Home > Used Equipment - 3 New GE Frame 9E TRIFUEL Gas Turbine Generators


 

3 New GE Frame 9E TRIFUEL Gas Turbine Generators

3 New GE Frame 9E TRIFUEL Gas Turbine Generators

1. Tri Fuel Technology, Standard Combustors capable of Natural Gas, Diesel and HFO operation with water injection skids for NOx control.

2. Andritz Hydro/Elin Austria 50 Hz Static Excited, Air Cooled Generators
3. Dedicated Wash Skids 1 per GT capable of simultaneous fully automated turbine/compressor washing for HFO ops
4. Air Inlet Filters consist of high performance synthetic design
5. Majority of interconnecting piping, electrical and I&C materials are included in GE Scope and provided.
6. Liquid Fuel Inlet Filters: HFO and Diesel/LFO inlet filters are duplex washable mesh type i.e. No Paper Element Fuel Oil Filters, moreover HFO inlet filters are selfZcleaning type.
7. State of the Art GE Mark VIe Turbine Controls allow for fuel changeover from Gas to Diesel, Diesel to HFO and vice versa on reduced load while synchronized. 
8. Unit 1 and 2 delivered ExWorks on 25 February and 15 March  2013. These units are currently in storage and still under GE
custody. Unit 3 Unit to be delivered to storage in April 2013.
9. Units will stay under GE custody for FCA delivery to A Power until end of May 2013.
10. Consolidated cargo by port consists of:
Antwerp: 454 pieces, 10,349m3, 2,538MT
Shanghai: 177 pieces, 628m3, 969MT
Bombay: 15 pieces, 174m3, 27MT

Details of the Scope of Supply:

Description
Unit 1 / 9E tri-fuel ability PRICE (€uro)
Gas Turbine
Generator 23,666,667
Auxiliary Module
Other Material Shipped Directly (MSD)
Embedded Parts
Piping
Cables
Unit 2 / 9E tri-fuel ability
Gas Turbine
Generator 23,666,667
Auxiliary Module
Other Material Shipped Directly (MSD)
Embedded Parts
Piping
Cables
Unit 3 / 9E tri-fuel ability
Gas Turbine
Generator 23,666,667
Auxiliary Module
Other Material Shipped Directly (MSD)
Embedded Parts
Piping
Cables
Additional Scope
a) Addition of armored LV cables between GE equipment;
b) Addition of piping between GE equipment;
c) Addition of historian;
d) Removal of generator circuit breaker and associated IPB
(Insulated phase bus duct).
3) Additional - two additional washing skid.
3,250,000
4) Additional:
• Three (3) HFO Fuel Self Cleaning Filter Skids
• Three (3) Stainless Steel washable filtration cartridge for LDO
filtration skids
• Additional capacity on the three (3) washing skids
5) Additional price for Model Based Control (MBC)
6) Automatic water wash (excluding installation)
TOTAL SELLING PRICE (in Euros) 74,250,000

 