457 | Thanks for prompt reply, the offer US$ Ex-site is for 1 x PG9171E gas turbine which is base on your enquiry for 1 x PG9171E GT, excludes the steam turbine and HRSG, step-up transformer (We may offer the rest equipment, steam turbine, step-up transformer and HRSG if required.); Dismantling, packing and transport to port is excluded, but can be worked on this scope if needed.
Yes there is 2 units PG9171E of similar condition, year of built and running hours at site.
All 2 units PG9171E CCGT are still on foundation and both possible to arrange test run.
But the test run is not any day you specified, we may notice you in advance. ( this way is FOC )
If you like to conduct the test run on the day you appointed, then you have to pay for the cost for testing.
Payment terms :
1) 30% on signing contract,
2) 20% before dismantling
3) 20% after finish of dismantling and packing, and equipment not leaving the plant.
4) 30% before leaving power plant site
Attached please find the documents
1) 2 x GE PG9171E CCGT power plant introduction
2) Performance test of GE PG9171E CCGT
The translation of the performance test is only upto annex 2 and not the full copy as the full copy is too long and 109 pages. | | Used Power Plant | GE-PG9171E | used power plant, equipment, spare parts, prior to sales, or just as information, not accurate or not for specific plant only. | | | |