BASIC CHECKLIST OF A THERMAL POWER PLANT PROJECT
Sub:
I. GENERAL INFORMATION OF CUSTOMER:
A. Contact Information
Name: |
|
Title: |
|
Company: |
|
Tel: |
|
Fax: |
|
E-mail 1: |
|
E-mail 2: |
|
Address : |
|
Website: |
|
Brief Company Background
Industry Type: |
Aluminium Smelter |
Existing Factory Production Capacity: |
n/a-new factory |
Power Source: |
n/a-new factory |
Existing Self-owned Power Plant Capacity: |
n/a - new factory |
Power Shortage for Production: |
1400MW new supply required |
Other Problems needs to be solved: |
Coal handling facility needed, flue-gas desulfuriser to meet EIA emissions requirement
|
I. SPECIFIC INFORMATION ON THE PLANT REQUIRED:
A. General Information
Project Characteristic: |
Private Project
|
New Plant
|
Possible Future Expansion Plans/Proposals: |
No |
Purpose of Power Plant: |
Self-owned Power Supply Station
|
Project Construction Method: |
EPC
|
Project Construction Method: |
N EPC
|
Planned Schedule: |
Start: Nov 2007
Completion: Nov 2009 |
Project and Import License |
Smelter License confirmed, power generation license not yet obtained |
Project competition status: |
N Negotiation Bid |
Potential competitors: |
Used and refurbished machines
|
A. Requirement Details for Proposed Power Plant
Proposed Power Plant: |
Capacity: 1400MW in 4 x 350MW or other configurations to be proposed by manufacturer
Codes/Standards required:
N GB
|
Boiler: |
Type: To suit manufacturer’s design
Capacity (t/h): To suit manufacturer’s design
Steam Pressure (Mpa): To suit manufacturer’s design
Steam Temperature ( ºC):To suit manufacturer’s design
Feed Water Temperature ( ºC) : 25 - 32 C |
Turbine: |
Type: To suit manufacturer’s design
Output Requirement (KW): to suit 1400MWe output
Exhaust Pressure (Barg): To suit manufacturer’s design
Process Steam Requirement (if any)
Quantity (t/h): n/a
Pressure (Barg): n/a
Temperature ( ºC):n/a |
Generator: |
Output Requirement (KW): 1,400,000
Output Voltage (KV): to be determined by Smelter Plant
Frequency (Hz): 50
Excitation Type: To suit manufacturer’s design |
Emission Requirement: |
World Bank Emissions standard to be used as guideline. Final requirement after EIA approval.
|
Owner’s Brand Preference for Main Equipment: |
N Chinese Product |
Other Special Requirement (Please Specify): |
O&M contract with availability, capacity and heat rate guarantee to be proposed by manufacturer
|
I. DESIRED SCOPE OF SUPPLY
A. Civil Work: Included
B. Installation and Commissioning: Included
C. Boiler and Auxiliary equipment: Included
D. Turbine and Auxiliary equipment: Included
E. Generator and Auxiliary equipment: Included
F. Fuel handling system: Included
G. Water Treatment system: Included
H. Electricity System: Included
I. DCS and Instrumentation: Included
Cooling Water System: Included
I. INFORMATION NEEDED FROM THE OWNER
A. Site Information:
Location: |
Latitude: 4° 1'38.75"N
Longitude: 103°22'13.35"E (approx location) |
Site Layout (if available): |
|
Site Conditions (please attach the reports concerned): |
Meteorological Condition <Info not available yet>
Topographical Condition <Info not available yet>
Geological Condition <Info not available yet> |
Distances of fuel, power, water, etc, from the site: |
Fuel: Coal to be imported thru jetty about 3km away
Power: at site boundary
Water: at site boundary
Other (Please Specify): |
Distance to Consumption Points: |
Proposed Plant ~ End User: Adjacent to end user
Proposed Plant ~National Grid: |
Information on the existing system (if the expansion project is applied):
|
Layout of The Factory
Existing Water Treatment System:
Factory Existing Electricity Single Line Diagram
Existing Transformers Specification:
Other Systems (Please Specify):
|
B. Fuel Specification (please attach analysis report if available):
Type: |
Sub-butuminous coal (values below are approximate and final fuel spec will be discussed to suit manufacturer’s machines) |
LHV (Kcal): |
4800 (AR Basis) |
Carbon Content (%): |
35-58% (Air Dried Basis) |
Volatile Content (%): |
27-43.3% (Air Dried Basis) |
Sulfur Content (%): |
<1% (Air Dried Basis) |
Ash Content (%): |
<15.5% (Air Dried Basis) |
Moisture (%): |
28% (AR Basis) |
C. Raw Water Analysis (please attach analysis report if available):
Hardness: |
-no info yet- |
PH Value: |
-no info yet- |
Conductivity: |
-no info yet- |
Temperature: |
-no info yet- |
Pressure: |
-no info yet- |
Total Alkalinity: |
-no info yet- |
Total Dissolved Oxygen: |
-no info yet- |
Ca/Mg/S/Cl/Fe/Si/O2 Content: |
-no info yet- |
I. FINANCIAL DATA & CONDITIONS:
Proposed Source of Financing: |
Syndicated local and foreign loan |
Proposed Capital Investment on The Project and Estimated Cost of Equipment/Accessories for Budgeting Purposes: |
|
Banking reference: |
|
Other relevant information on customer's financial position: |
|
Capacity: 1400MW in 4 x 350MW or other configurations to be proposed by manufacturer
Codes/Standards required:
N GB
Boiler:
Type: To suit manufacturer’s design
Capacity (t/h): To suit manufacturer’s design
Steam Pressure (Mpa): To suit manufacturer’s design
Steam Temperature ( ºC ):To suit manufacturer’s design
Feed Water Temperature (ºC ): 25 - 32 C
Turbine:
Type: To suit manufacturer’s design
Output Requirement (KW): to suit 1400MWe output
Exhaust Pressure (Barg): To suit manufacturer’s design
Process Steam Requirement (if any)
Quantity (t/h): n/a
Pressure (Barg): n/a
Temperature ( ºC) :n/a
Generator:
Output Requirement (KW): 1,400,000
Output Voltage (KV): to be determined by Smelter Plant
Frequency (Hz): 50
Excitation Type: To suit manufacturer’s design
Emission Requirement:
World Bank Emissions standard to be used as guideline. Final requirement after EIA approval.
Owner’s Brand Preference for Main Equipment:
N Chinese Product
Other Special Requirement (Please Specify):
O&M contract with availability, capacity and heat rate guarantee to be proposed by manufacturer
|