Email: [email protected]   WhatsApp/WeChat: +0086-13801218512
  
Homepage   |   Power Generation   |   Top Spare parts   |   spare parts   |   China OEM Equipment and Spare Parts   |   Project Financing    |   Equipments   |   China Small EPC Contractor   |   Transmission   |   Financing-Ebook   |   Contact Us   |   Used Equipment   |   download   |   sitemaps   |   Project-Equipment-Parts-Enquiry   |   供货商Supplier   |   Exchange Link   |   Breaking News  
Mail List

E-mail:

     上方导航  
       Homepage  
       Power Generation  
       Top Spare parts  
       spare parts  
       China OEM Equipment and Spare Parts  
       Project Financing   
       Equipments  
       China Small EPC Contractor  
       Transmission  
       Financing-Ebook  
       Contact Us  
       Used Equipment  
       download  
       sitemaps  
       Project-Equipment-Parts-Enquiry  
       供货商Supplier  
       Exchange Link  
       Breaking News  
     下方导航  

Diesel Generator Proposal

Power Plant Proposal
Required Information for Power Plant Project design and quotation

Home > HomePage > Spare Parts > Used Power Plant - Used Power Plant ConocoPhillips-SNG Plant

Buyer     Inquiry Basket     Supplier     Register


Used Power Plant ConocoPhillips-SNG Plant


Item NoDescriptionQTYBrandP/NProduct NameDelivery TimeConditionType
403Following SNG Plant available for sale . After installation, they did not use this plant at all. This SNG production plant that make natural gas by using coal is right for country that does not produce gas. SNG(Synthetic Natural Gas) Production Plant Commissioning year: 2014 Production capacity: 500,000ton/year(0.7 B NM3/year) Coal Consumption : 2 Million ton/year Area: Approx. 400,000m2 Design and Make: ConocoPhillips(U.S.A) Haldor Topsoe(Denmark) Linde(Germany) Licensor: CB&I (Gasification) ConocoPhillips(E-Gas�?Technology)(U.S.A) Linde (AGR)( Gas Treatment Contractor)(Germany) Haldor Topsoe (Methanation)(Denmark) Front End Engineering Design (FEED) Contractor: Jacobs �?5500mt/day sub-bituminous coal processed into syngas and catalytically converted to methane. �? 2 + 1 Gasification Trains �? Feedstock : 5,500 tpd sub-bituminous coal, up to 20% petcoke blend (Process) Coal-Gasification of coal-Heat recovery-Dust collection-Water Gas Production-Desulfurization/Separation of CO2-SNG Synthetic –Drying/Compressing-SNG Product (Features) �? Methane production in 2ndstage results in smaller shift, AGR & methanationunits �?HP steam coupled with process heat from methanation enhances thermal efficiency �?Long operating experience with petroleum coke and sub-bituminous coal at world scale �? Low start-up emissions �? Higher capacity trains �? Lower carbon slag product �? Leverages KY NewGasdesign experience. �?E-Gas�?Technology enhancements improve SNG project economics. �?Builds on lengthy E-Gas�?operating experience processing. petcoke, sub-bituminous coal and bituminous coal. Price : Upon request Please advise any interestUsed Power PlantConocoPhillips-SNG Plantused power plant, equipment, spare parts, prior to sales, or just as information, not accurate or not for specific plant only.
Pubdate: 2022/4/26 16:56:23


Click add item to inquiry basket      Click Copy Shared LinksInquiry Basket

Pageviews: 1



Statement: Any reference to the OEM part number or other OEM information is for the purpose of identification only and does not imply that the part was manufactured by the Original Equipment Manufacturer.

All the brands and trademarks in the whole domain of the website belong to their own owners and does not mean that we are their authorized partner or dealer. All the information in this website is only for reference, we do not assure its accuracy.

This statement supersedes all other claims and statements on all pages, files, pics and information within this whole web domain.

Copyright©2006-2019 Leda Greenpower Beijing ICP Reg. No: 10010978.   Fax:0086-10-84161062  E-mail: [email protected]

JingGongAnBeiAn 11010802035914 Hao