1.0.Equipment operating status:
Commissioning date: September 2001 Fuel: natural gas
Total operating hours: 317,78.1 Total ignition times: 131
The unit was normally shut down in April 2008, with normal operation parameters and turning once a week according to the operation rules. Since 2009, monthly ignition started at full speed without load. In April 2012, demolition and renovation.
Fuel: natural gas
Running hours: 31232.3 hours
设备运行状况�?投产时间�?001�?�? 使用燃料:天然气
总运行小时数�?1778.1小时 总点火次�? 131�?机组�?008�?月正常停机,运行参数正常,按照操作规程每周盘车一次�2009年开始每月点火全速无负荷启动一���?012�?月拆迁翻新�
燃用燃料:天然气
运行小时�?1232.3小时
2.0. Equipment maintenance status:
In 2003, the unit was overhauled to replace the compressor rotor. In July 2005, a medium repair was carried out to replace a set of turbine stator rings. In August 2006, an overhaul was carried out to replace a set of gas turbine No. 2 bearings and 10 combustion chamber flame tubes. In October 2007, there was a minor repair, with 10 fuel nozzle vortexes and 5 combustion chamber transition sections replaced. In March 2008, it was repaired once, replacing 5 combustion chamber transition sections, 10 combustion chamber flame tubes, and replacing a set of turbine stator rings
设备维修状况�?2003年机组进行一次返厂大�?更换压气机转子;2005�?月进行一次中修,更换透平一��静叶环一套,2006�?月大修一次,更换燃机2号轴承一套,燃烧室火焰筒10个;2007�?0月小修一次,更换燃料喷嘴旋涡�?0个,燃烧室过渡段5个;2008�?月中修一次,更换燃烧室过渡段5个,燃烧室火焰筒10个,更换透平一��静叶环一套� | | Used Power Plant | GE-PG6561B | used power plant, equipment, spare parts, prior to sales, or just as information, not accurate or not for specific plant only. | | | |