Email: [email protected]   WhatsApp/WeChat: +0086-13801218512
  
Homepage   |   Power Generation   |   Top Spare parts   |   spare parts   |   China OEM Equipment and Spare Parts   |   Project Financing    |   Equipments   |   China Small EPC Contractor   |   Transmission   |   Financing-Ebook   |   Contact Us   |   Used Equipment   |   download   |   sitemaps   |   Project-Equipment-Parts-Enquiry   |   供货商Supplier   |   Exchange Link   |   Breaking News  
Mail List

E-mail:

     上方导航  
       Homepage  
       Power Generation  
       Top Spare parts  
       spare parts  
       China OEM Equipment and Spare Parts  
       Project Financing   
       Equipments  
       China Small EPC Contractor  
       Transmission  
       Financing-Ebook  
       Contact Us  
       Used Equipment  
       download  
       sitemaps  
       Project-Equipment-Parts-Enquiry  
       供货商Supplier  
       Exchange Link  
       Breaking News  
     下方导航  

Diesel Generator Proposal

Power Plant Proposal
Required Information for Power Plant Project design and quotation

Home > HomePage > Spare Parts > Used Power Plant - Used Power Plant GE-PG6561B

Buyer     Inquiry Basket     Supplier     Register


Used Power Plant GE-PG6561B


Item NoDescriptionQTYBrandP/NProduct NameDelivery TimeConditionType
659PG6561B燃气-蒸汽联合循环机组 PG6561B gas-steam combined cycle unit 1.0.Equipment operating status: Commissioning date: September 2001 Fuel: natural gas Total operating hours: 317,78.1 Total ignition times: 131 The unit was normally shut down in April 2008, with normal operation parameters and turning once a week according to the operation rules. Since 2009, monthly ignition started at full speed without load. In April 2012, demolition and renovation. Fuel: natural gas Running hours: 31232.3 hours 设备运行状况�?投产时间�?001�?�? 使用燃料:天然气 总运行小时数�?1778.1小时 总点火次�? 131�?机组�?008�?月正常停机,运行参数正常,按照操作规程每周盘车一次�2009年开始每月点火全速无负荷启动一���?012�?月拆迁翻新� 燃用燃料:天然气 运行小时�?1232.3小时 2.0. Equipment maintenance status: In 2003, the unit was overhauled to replace the compressor rotor. In July 2005, a medium repair was carried out to replace a set of turbine stator rings. In August 2006, an overhaul was carried out to replace a set of gas turbine No. 2 bearings and 10 combustion chamber flame tubes. In October 2007, there was a minor repair, with 10 fuel nozzle vortexes and 5 combustion chamber transition sections replaced. In March 2008, it was repaired once, replacing 5 combustion chamber transition sections, 10 combustion chamber flame tubes, and replacing a set of turbine stator rings 设备维修状况�?2003年机组进行一次返厂大�?更换压气机转子;2005�?月进行一次中修,更换透平一��静叶环一套,2006�?月大修一次,更换燃机2号轴承一套,燃烧室火焰筒10个;2007�?0月小修一次,更换燃料喷嘴旋涡�?0个,燃烧室过渡段5个;2008�?月中修一次,更换燃烧室过渡段5个,燃烧室火焰筒10个,更换透平一��静叶环一套�Used Power PlantGE-PG6561Bused power plant, equipment, spare parts, prior to sales, or just as information, not accurate or not for specific plant only.
Pubdate: 2022/4/26 16:56:25


Click add item to inquiry basket      Click Copy Shared LinksInquiry Basket

Pageviews: 2



Statement: Any reference to the OEM part number or other OEM information is for the purpose of identification only and does not imply that the part was manufactured by the Original Equipment Manufacturer.

All the brands and trademarks in the whole domain of the website belong to their own owners and does not mean that we are their authorized partner or dealer. All the information in this website is only for reference, we do not assure its accuracy.

This statement supersedes all other claims and statements on all pages, files, pics and information within this whole web domain.

Copyright©2006-2019 Leda Greenpower Beijing ICP Reg. No: 10010978.   Fax:0086-10-84161062  E-mail: [email protected]

JingGongAnBeiAn 11010802035914 Hao