Works |
|
|
Design and construction |
|
Data collection, topographic survey, soil boring log |
|
Pilling |
|
Permanent project fence and landscaping in the project site |
|
External road outside project boundary |
|
Site clearing, soil leveling, soil compaction (only in biogas production and upgrading system construction boundary) |
|
Conceptual and detailed design on civil/structure |
|
Conceptual and detailed design on process and M&E |
|
Temporary site camp area |
|
Civil work of tanks and buildings inclusive of foundation, slabs, walkway, concrete lining in operating area |
|
Silage yard |
|
Internal road inside project boundary |
|
Construction and project management |
|
Mechanical installation |
|
Piping installation ( materials and biogas piping) within project area |
|
Electrical installation within the project area |
|
High Load Reator Insulation |
|
Biogas Upgrading |
|
As-built drawing(process and M&E) |
|
Landscaping (only in biogas production and upgrading system) |
|
Seed sludge |
|
Seed sludge procurement |
|
Seed sludge transfer to application point |
|
Seed sludge testing and recommendation |
|
Earth works |
|
Procurement of soil |
|
Soil filling |
|
Removal of existing structure and foundation in the project site (if any) |
|
Piping System |
|
Piping system within the project boundary( substrate and biogas piping) |
|
Valve System |
|
Valve system within the project boundary( substrate and biogas) |
|
Connection point |
|
Feedstock inlet |
|
Transfer feedstock to solid feeder |
|
Solid waste outlet |
|
Transfer & disposal excess sludge from separator |
|
Outlet pipe |
|
Filtrate water from pumpto disposal point or liquid fertilizer point |
|
Biogas piping |
|
Utilities |
|
Lightning protection system within the project area |
|
Lighting within the project area (MCC building) |
|
Water supply |
|
Temporary water supply to the project area |
|
Water bills during project construction |
|
Water bills during commissioning, startup and operation |
|
Water supply system (Groundwater + multimedia filter) |
|
Water supply main pipe to the project area |
|
Electrical |
|
Request local power bureau on temporary import energy meter |
|
Temporary electricity supply within the project area |
|
Temporary electricity bills during project during construction and commissioning |
|
Install permanent energy meter |
|
Permanent electricity bills during startup, training and operation |
|
Transformer for biogas production plant |
|
electrical control cabinets, instruments( substrate and biogas) |
|
Cables, Lightning Protection System |
|
Low voltage main cable (415V) to the MCC of the project |
|
Grid connection from riser pole to Transformer in front of the project area |
|
Commissioning and startup |
|
Chemical for analysis of substrate and biogas after first use or after startup to full load |
|
Allocate staff to operate the plant since the startup phase |
|
Provide necessary chemical for commissioning, startup and operation (not for laboratory analysis) |
|
Process commissioning and startup guidance |
|
Training on how to operate, startup and trouble shooting |
|
Provide operating and maintenance manual |
|
Provide apparatus for laboratory analysis FOS,TAC,PH,TS,VS,NH4-N,Individual Acids etc. |
|
Provide chemical for laboratory analysis |
|
Other works |
|
Application to acquire necessary permits and licenses for project execution |
|
Finding an area for disposal of construction waste, soil or other kinds of waste |
|
Wearing parts and consumables |
|
Solid digestate storage, handling and disposal |
|
Wheel loader |
|
Energy crop cultivation, harvesting, transportation and feeding to the biogas production system |
|
Assist in documents and drawing preparation for application of permits or licenses necessary for project execution |
|
Fuel for operation of the hot water boiler |
|
Truck scale (weighbridge) |
|
Office building for staff with meeting rooms, toilet |
|
Machinery store to put in wheel loader and trucks |
|
Biogas Upgrading buildings with control room, laboratory |
|