
 4  | 
 Isolating switch   | 
 Three phase disconnecting switch, 420 KV, 3150 A, with operating  mechanism (motor operated),  one earthing switch  (motor operated) ,complete as per chapter DIS.  | 
 set  | 
 6  | 
 8.00   | 
 48.00   | 
 Don't strip steel stents   | 
| 
 5  | 
 Isolating switch   | 
 The same as item 1 but with earthing system  | 
 set  | 
 3  | 
    | 
 0.00   | 
 Said is grounding switch?   | 
| 
 6  | 
 Isolating switch   | 
 Three phase disconnecting switch, 245 KV, 3150 A, with operating  mechanism (motor operated),  one earthing switch  (motor operated) ,complete as per chapter DIS.  | 
 set  | 
 4  | 
 1.50   | 
 6.00   | 
 Don't strip steel stents   | 
| 
 7  | 
 Isolating switch   | 
 The same as item 1 but with earthing system  | 
 set  | 
 1  | 
    | 
 0.00   | 
 Said is grounding switch?   | 
| 
    | 
 Current transformer  | 
 Single pole current transformer, 500 KV, suitable for line feeder with steel structure (4 core - 20 VA), complete as per chapter CT (3000/2500/2000/1250/750/1 A)  | 
 set  | 
 27  | 
 10.00   | 
 270.00   | 
    | 
| 
    | 
 Current transformer  | 
 Single pole current transformer, 400 KV, suitable for line feeder with steel structure (4 core - 20 VA), complete as per chapter CT (2000/1500/1000/500/1 A)  | 
 set  | 
 9  | 
 8.50   | 
 76.50   | 
    | 
| 
    | 
 Current transformer  | 
 Single pole current transformer, 245 KV, suitable for line feeder with steel structure (5,6 core - 30 VA), complete as per chapter CT (2400/1200/600/1 A)  | 
 set  | 
 9  | 
 4.00   | 
 36.00   | 
    | 
| 
 8  | 
 Capacitive voltage transformer is presented   | 
 Single pole capacitive voltage transformer, 500 KV with steel structure,630/1050/1425 A,Vrms:500000/v3 & 110/v3, Class:0.2+3p,30 VA  | 
 set  | 
 23  | 
 6.30   | 
 144.90   | 
    | 
| 
 9  | 
 Capacitive voltage transformer is presented   | 
 Single pole capacitive voltage transformer,400 KV with steel structure,630/1050/1425 A,Vrms:400000/v3 & 110/v3, Class:0.2+3p,30 VA  | 
 set  | 
 12  | 
 4.35   | 
 52.20   | 
    | 
| 
    | 
 Capacitive voltage transformer is presented   | 
 Single pole capacitive voltage transformer, 245 KV with steel structure,460/-/1050 A,Vrms:220000/v3 & 110/v3, Class:0.2+3p,30 VA  | 
 set  | 
 3  | 
 2.50   | 
 7.50   | 
    | 
| 
 2.  | 
 Site service charge  | 
    | 
    | 
    | 
    | 
    | 
| 
    | 
 The factory and field training  | 
    | 
    | 
    | 
 free  | 
    | 
    | 
| 
    | 
 Technology liaison meeting  | 
    | 
    | 
    | 
 free  | 
    | 
    | 
| 
    | 
 On-site technical service charge   | 
    | 
 Day/people   | 
 260  | 
 0.03  | 
 7.8  | 
    | 
| 
    | 
 Foreign round-trip tickets  | 
    | 
 people  | 
 8  | 
 0.5  | 
 4  | 
    | 
| 
 3.  | 
 Recommend spare parts and special tools   | 
    | 
    | 
    | 
    | 
    | 
| 
 1  | 
 550KV circuit breaker spare parts  | 
    | 
    | 
    | 
    | 
    | 
| 
    | 
 opening &closing coils  | 
    | 
 set  | 
 1  | 
 0.6  | 
    | 
    | 
| 
    | 
 motor  | 
    | 
 set  | 
 1  | 
 0.35  | 
    | 
    | 
| 
    | 
 SF6 density  | 
    | 
 set  | 
 1  | 
 0.7  | 
    | 
    | 
| 
    | 
 air switch  | 
    | 
 set  | 
 1  | 
 0.03  | 
    | 
    | 
| 
    | 
 touching  | 
 | 
 set  | 
 1  | 
 0.05  | 
    | 
    | 
| 
    | 
 traveling switch  | 
    | 
 set  | 
 1  | 
 0.01  | 
    | 
    | 
| 
    | 
 filling value  | 
    | 
 set  | 
 1  | 
 0.15  | 
    | 
    | 
| 
 2  | 
 245KV circuit breaker spare parts  | 
    | 
    | 
    | 
    | 
    | 
| 
    | 
 opening &closing coils  | 
    | 
 set  | 
 1  | 
 0.4  | 
    | 
    | 
| 
    | 
 touching  | 
    | 
 set  | 
 1  | 
 0.05  | 
    | 
    | 
| 
 3  | 
 special tools for circuit breaker  | 
    | 
    | 
    | 
    | 
    | 
| 
    | 
 filling value  | 
    | 
 set  | 
 1  | 
 0.2  | 
    | 
    | 
| 
    | 
 SF6 filling &refilling device  | 
    | 
 set  | 
 1  | 
 3  | 
    | 
    | 
| 
    | 
 SF6 leakage device  | 
    | 
 set  | 
 1  | 
 1  | 
    | 
    | 
| 
    | 
 sf6 mouisture device  | 
    | 
 set  | 
 1  | 
 1.5  | 
    | 
    | 
| 
    | 
 Mechanical properties test device  | 
    | 
 set  | 
 1  | 
 1.5  | 
    | 
    | 
| 
 4  | 
 550KV disconnector spare parts  | 
    | 
    | 
    | 
    | 
    | 
| 
    | 
 motor  | 
    | 
 set  | 
 1  | 
 0.5  | 
    | 
    | 
| 
    | 
 opening coils  | 
    | 
 set  | 
 1  | 
 0.05  | 
    | 
    | 
| 
    | 
 closing coils  | 
    | 
 set  | 
 1  | 
 0.05  | 
    | 
    | 
| 
    | 
 traveling switch  | 
    | 
 set  | 
 1  | 
 0.02  | 
    | 
    | 
| 
    | 
 opening &closing coils  | 
    | 
 set  | 
 1  | 
 0.05  | 
    | 
    | 
| 
    | 
 vacumn auxilary switch  | 
    | 
 set  | 
 1  | 
 0.1  | 
    | 
    | 
| 
    | 
 Total  | 
    | 
    | 
    | 
    | 
 2196.30   | 
    | 
| 
    | 
 Note:  | 
 1, valIdity date quotation 4 months; (we will provide the installation and debugging of all necessary with random spare parts, etc.)   | 
| 
    | 
    | 
 2, delivery date: drawings confirming 3 months after;   | 
| 
    | 
    | 
 3, this offer for the domestic main port to port price, including export packing and domestic freight insurance.   |