Serial Number | Equipment Name | Installed Quantity | Operating Quantity | Equipment Capacity Pe(kW) | Equipment Capacity Pe(kW) | Equipment Capacity Pe(kW) | Demand Factor | Power Factor |
| Calculated Load | Calculated Load | Calculated Load | Calculated Load | Operating Time (h) | Daily Power Consumption (KW·h) |
|
|
|
|
|
|
|
|
|
| P30 | Q30 | S30 | I30 |
|
|
|
|
|
| Single Unit | Installed | Operating | kx | cosφ | tgφ | (kW) | (kVar) | (kVA) | (A) | h | KW·h |
1 | Manure Digester in Manure Pit | 2 | 2 | 15.0kW | 30 | 30 | 0.8 | 0.8 | 0.75 | 24.00 | 18.00 | 30.00 | 45.58 | 8.00 | 192.00 |
2 | Grille Machine | 2 | 2 | 1.1kW | 2.2 | 2.2 | 0.8 | 0.8 | 0.75 | 1.76 | 1.32 | 2.20 | 3.34 | 8.00 | 14.08 |
3 | First - stage Sand Removal Tank Mixer | 6 | 6 | 4.0kW | 24 | 24 | 0.8 | 0.8 | 0.75 | 19.20 | 14.40 | 24.00 | 36.47 | 8.00 | 153.60 |
4 | First - stage Sand Removal Tank Sand Remover | 2 | 2 | 13.0kW | 26 | 26 | 0.8 | 0.8 | 0.75 | 20.80 | 15.60 | 26.00 | 39.50 | 8.00 | 166.40 |
5 | First - stage Sand Removal Tank Discharge Pump | 3 | 2 | 22.0kW | 66 | 44 | 0.8 | 0.8 | 0.75 | 35.20 | 26.40 | 44.00 | 66.85 | 7.00 | 246.40 |
6 | Pipeline Crusher | 3 | 2 | 2.2kW | 6.6 | 4.4 | 0.8 | 0.8 | 0.75 | 3.52 | 2.64 | 4.40 | 6.69 | 7.00 | 24.64 |
7 | Hydrolysis Sand Removal Tank Mixer | 4 | 4 | 18.5kW | 74 | 74 | 0.6 | 0.8 | 0.75 | 44.40 | 33.30 | 55.50 | 84.33 | 24.00 | 1065.60 |
8 | Anaerobic Feeding Pump | 5 | 4 | 7.5kW | 37.5 | 30 | 0.8 | 0.8 | 0.75 | 24.00 | 18.00 | 30.00 | 45.58 | 14.00 | 336.00 |
9 | Anaerobic Tank Mixer | 6 | 6 | 30.0kW | 180 | 180 | 0.6 | 0.8 | 0.75 | 108.00 | 81.00 | 135.00 | 205.12 | 24.00 | 2592.00 |
10 | Anaerobic Tank Discharge Pump | 5 | 4 | 7.5kW | 37.5 | 30 | 0.8 | 0.8 | 0.75 | 24.00 | 18.00 | 30.00 | 45.58 | 14.00 | 336.00 |
11 | Anaerobic Tank Discharge Pump | 3 | 2 | 15.0kW | 45 | 30 | 0.8 | 0.8 | 0.75 | 24.00 | 18.00 | 30.00 | 45.58 | 14.00 | 336.00 |
12 | Solid - Liquid Separator | 4 | 4 | 5.5kW | 22 | 22 | 0.8 | 0.8 | 0.75 | 17.60 | 13.20 | 22.00 | 33.43 | 14.00 | 246.40 |
13 | Biogas Slurry Temporary Storage Tank Mixer | 1 | 1 | 3.0kW | 3 | 3 | 0.8 | 0.8 | 0.75 | 2.40 | 1.80 | 3.00 | 4.56 | 14.00 | 33.60 |
14 | Solid - Liquid Separation Feeding Pump | 5 | 4 | 7.5kW | 37.5 | 30 | 0.8 | 0.8 | 0.75 | 24.00 | 18.00 | 30.00 | 45.58 | 14.00 | 336.00 |
15 | Filtrate Tank Mixer | 1 | 1 | 4.0kW | 4 | 4 | 0.8 | 0.8 | 0.75 | 3.20 | 2.40 | 4.00 | 6.08 | 15.00 | 48.00 |
16 | Filtrate and Recirculation Pump | 2 | 1 | 22.0kW | 44 | 22 | 0.8 | 0.8 | 0.75 | 17.60 | 13.20 | 22.00 | 33.43 | 15.00 | 264.00 |
17 | Wet Desulfurization System | 2 | 2 | 38.0kW | 76 | 76 | 0.8 | 0.8 | 0.75 | 60.80 | 45.60 | 76.00 | 115.47 | 24.00 | 1459.20 |
18 | Biogas Air - dryer | 2 | 2 | 15.0kW | 30 | 30 | 0.8 | 0.8 | 0.75 | 24.00 | 18.00 | 30.00 | 45.58 | 24.00 | 576.00 |
19 | Generator Boosting Fan | 2 | 1 | 30.0kW | 60 | 30 | 0.8 | 0.8 | 0.75 | 24.00 | 18.00 | 30.00 | 45.58 | 24.00 | 576.00 |
20 | Biogas Generator and Waste Heat Utilization System | 1 | 1 | 91.0kW | 91 | 91 | 0.8 | 0.8 | 0.75 | 72.80 | 54.60 | 91.00 | 138.26 | 24.00 | 1747.20 |
21 | Biogas Generator and Waste Heat Utilization System | 1 | 1 | 40.0kW | 40 | 40 | 0.8 | 0.8 | 0.75 | 32.00 | 24.00 | 40.00 | 60.78 | 24.00 | 768.0 |