PROPOSAL ON 2MW GAS TURBINE CO-GENERATION POWER STATION CONTENTS●
BRIEF INTRODUCTION ●
PRINCIPLES OF 2MW GAS TURBINE CO-GENERATION STAION OPERAION ●
PERFORMANCE PARAMETER ●
REQUIREMENT FOR QUALITY OF FUEL
AND WATER
●
CONTROL FOR ENVIROMENTAL PROTECTION ●
CONTENT OF SUPPLY ●
TECHNICAL SERVICE CHAPTER
I
BRIEF
INTRODUCTION
2MW
type gas turbine, one of the series, is the
item which is recommended by
the state for its energy-saving environmental protection and advanced
technology. It can improve the utility of the surplus coke oven gas, oil field
gas and exhaust gas of oil refinery, especially suiting for coking industry,
petroleum chemistry, oil field and so on . Through
over twenty years development, gas turbine sets have operated approaching five
hundred thousand hours by now. The power station in The comprehensive heat efficiency of gas turbine set is 30 percent higher than that of steam turbine set and the pay back period is 50 percent shorter. The facts have shown, 2MW gas turbine is a mature, stable, reliable, energy-saving product with evident social and economic beneficial results. CHAPTER 2 PRINCIPLES OF 2MW GAS TURBINE CO-GENERATION POWER STATION OPERATION The
gas turbine is started by a starting motor. When it reaches the ignition speed,
the compressed air is mixed with the fuel gas for combustion within the
combustor. The combustion gas with high temperature and high pressure from the
gas generator will drive the power turbine to work. When the running speed of
the set reaches 42 percent of its rated speed, the starting motor will be
automatically disengaged from the set. When the set runs automatically to its
balance speed, the electric generator
which is driven by power turbine will rotate at the same speed and
operate in parallel with network. Fuel supply and output power increase in
accordance with a certain law, the rated load of the set is 2000KW. Exhaust flow
of gas turbine is 16.6Kg/s with 400℃.0.8-1.2Mpa
vapour with the flow of 6.5t/h is produced by the heat recovery boiler, the
boiler exhaust temperature is 190℃.Heat-electricity
co-generation is realized by the packaged set with its comprehensive heat
efficiency reaching 70 percent or higher . CHAPTER 3PERFORMANCE PARAMETER●
Gas Turbine
engine (under ISO)
Fuels: Coke-oven
gas, light diesel, oil field gas, natural gas and so on . ●
Heat
Recovery Boiler (supplying with vapour-gas) When gas turbine is under the rated working condition
●
Generator
●
Flexible
coupling
CHAPTER 4 REQUIREMENT FOR QUALITY OF FUEL AND WATER ●
Requirement
for fuel (for example coke-oven gas ) When
calorific value is 17.9MJ/Nm3 (not less than 15.9MJ/Nm3 )
●
Requirement
for the quantity and quality of water
Cooling water is used by circulation, water exhausted amount is 2t/h in
practice.
In
order to prolong the life of the boiler, the requirement for water quality
shall meet the international standard. CHAPTER
5 CONTROL
FOR ENVIRONMENTAL PROTECTION ●
Noise
control Noise
of inlet and exhaust air is disposed by filter silencer in gas turbine unit,
Noise meet the international specification. ●
Vibration control Isolation
measure is adopted in gas turbine unit and compressor to control the vibration. ●
Discharge
control Fuel
is burnt thoroughly , not causing draining pollution; exhaust temperature of
boiler is 190℃,
not causing heat pollution. CHAPTER
6
CONTENT
OF SUPPLY
The set of 2MW gas turbine co-generation power station chiefly consists of the following parts. ●
Gas Turbine
section WJ6G1
light gas turbine engine Inlet
filter of gas turbine. Inlet
spray shell of gas turbine. Joint-support
for both gas turbine and generator. Exhaust
unit of gas turbine. External
lube oil system of gas turbine. Fuel
(liquid or gas fuel ) supply and adjustment system of gas turbine. Main
and auxiliary support of gas turbine. ●
Generator
section Three-phase
AC synchro-generator Ventilation
(cooling ) unit of generator Bearing
lube and jack-up unit of generator Starting
system for turbine-generator Excitation
unit. ●
Recovery
boiler Recovery
heat exchanger Vapor
and water separator Heat-water
circulating system Boiler
water supply and regulation system Vapor
pipe assembly Smoke
exhaust unit of recovery boiler ●
Switch Unit High
voltage switch cabinet (four to five ) 400/230v
station distribution cabinet ●
Control System ●
DC control cabinet ●
AC control cabinet ●
Protection system ●
Main control desk ●
Control Desk of Recovery Boiler ●
Connecting Wires and cables use
in the Station. ●
Primary Instrument Installing
Board. ●
Terminal Box ●
Special Tools ●
Floor Bolt of installation
equipment CHAPTER
7
TECHNICAL
SERVICE
●
The supplier will supply the
Instructional Manual for the Power station and maintenance manuals for various
equipments. ●
If required by the purchaser,
the supplier can offer the service of operation of the equipment of the power
station. ●
The customer may get help in
training the personals in proper operation and maintenance procedures. ●
To provide spares for the usage
of one or two years. ●
The warranty period for the
equipment of power station is one year from acceptance . ●
The supply of spare parts
is guaranteed. |
|
-------------------------------------------------------------------------------------------
|