Email: [email protected]   WhatsApp/WeChat: +0086-13801218512
  
Homepage   |   Power Generation   |   Top Spare parts   |   spare parts   |   China OEM Equipment and Spare Parts   |   Project Financing    |   Equipments   |   China Small EPC Contractor   |   Transmission   |   Financing-Ebook   |   Contact Us   |   Used Equipment   |   download   |   sitemaps   |   Project-Equipment-Parts-Enquiry   |   供货商Supplier   |   Exchange Link   |   Breaking News  
Mail List

E-mail:

     上方导航  
       Homepage  
       Power Generation  
       Top Spare parts  
       spare parts  
       China OEM Equipment and Spare Parts  
       Project Financing   
       Equipments  
       China Small EPC Contractor  
       Transmission  
       Financing-Ebook  
       Contact Us  
       Used Equipment  
       download  
       sitemaps  
       Project-Equipment-Parts-Enquiry  
       供货商Supplier  
       Exchange Link  
       Breaking News  
     下方导航  

Diesel Generator Proposal

Power Plant Proposal
Required Information for Power Plant Project design and quotation

Home > HomePage > Spare Parts > Used Power Plant - Used Power Plant GE-LM2500

Buyer     Inquiry Basket     Supplier     Register


Used Power Plant GE-LM2500


Item NoDescriptionQTYBrandP/NProduct NameDelivery TimeConditionType
749Please find attached another opportunity about LM2500 and some details available. REF.N. N° MW Hz Fuel LM 2500 LOCAT HOURS PRICE Comment ITEM 27 2 25 50 NG GE LM 2500 PE SAC, Rebuilt 60/50Hz, 25 MW Rebuilt 4000 hours, 12000 hours LOW $ EACH We have two LM2500 PE SAC with 6 stage powerturbine available. One has just a few thousand hour after overhaul by GE so i think that would propably fit your project better than the other that has more hours. The engine was overhauled at GE Rheden, Netherlands in 2012 and kept as a spare engine for a gascompressor station. The engine was in preserved and maintained on a regularly after overhaul until it was put in operation in the gascompressor plant on early March 2019 when it was operated approx 3.600-4.000 Hours until the complete compressor station was shut down and decommissioned in July-August 2019. We dont have the exact running hours from May until shutdown, as we dont know the exact date the operator closed down the gaswell and compressor station, we only have been informed it was summer of 2019, so the engine could have less running hours than stated above it it was shot down in may-june 2019. After the shut down, the engine was preserved and it still being preserved/maintained on a regular basis. Remaining running hours before hotsection service 21-23.000 Hours on gasfuel (if GE recommendations are followed). Attached are the overhaul report from Rheden and some pictures. The engine has only been running on gas fuel, is currently equipped with gas fuel nozzles and manifolds, hydraulic starter and Woodward digital fuel controller/VSV controller. The second engine was also overhauled by GE and has the same setup but has run approx 12.000 hours (on gas fuel only).Used Power PlantGE-LM2500used power plant, equipment, spare parts, prior to sales, or just as information, not accurate or not for specific plant only.
Pubdate: 2022/4/26 16:56:26


Click add item to inquiry basket      Click Copy Shared LinksInquiry Basket

Pageviews: 8



Statement: Any reference to the OEM part number or other OEM information is for the purpose of identification only and does not imply that the part was manufactured by the Original Equipment Manufacturer.

All the brands and trademarks in the whole domain of the website belong to their own owners and does not mean that we are their authorized partner or dealer. All the information in this website is only for reference, we do not assure its accuracy.

This statement supersedes all other claims and statements on all pages, files, pics and information within this whole web domain.

Copyright©2006-2019 Leda Greenpower Beijing ICP Reg. No: 10010978.   Fax:0086-10-84161062  E-mail: [email protected]

JingGongAnBeiAn 11010802035914 Hao